X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27254

Well Details

Well ID: 34-031-27254
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Jackson Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: WILLIAMS UNIT
License Status: Producing
License Date: 2015-02-20
Spud Date: 2015-03-09
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2015-03-14
Well Total Depth: 3994.00 ft
Configuration: Vertical
Latitude: 40.250000
Longitude: -81.900000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-02-20 Proposed Formations:BEREA THRU CLINTON, Issued Date:2/20/2015, Expired Date:2/19/2017 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-03-14
Completion Report Received 2016-04-26
Construction Permit Expires 2017-02-19
Change of Owner 2018-03-07 Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2018-03-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-04-26 3834 3854 61
3834 3854 61
3834 3854 61

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-04-02 H2O 15 45328 Gal 70000 Producers Service Corporation

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 NGO DEVELOPMENT CORP. 239.00 0.00 188
2016 NGO DEVELOPMENT CORP. 1850.00 379.00 365
2017 NGO DEVELOPMENT CORP. 1891.00 313.00 365
2018 NGO DEVELOPMENT CORP. 768.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 NGO DEVELOPMENT CORP. Brine 1902 188
2016 NGO DEVELOPMENT CORP. Brine 156 365
2017 NGO DEVELOPMENT CORP. Brine 41 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2025949545 2015-3-9 0:00:0 DD No Violations
-2037165555 2015-3-12 0:00: DD No Violations
-502459263 2015-4-29 0:00: PL No Violations
-620194043 2015-7-22 0:00: PL No Violations
-669570644 2015-8-27 0:00: PL No Violations
-799899646 2015-3-9 0:00:0 CS No Violations
0502459263 2015-04-29 Preliminary Restoration No Violations On the day of my inspection I found that NGO had a crew on location working on the preliminary restoration. The well was equipped with tubing and rods. There were five 300 barrel frac tanks on location. I found no leaks or spills.
0620194043 2015-07-22 Preliminary Restoration No Violations On the day of my inspection I found that the well was equipped with a pumping unit that was in operation. The tank battery consisted of three 100 barrel tank, two separators and an earthen dike. The site still needs to be seeded for erosion control. I found no leaks or spills.
0669570644 2015-08-27 Preliminary Restoration No Violations On the day of my inspection I found that the well site and disturbed areas along the lease road had been hydro-seeded. The grass was just starting to come up.
0799899646 2015-03-09 Casing String Witnessed No Violations On the day of my inspection I found that Kilbarger Drilling rig 5 had drilled a 17.5 conductor hole on fluid to a depth of 69. They ran 62 of new 11.75 casing. Petroset established circulation and cemented the casing to surface with 100 sacks of class A cement. Good circulation was maintained throughout the job with 6 barrels of cement returns.
0872565851 2015-03-11 Casing String Witnessed No Violations On the day of my inspection I found that Kilbarger Drilling rig 5 had drilled an 11 surface hole on air to a depth of 675. They ran 632 of new 8.625 casing equipped with three centralizers. Petroset established circulation and cemented the casing to surface with 210 sacks of class A cement. Good circulation was maintained throughout the job with 9 barrels of cement returns.
1186210272 2015-03-06 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling was moving in and rigging up. The pits were not constructed.
1433773165 2015-06-08 Preliminary Restoration No Violations On the day of my inspection I found that the site had been cleared of all drilling equipment and debris. The frac tanks were gone, and the site had been graded. The site still needs grass for erosion control. The wellhead was equipped for a pumping unit. There was a crew on location installing the tank battery. The well was shut in and I found no leaks or spills.
1563089317 2015-03-10 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 5 was drilling an 11 surface hole on air. They were at a depth of 220. The permit was posted, there were no sags in the pit liner and there were no leaks or spills.
1810094203 2015-10-22 Preliminary Restoration No Violations On the day of my inspection I found that the well site, tank battery site and disturbed area along the access road were all growing with well established short grass. I found no signs of erosion. This site passes preliminary restoration.
1923435270 2015-03-27 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the pits had been closed. The well was shut in and I found no leaks or spills.
2025949545 2015-03-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 5 was rigged up and ready to spud the well. The pit was dug and lined. The permit was posted in the doghouse.
2037165555 2015-03-12 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 5 was drilling on air with a 7.875 bit. They were at a depth of 2148. There were no sags in the pit liner and I found no leaks or spills around the drill site.
2142357645 2015-03-19 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the drilling rig had moved off of the location. The well was shut in. The pit liner was starting to fall in on the mud pit. I contacted Scott Kees. He claimed that they had a crew en route to close the pit.
872565851 2015-3-11 0:00: CS No Violations

For data sources see[9]

References