If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-059-20404 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.14,"lon":-81.66,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Knox Township | |
Operator Name: COLUMBIA GAS TRANSMISSION LLC | |
Well Pad ID: | |
Farm/Lease Name: BATES-PIPPIN | |
License Status: Final Restoration | |
License Date: 2013-04-08 | |
Spud Date: 1946-03-18 | |
Spud Drilling Contractor: | |
Final Drill Date: 1946-04-24 | |
Well Total Depth: 3138.00 ft | |
Configuration: Vertical | |
Latitude: 40.140000 | |
Longitude: -81.660000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1946-03-18 | |
Completed | 1946-04-24 | |
Reached Total Depth | 1946-04-24 | |
CO | 1981-08-28 | 218 ENERGY RECOVERY CO GeoDate 8/28/81 |
APP | 2013-04-08 | Proposed Formations:ORISKANY, Issued Date:4/8/2013, Expired Date:4/8/2015 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:SO, Proposed Well Class: |
Plugged/Abandoned | 2014-09-05 | |
Construction Permit Expires | 2015-04-08 | |
Record Last Modified | 2017-02-10 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3114 | 3130 | 0 |
3114 | 3130 | 0 | |
3114 | 3130 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 0 | 60 Qts | 0 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1795771847 | 2015-2-4 0:00:0 | FR | No Violations | 0.50 |
-491538084 | 2014-8-27 0:00: | PB | No Violations | 1.50 |
-582086583 | 2013-10-18 0:00 | SO | No Violations | |
-865094427 | 2014-9-3 0:00:0 | PB | No Violations | 1.50 |
0491538084 | 2014-08-27 | Plug / Plug Back | No Violations | On the day of my inspection I witnessed that Columbia Gas was on site and had retrieved 133 joint of 3 inch 9.2#/ft. seamless pipe at 3126.15 feet and the packer 6.75 feet for a total of 3132.85 feet. Columbia gas was preparing to trip back in the hole with 2.875 inch drill pipe to circulate and set bottom hole plug tomorrow. |
0582086583 | 2013-10-18 | Storage Well | No Violations | Idle storage well owner has valid plugging permit they are waiting on service rig to plug said well. |
0865094427 | 2014-09-03 | Plug / Plug Back | No Violations | On the date of inspection I was informed by Columbia Gas Transmission representative Terry VanSickle that three plugs were set at the bottom of the well starting at a depth of 3132 feet. Petroset spotted three 500 foot plugs from 3132 feet to 2632 feet, from 2632 feet to 2132 feet, and from 2138 feet to 1632 feet. The open hole size plugged was assumed to be 6.25 inch diameter. Petroset pumped 100sk for each plug of Class A cement at 15.6ppg, 1.2 yield, with 5% salt, and 0.25lbs/sk of flake. Columbia will attempt to pull the 6.625 inch casing out of the well the following day and continue cementing after tagging the plugs on 9-5-14. The plugging was not witnessed due to a meeting. |
1290679236 | 2010-11-24 | Storage Well | No Violations | Inspection revealed that well is equipped with 10 conductor and 5.5 casing and 3.5 casing there is evidence at site that well was recently worked on and is currently not on line. |
1409849074 | 2014-09-04 | Plug / Plug Back | No Violations | On the date of inspection I was informed by Columbia Gas representative Terry VanSickle that the 6.625 inch casing had been mechanically cut at a depth of 585 feet. They would be pulling the 585 feet of casing out of the hole today using a cutting torch to separate joints. Columbia has Petroset scheduled for the following day to cement from the surface casing to the top of hole. |
1409945523 | 2014-09-05 | Plug / Plug Back | No Violations | On the day of my inspection I witnessed that Columbia Gas had retrieved a total of 578.15 feet of 6.625 inch casing and tagged last cement plug at 1719 feet. Columbia Gas pulled up to 1709 feet and Petroset was on site and gained circulation and pumped a 500 foot gel spacer. Columbia Gas pulled 22 joints of drill pipe and Petroset gained circulation and set a 100 sack 50/50 Poz cement plug from 1209 feet to 709 feet. Columbia Gas pulled 15 joints of 2.375 inch drill pipe and Petroset broke circulation and set a 275 sack 50/50 Poz cement plug from 709 feet to 209 feet. Petroset ran out of cement and went back to shop to reload pod. Columbia Gas ran 7 joints of 2.375 inch drill pipe and tagged up at 217 feet and Petroset gained circulation and set a 50 sack 50/50 Poz cement plug from 217 to surface. Columbia Gas pulled drill pipe and cement stayed at surface. |
1795771847 | 2015-02-04 | Final Restoration | No Violations | On the day of my inspection I witnessed that the site passed final restoration according to ORC 1509.072B. |
For data sources see[5]