X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-035-22135

Well Details

Well ID: 34-035-22135
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality:
Operator Name: OHIO VALLEY ENERGY SYSTEMS COR
Well Pad ID:
Farm/Lease Name: PINE
License Status: Producing
License Date: 2010-09-15
Spud Date: 2010-09-20
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-09-28
Well Total Depth: 3826.00 ft
Configuration: Directional
Latitude: 41.330000
Longitude: -81.660000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-10-19 Proposed Formations:OHIO SHALE--CLINTON, Issued Date:10/19/2009, Expired Date:10/19/2010 6:00:00 AM, Drilling unit acres:21.8322, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2010-09-15 Proposed Formations:OHIO SHALE-CLINTON, Issued Date:9/15/2010, Expired Date:9/14/2012 12:00:00 PM, Drilling unit acres:27.2607, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-09-28
Completion Report Received 2011-02-14
Correction to Well 2011-02-25 CHANGE IN TARGET INFORMATION FROM "AS DRILLED SURVEY". FOOTAGE--1241'NL & 1323'EL OF LOT 14. TARGET X= 2, 230, 526 AND TARGET Y= 609,022.
Construction Permit Expires 2011-09-15
Correction to Well 2011-09-30 UNIT SIZE DECREASED TO 25.142 ACRES.
Change of Owner 2018-04-13 Operator changed from 1249, CUTTER OIL CO to 2456, OHIO VALLEY ENERGY SYSTEM CORP
Record Last Modified 2018-04-13

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-05-17 3552 3558 13
2011-05-17 3562 3582 61
3552 3558 13
3562 3582 61
3552 3558 13

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-09-28 N2 0 236000 Mscf 0
2010-09-28 H2O 15 95000 Gal 50000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 CUTTER OIL COMPANY 0.00 1139.00 71
2011 CUTTER OIL COMPANY 9425.00 7945.00 365
2012 CUTTER OIL COMPANY 18544.00 6589.00 366
2013 CUTTER OIL COMPANY 28997.00 5366.00 365
2014 CUTTER OIL COMPANY 13353.00 2465.00 365
2015 CUTTER OIL COMPANY 6348.00 1552.00 365
2016 CUTTER OIL COMPANY 4535.00 1179.00 365
2017 CUTTER OIL COMPANY 3761.00 958.00 365
2018 OHIO VALLEY ENERGY SYSTEMS COR 2248.00 417.00 232

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 CUTTER OIL COMPANY Brine 1753 71
2011 CUTTER OIL COMPANY Brine 138 365
2012 CUTTER OIL COMPANY Brine 123 366
2013 CUTTER OIL COMPANY Brine 158 365
2014 CUTTER OIL COMPANY Brine 55 365
2015 CUTTER OIL COMPANY Brine 127 365
2016 CUTTER OIL COMPANY Brine 101 365
2017 CUTTER OIL COMPANY Brine 69 365
2018 OHIO VALLEY ENERGY SYSTEMS COR Brine 55 232

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1436874731 2018-3-22 0:00: UP No Violations
-1603267621 2010-9-28 0:00: UD No Violations
-2012676635 2011-8-2 0:00:0 UL No Violations 0.50
-716554368 2010-9-28 0:00: UD No Violations
-832019492 2010-9-21 0:00: UD No Violations
-985394737 2017-8-4 0:00:0 UP No Violations 0.50
0392377637 2010-09-27 Urban Drill / Deepen / Reopen No Violations drilling at 3200 on fluid.
0716554368 2010-09-28 Urban Drill / Deepen / Reopen No Violations Cementing 4.5 casing.
0832019492 2010-09-21 Urban Drill / Deepen / Reopen No Violations cementing surface casing not witnessed because Required Training (Ethic).

Bop test witnessed.

0985394737 2017-08-04 UrbanProduction Wells No Violations I inspected this well as part of routine inspection activity. The well and associated battery are located behind the house at the referenced address, and accessed via a shared use drive. At the time of this inspection, fittings and connections at the wellhead and battery were secure and free from signs of leakage or problems. The load-lines were plugged, locked, and secure. Secondary containment was intact and secure. The individual enclosures were locked and secure. The access road was well drained with no signs of wash-outs or erosional deficits. ID signage was present.
1288273703 2010-09-20 Drill / Deepen / Reopen No Violations Conductor cementing.
1436874731 2018-03-22 UrbanProduction Wells No Violations I inspected this well location as part of routine inspection activity. The well and battery are co-located on a parcel occupied by the Ohio Valley Energy Well #2-2096 (Kleppel) . At the time of my inspection, I found the following: wellhead with pump jack system and associated battery in separate board-on-board enclosures. The enclosure gates were locked and secure. The fittings and connections at the wellhead and battery were secure and free from problems. The well was idle pending transfer, but with current production reporting. The interior of the battery, including secondary containment was free from free oil, staining, or other indications of spills, leaks, or problems. The electrical panels and load line valves were locked and secure. I walked and inspected the areas surrounding the well and battery and found no indications of impacts or problems relating to the on-going production activity.
1482502141 2014-07-16 UrbanProduction Wells No Violations I inspected this producing unit as part of routine inspection activity. The well was completed in 09/28/2010. The unti is producing and production reports are current. Elements of the well consist of a production wellhead with standard valve assembly and pump jack system. The wellhead is located in a closed and locked board-on-board enclosure. The 8.625-inch casing is accessible as required. There are no signs of leakage or problems at the wellhead. The aboveground storage tank battery is located south of the well, along the access road. The battery is comprised of a total of 2 steel 140-barrel production tanks, 50-barrel poly brine tank, and horizontal separator. Spacing from well to battery, and spacing of elements within the battery meet regulations. The battery is located in a separate board-on-board enclosure which is gated and locked. The load-outs are bull-plugged and locked. There is process safety equipment in use (carbon filter, low-pressure relief valve, and spark arrestor). The secondary containment at the battery appears well maintained. I did not observe any signs or evidence of leakage, spills, or problems. There is ID signage at the battery and wellhead which are legible and in good condition.
1603267621 2010-09-28 Urban Drill / Deepen / Reopen No Violations Total depth reacked crew rigging up to trip drilling pipe out to run 4.5 casing. To cement late afternoon.
2012676635 2011-08-02 UrbanPreliminary Restoration No Violations Urban Preliminary Restoration due. Preliminary restoration passed.
392377637 2010-9-27 0:00: UD No Violations

For data sources see[9]

References