X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-055-22058

Well Details

Well ID: 34-055-22058
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Huntsburg Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: MILLER UNIT
License Status: Producing
License Date: 2008-07-09
Spud Date: 2008-10-06
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2008-10-13
Well Total Depth: 4139.00 ft
Configuration: Vertical
Latitude: 41.520000
Longitude: -81.060000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-07-09 Proposed Formations:CLINTON, Issued Date:7/9/2008, Expired Date:7/9/2009 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Change of Owner 2008-07-21 Operator changed from 9, POWER GAS MARKETING & TRANS to 1388, EXCO - NORTH COAST ENERGY INC
Reached Total Depth 2008-10-13
Completion Report Received 2009-03-03
Construction Permit Expires 2009-07-09
Change of Owner 2009-12-14 Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC
Change of Owner 2017-05-01 Operator changed from 7578, ENERVEST OPERATING LLC, to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2017-05-01

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-05-21 3878 3920 34
3878 3920 34
3878 3920 34

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1212 Bbl 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 EXCO - NORTH COAST ENERGY INC 1053.00 118.00 51
2009 ENERVEST OPERATING LLC 4794.00 108.00 92
2010 ENERVEST OPERATING LLC 2782.00 293.00 365
2011 ENERVEST OPERATING LLC 2986.00 242.00 0
2012 ENERVEST OPERATING LLC 1185.00 155.00 366
2013 ENERVEST OPERATING LLC 1181.00 184.00 365
2014 ENERVEST OPERATING LLC 1157.00 63.00 365
2015 ENERVEST OPERATING LLC 1047.00 57.00 365
2016 ENERVEST OPERATING LLC 759.00 133.00 362
2017 ENERVEST OPERATING LLC 453.00 62.00 193
2018 M & R INVESTMENTS OHIO LLC 591.00 72.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 EXCO - NORTH COAST ENERGY INC Brine 281 51
2009 EXCO - NORTH COAST ENERGY INC Brine 460 365
2010 ENERVEST OPERATING LLC Brine 147 365
2011 ENERVEST OPERATING LLC Brine 191
2012 ENERVEST OPERATING LLC Brine 16 366
2013 ENERVEST OPERATING LLC Brine 5 365
2014 ENERVEST OPERATING LLC Brine 0 365
2015 ENERVEST OPERATING LLC Brine 0 365
2016 ENERVEST OPERATING LLC Brine 11 362
2017 ENERVEST OPERATING LLC Brine 6 193
2018 M & R INVESTMENTS OHIO LLC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1214651388 2009-11-2 0:00: PL No Violations
1214651388 2009-11-02 Preliminary Restoration No Violations Lease road is stable and in very good repair. Two gates are up going to the well site and tank battery. Identification sign is up on the tank battery. Barbed wire fence has been installed around the tank battery to prevent livestock from entering the area. Well is a rabbit well. 210BBL tank and a mechanical separator, tank battery dike is in good repair. Annulus is plumbed above ground, appears to be plumbed into tank battery or flow line. Well is in a corn field, corn field is in production. Prelim rest, passed at this time.
1223994697 2008-10-14 Drill / Deepen / Reopen No Violations Drilling is complete. Long string has been ran. Rig moving offsite. Lease road is stable and in good repair.
1345765286 2008-10-07 Drill / Deepen / Reopen No Violations Operator is at 32, appears to be in the Sharon Sandstone, lost circulation. Halliburton is on site mixing mud. Operator is going to attempt to regain circulation. If circulation is not regained, operator is going to drive in a 16 pipe to seal off lost circulation zone. Operator is planning on setting two joints of 11.75 pipe. When CND is cemented in, I spoke to operator about grouting 16 from the top, they agreed. Pits are in good repair. Lease road is in good repair. Spoke to operator regarding the slope of the sides of the pits, specifically there is no slope at the ends of the pit. Sides have very little slope. Operator needs to start sloping pits.

For data sources see[9]

References