34-035-22205

Well Details

Well ID: 34-035-22205
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: BASS ENERGY CO INC
Well Pad ID:
Farm/Lease Name: ELMWOOD UNIT
License Status: Producing
License Date: 2013-05-20
Spud Date: 2013-05-28
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2013-06-03
Well Total Depth: 3806.00 ft
Configuration: Directional
Latitude: 41.370000
Longitude: -81.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-20 Proposed Formations:CLINTON, Issued Date:5/20/2013, Expired Date:5/20/2015 12:00:00 PM, Drilling unit acres:26.68, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-06-03 Frac Focus not fount but box was checked
Completion Report Received 2013-12-20 Frac Focus not fount but box was checked
Construction Permit Expires 2014-05-20 Frac Focus not fount but box was checked
Record Last Modified 2017-02-15 Frac Focus not fount but box was checked

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-12-24 3591 3613 45
3591 3613 45
3591 3613 45

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-06-17 H2O 15 75042 Gal 42000 OTHER Nabors Completion Services

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 BASS ENERGY CO INC 7632.00 476.00 159
2014 BASS ENERGY CO INC 29748.00 1861.00 365
2015 BASS ENERGY CO INC 18654.00 1052.00 365
2016 BASS ENERGY CO INC 7478.00 412.00 365
2017 BASS ENERGY CO INC 9000.00 561.00 365
2018 BASS ENERGY CO INC 6609.00 489.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 BASS ENERGY CO INC Brine 257 159
2014 BASS ENERGY CO INC Brine 604 365
2015 BASS ENERGY CO INC Brine 287 365
2016 BASS ENERGY CO INC Brine 65 365
2017 BASS ENERGY CO INC Brine 189 365
2018 BASS ENERGY CO INC Brine 148 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1212409715 2013-5-20 0:00: DD No Violations
-1423185400 2013-5-25 0:00: DD No Violations
-1508096637 2013-5-24 0:00: DD No Violations
-1517687873 2013-5-30 0:00: DD No Violations
-1705115786 2013-5-29 0:00: DD No Violations
-2040492489 2013-9-23 0:00: UL No Violations
-226015879 2019-10-28 0:00 UP No Violations 0.50
-453291159 2013-5-28 0:00: DD No Violations
0453291159 2013-05-28 Drill / Deepen / Reopen No Violations Drilling is continuing and surface casing is cemented to surface. Test of blowout preventor will be performed in the early morning tomorrow.
0613219318 2015-03-02 UrbanProduction Wells No Violations I inspected this well as part of routine inspection activity. The wellhead and battery are located behind the Concordia Lutheran Church on Brecksville Road. Access to the wellhead is from the Concordia Church at Access to the battery is from the Cleveland Clinic Home Care office facility on Brecksville Road. The wellhead is comprised of a mechanical plunger lift system in a board-on-board enclosure. The battery is comprised of 6 100-barrel production tanks, 1 50-barrel brine tank, and 3 separators inside a separate chain-link enclosure. The battery is shared with the #2-1862 and the #2-2080 wells. Fittings and connections at the wellhead are secure and free from signs of leakage. Gates and load-outs are secure and locked. Signage is present and complete. I did not observe any evidence of impact relating to on-going production activity.
1182335139 2017-08-28 UrbanProduction Wells No Violations I inspected this producing well location as part of routine inspection activity. At the time of this inspection, I observed the following: a wellhead with plunger-lift system and associated tank battery, shared with the Concordia #1-D, and the Scharton #1, located behind a church. Fittings and connections at the wellhead and battery were secure. The enclosure gates were secure. The load-lines were secure. The secondary containment was intact and dry. The dedicated access road to the well and battery which enters from the adjacent Cleveland Clinic facility, was in good condition. I found no signs of problems at this inspection.
1212409715 2013-05-20 Drill / Deepen / Reopen No Violations Crews are beginning to make the location for this unit. Based on my discussions with John from Wildcat, we agree to re-orient the pits to the east to alleviate the need to cut trees and do additional grading, site work restoration. Equipment is arriving but pit construction has not started.
1371075158 2013-06-12 Urban Drill / Deepen / Reopen No Violations Crews from Circle C Excavating are onsite closing drilling pits and grading site. I discuss with Ralph Gregory the results of the 5-day annular pressure monitoring. He indicated the annular pressure has been fairly steady at 60 PSI since well completion.
1371217044 2013-06-14 Drill / Deepen / Reopen No Violations Crews from Appalachian Well Surveys and Nabors are here for well stimulation (perforation and acidize). No problems observed or noted.
1423185400 2013-05-25 Drill / Deepen / Reopen No Violations 11-inch conductor set and cemented to surface this morning. I talk to Tom Wood about making sure the cellar is made liquid tight as required. The cellar was then lined with plastic and is holding fluid. The pit liners are in good condition and there is ample freeboard. The crews are shutting down for the remainder of the holiday weekend.
1508096637 2013-05-24 Drill / Deepen / Reopen No Violations Wildcats rig is onsite and rigging up. I talk to John about getting booms set up around the storm drain inlet. Pits are being completed and lined.
1517687873 2013-05-30 Drill / Deepen / Reopen No Violations Drilling is continuing. Cellar and pits are in good shape. No appreciable fluid loses during drilling. No problems reported or observed.
1705115786 2013-05-29 Drill / Deepen / Reopen No Violations Blow-out preventer tested and passed this morning. Continuation of fluid drilling with no problems reported or observed.
1818164938 2013-05-22 Drill / Deepen / Reopen No Violations Site preparation work is continuing. The silt fencing is in place and looks good. Pit construction has not started yet. The site is being graded and topsoil is being stockpiled on the east side.
2009860756 2013-06-01 Drill / Deepen / Reopen No Violations Drilling at 3,600, with a projected TD of 3820 +/-. Will likely reach TD late tonight, and run casing in the morning.
2040492489 2013-09-23 UrbanPreliminary Restoration No Violations The wellhead has been fitted with a mechanical plunger lift system and is enclosed in a board-on-board fence which is locked. The 8 5/8ths casing is plumbed into production and is showing 50# of pressure. The surrounding area including former pits and areas disturbed by drilling had been re-graded and seeded. Some grass is taking root. The aboveground storage tank (AST) battery is being shared with the Concordia 1-D (#1862) and the Scharton 1 (#2080). The battery is comprised of 6 100-barrel steel production tanks and 1 50-barrel steel brine tank. Spacing and safety equipment are in accordance with rules. Gates are locked and ID placard is present. Secondary containment is adequate. No problems or violations. Preliminary restoration passes.
613219318 2015-3-2 0:00:0 UP No Violations 0.50

For data sources see[9]

References