Well ID: 34-055-22127
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Middlefield Township
Operator Name: EQUITY OIL & GAS FUNDS INC
Well Pad ID:
Farm/Lease Name: MILLER M
License Status: Producing
License Date: 2010-09-09
Spud Date: 2010-11-10
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2010-11-15
Well Total Depth: 4245.00 ft
Configuration: Vertical
Latitude: 41.430000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-09-09 Proposed Formations:CLINTON, Issued Date:9/9/2010, Expired Date:9/8/2012 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-11-15
Completion Report Received 2011-05-10
Construction Permit Expires 2012-09-08
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-08-03 4061 4123 83
4061 4123 83
4061 4123 83

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-11-29 H2O 15 83000 Gal 40000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 EQUITY OIL & GAS FUNDS INC 1115.00 411.00 0
2012 EQUITY OIL & GAS FUNDS INC 2977.00 767.00 365
2013 EQUITY OIL & GAS FUNDS INC 1908.00 408.00 365
2014 EQUITY OIL & GAS FUNDS INC 1732.00 368.00 365
2015 EQUITY OIL & GAS FUNDS INC 1792.00 376.00 365
2016 EQUITY OIL & GAS FUNDS INC 1928.00 207.00 365
2017 EQUITY OIL & GAS FUNDS INC 1756.00 222.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 EQUITY OIL & GAS FUNDS INC Brine 352
2012 EQUITY OIL & GAS FUNDS INC Brine 466 365
2013 EQUITY OIL & GAS FUNDS INC Brine 173 365
2014 EQUITY OIL & GAS FUNDS INC Brine 109 365
2015 EQUITY OIL & GAS FUNDS INC Brine 116 365
2016 EQUITY OIL & GAS FUNDS INC Brine 87 365
2017 EQUITY OIL & GAS FUNDS INC Brine 68 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1726630436 2010-11-10 0:00 DD No Violations
-1791713363 2010-11-10 0:00 DD No Violations
-1946068697 2010-11-12 0:00 DD No Violations
0207813777 2010-11-15 Drill / Deepen / Reopen No Violations On site for long string cement. Cementing water pH 7. Kilbarger was the driller. Petroset was the cementer. Hole was logged, top of the Lockport was 3602. Operator ran used pipe. There was issues with the pipe tally, total pipe 4244 Last joint of pipe was on bottom of the hole. 4.5 inch pipe will need cut down and collared. Hole TD was 4245 driller depth, logging depth 4256. Petroset broke circulation ran cement, locked plug down at 1500psi. No lose of circulation during cementing. TD at 4256 top of the lockport 3602 total fill up needed: 754 feet. 7.875 inch hole/ 4.5 inch pipe .2278 X 754 / 1.18= 145.56 sacks of cement, operator ran 200. Weighed cement during job, at the start of the job cement weight was 14.8 last half cement weight was 15.2. Good circulation at all times during job. Lease road was stable. Pits were in good repair. Drainage was contained on site.
1127632358 2012-02-17 Production Wells No Violations Tank battery is in good repair. Lease road is stable.
1289334244 2010-11-09 Drill / Deepen / Reopen No Violations Operator is cutting site. Site is stable. Lease road is stable at this time. Operator is removing topsoil from location and stockpiling it. Tank battery pad has been built.
1291904621 2010-11-30 Drill / Deepen / Reopen No Violations Operator has a swab rig on location is currently flowing the well back. Operator has fracturing tanks on the drilling location and three tanks staged at the tank battery location. Operator has ran a hose from location to the tanks at the tank battery location. Operator was using a tractor with a pump on it to boost the flow of fluid. During inspection there was a line burst. Approximately 2 barrels of fracturing fluid escaped before the operator could get pumps shut down. Operator shut down and replaced section of line. The site had received an inch and a half of rain during the night and during the day. Water was running east and west down the lease road. Leak was on the east side of a rise in the lease road. Fluid flowed into the drainage control area. The amount of water on location made it impractical to attempt a clean up. Water flow was too great and fluid was dispersed too quickly. Requested additional help for the line tender. Lease road was not drivable and it was approximately a 1/4 mile between pump and location and 300 yards between pump and tanks at the battery. Wad Pol had help in rout with an ATV. Reminded employee to make sure he was walking line out into tanks when disconnecting, which he was doing. He was also kinking over lines to prevent spilling fluid while disconnecting. Bull plugs where in the tank valves.
1292878485 2010-12-20 Urban Drill / Deepen / Reopen No Violations Tank battery is roughed in. Site has 1.5 feet of snow on it. Well is a rabbit well. Lease road was stable.
1309356540 2011-06-29 Preliminary Restoration No Violations Well site has topsoil stockpiles remaining that need to be redistributed. Parking areas, soil stockpile areas and well site needs seeded. Work needs completed before PRD can be approved.
1414421369 2014-10-27 Production Wells No Violations My inspection found the well to be equipped with a pumpjack. The well and tank battery are in good repair. The tank battery consists of a 210 BBL production tank, a 25 BBL poly brine tank, and a mechanical separator. The proper identification is located on the tank battery. The lease road is in stable condition.
1726630436 2010-11-10 Drill / Deepen / Reopen No Violations On site for pit construction, permit has Special Permit Conditions, area of thin Glacial till overlying fractured bedrock. Pits were dry, soil was tight brown clay no fractured bedrock noted. Operator lined pit with reinforced liners. Operator has dug a diversion ditch that directs drainage to the west of the location. Diversion ditch discharges into a low bowl shaped area. Drainage appears that it will be contained on site. Requested the operator install silt fence in a horse shoe shape at the point of discharge to control sedimentation. Informed Brine hauler on site, that they need to use dedicated fresh water hosed when pulling water out of streams. Lease road was stable. Fresh water for drilling will be coming out of Swine Creek.
1791713363 2010-11-10 Drill / Deepen / Reopen No Violations Operator called to inform me that during drilling bedrock was hit at 30. Cementing of conductor was waived. HL #1 17 inch drilled to 40. CND was new R-3 32lb pipe landed in bedrock set open ended.
1946068697 2010-11-12 Drill / Deepen / Reopen No Violations On site for BOP test. Charged BOP to 620psi charged hole to 360psi. First test failed BOP lost too much pressure, 60psi. 2nd test Closed BOP at 620psi charged hole to 420psi, pressure bounced up and down for about half a minute stabilized at 420psi after 15minute test, hole pressure was 395psi. Safety fence around pits was up. Location was stable. Lease road was stable.
207813777 2010-11-15 0:00 DD No Violations

For data sources see[9]