X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-27165

Well Details

Well ID: 34-031-27165
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Adams Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: SPALDING
License Status: Producing
License Date: 2013-09-05
Spud Date: 2013-10-07
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-10-13
Well Total Depth:
Configuration: Vertical
Latitude: 40.340000
Longitude: -81.620000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-08-08 Proposed Formations:BEREA - COPPER RIDGE, Issued Date:8/8/2011, Expired Date:8/7/2013 12:00:00 PM, Drilling unit acres:190, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2013-09-05 Proposed Formations:BEREA-CLINTON, Issued Date:9/5/2013, Expired Date:9/5/2015 12:00:00 PM, Drilling unit acres:186.573, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-10-13
Completion Report Received 2015-08-20
Construction Permit Expires 2015-09-05
Change of Owner 2018-03-07 Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2018-03-08

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-08-24 4614 4682 62
4614 4682 62
4614 4682 62

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/14/2013 11/14/2013 4828 92355

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Pro Clay Firm LP Producers Service Corp clay control ethylene glycol 107-21-1 40 0.00425 35
2-propen-1-aminium, N, N-dimethyl-N-2propenyl 26062-79-3 0 0.00213 17
Buffer 1 Producers Service Corp pH Control Sulfamic Acid 5329-14-6 100 0.00613 50
Pro Clear Slik-2 Producers Service Corp Friction Reducer methanol 67-56-1 5 0.00159 13
alchols, C12-16, ethoxylated 68551-12-2 70 0.02233 182
2-butoxyethanol 111-76-2 10 0.00319 26
Irontrol Producers Service Corp iron control sulfamic acid 5329-14-6 70 0.00858 70
IC Acid Producers Service Corp Acid Hydrochloric Acid 7647-01-0 15 0.04923 402
Pro NE-21 Producers Service Corp surfactant 2-butoxyethanol 111-76-2 40 0.00797 65
alchohols, C12-16, ethoxylated 68551-12-2 70 0.01396 114
methanol 67-56-1 30 0.00598 49
Pro Breaker 4 Producers Service Corp breaker Sucrose 57-50-1 46 0.00015 1
Ethylene Glycol 107-21-1 14 0.00005000 0
Pro Gel 4 Producers Serivce Corp gel Guar Gum Blend 9000-30-0 100 0.23004 1878
FLC Producers Service Corp fluid loss modified polysaccaride 9005-25-8 50 0.01838 150
crystalline silica in form of quartz 14808-60-7 65 0.02389 195
water NGO Development treatment carrier water 7732-18-5 100 94.4227 770702
Silica Sand Producers Service Corp proppant Crystalline Silica (quartz 14808-60-7 100 4.90061 40000
Pro Hib II Producers Service Corp Inhibitor propargyl alcohol 107-19-7 30 0.00015 1
dimethylcocoamine, bis(chloroethyl)ether,

diquaternary ammonium salt

68607-28-3 60 0.0003 2
glycol ethers 111-76-2 40 0.0002 2
ethylene glycol 107-21-1 40 0.0002 2
ethoxylated nonylphenol 68412-54-4 10 0.00005000 0.405
methanol 67-56-1 30 0.00015 1

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 NGO DEVELOPMENT CORP. 8092.00 193.00 338
2015 NGO DEVELOPMENT CORP. 5745.00 99.00 365
2016 NGO DEVELOPMENT CORP. 4333.00 50.00 365
2017 NGO DEVELOPMENT CORP. 3419.00 75.00 365
2018 NGO DEVELOPMENT CORP. 1825.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 NGO DEVELOPMENT CORP. Brine 176 338
2015 NGO DEVELOPMENT CORP. Brine 111 365
2016 NGO DEVELOPMENT CORP. Brine 94 365
2017 NGO DEVELOPMENT CORP. Brine 0 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1060832029 2014-10-2 0:00: PL No Violations
-1610835078 2013-10-9 0:00: DD No Violations
-1789777297 2013-10-8 0:00: DD No Violations
-1968594870 2016-8-17 0:00: PW No Violations 1.00
-1984684645 2014-6-6 0:00:0 PL No Violations
-2082404984 2013-10-22 0:00 DD No Violations
-622722026 2013-10-2 0:00: DD No Violations
0622722026 2013-10-02 Drill / Deepen / Reopen No Violations On the day of my inspection I found that the excavating crew was on location preparing to move the drilling rig in. The location was cut and the entrance was graveled. The pits were not started.
1060832029 2014-10-02 Preliminary Restoration No Violations On the day of my inspection I found that the entire site had been graded out and planted. Approximately 60% of the site was growing with well established vegetation. The other 40% had recently been re-planted. Grass was growing on the re-planted section, but it was not enough growth to pass restoration at this time.
1314673696 2013-12-04 Preliminary Restoration No Violations On the day of my inspection I found that the mud pit was closed and the blow pit was solidified. The site was not reclaimed. The well head was shut in and there was no production equipment in place. There were three 500 barrel frac tanks at the site.
1381154655 2013-10-07 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 1 was rigged up on location preparing to spud. The drilling pits were dug and lined and the permit was on display in the doghouse.
1381186230 2013-10-07 Casing String Witnessed No Violations On the day of my inspection I found that Kilbarger Drilling rig 1 drilled a 17 hole to 65 and ran new 11.75 conductor casing to 62. Petroset broke circulation and pumped 100 sacks of class A cement. Good circulation was maintained throughout the job with 6 barrels of cement returns.
1381346100 2013-10-09 Casing String Witnessed No Violations On the day of my inspection I found that Kilbarger Drilling rig 1 drilled an 11 surface hole on air to 798 and ran new 8.625 surface casing to 759. They were circulating the hole with the mud pump upon my arrival. Petroset broke circulation and pumped 270 sacks of class A cement. Good circulation was maintained throughout the job with 11 barrels of cement returns.
1610835078 2013-10-09 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 1 had drilled an 11; surface hole on air to 798. They were in the process of running new 8.625 surface casing. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
1789777297 2013-10-08 Drill / Deepen / Reopen No Violations On the day of my inspection I found that Kilbarger Drilling rig 1 was drilling an 11 surface hole on air. They were at a depth of 206 and reported that they were in hard material which was slowing them down considerably. The permit was on display in the doghouse, there were no sags or tears in the pit liners and there were no leaks or spills.
1926990058 2015-04-07 Preliminary Restoration No Violations On the day of my inspection I found that the portion of the site that still needed erosion control was now planted in agricultural crops. This site passes preliminary restoration.
1967470023 2013-12-30 Preliminary Restoration No Violations On the day of my inspection I found that the well was not equipped for production. No production equipment had been installed and nothing had been done to restore the drill site. The ground was snow covered.
1968594870 2016-08-17 Production Wells No Violations On the day of my inspection I found that the well was being produced with a plunger lift system. The flow lines were connected and the valves were open. I found no leaks or spills around the wellhead. The tank battery consisted of one 100 barrel steel tank, one 50 barrel steel tank and one horizontal separator. An earthen dike was in place around the production equipment. Correct, legible identification was posted and there were no leaks or spills.
1984684645 2014-06-06 Preliminary Restoration No Violations On the day of my inspection I found that the drill site was graded out to the approximate original contour and the pits were closed. The wellhead was equipped with a plunger lift system and the tank battery was in place with dike. The site still needs to be planted for erosion control.
2082404984 2013-10-22 Drill / Deepen / Reopen No Violations On the day of my inspection I found that all of the drilling equipment had been removed from the location. The mud pit was still open and 75% drained. The blow pit was in the process of being solidified and closed. The well head was shut in and there were no leaks or spills.

For data sources see[9]

References