X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-031-26934

Well Details

Well ID: 34-031-26934
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Tuscarawas Township
Operator Name: DIVERSIFIED PRODUCTION LLC
Well Pad ID:
Farm/Lease Name: WILSON R
License Status: Producing
License Date: 2004-03-22
Spud Date: 2004-04-14
Spud Drilling Contractor: PINNACLE DRILLING
Final Drill Date: 2004-04-24
Well Total Depth: 6245.00 ft
Configuration: Vertical
Latitude: 40.290000
Longitude: -81.850000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2004-03-22 Proposed Formations:BEREA THRU COPPER RIDGE, Issued Date:3/22/2004, Expired Date:3/22/2005 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Original Spud 2004-04-14 RBDMS Rec
Completed 2004-04-24 RBDMS Rec
Reached Total Depth 2004-04-24 RBDMS Rec
Completion Report Received 2004-07-13 RBDMS Rec
Construction Permit Expires 2005-03-22 RBDMS Rec
Change of Owner 2018-03-07 Operator changed from 98, NGO DEVELOPMENT CORP. to 8685, M & R INVESTMENTS OHIO LLC
Record Last Modified 2018-03-08 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2004-09-28 3681 3740 60
3681 3740 60
3681 3740 60

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 78000 Gal 50000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2004 NGO DEVELOPMENT CORP. 1961.00 69.00 199
2005 NGO DEVELOPMENT CORP. 3141.00 56.00 365
2006 NGO DEVELOPMENT CORP. 3046.00 0.00 365
2007 NGO DEVELOPMENT CORP. 2541.00 0.00 365
2008 NGO DEVELOPMENT CORP. 2269.00 0.00 365
2009 NGO DEVELOPMENT CORP. 1860.00 0.00 365
2010 NGO DEVELOPMENT CORP. 2415.00 0.00 365
2011 NGO DEVELOPMENT CORP. 2178.00 0.00 365
2012 NGO DEVELOPMENT CORP. 2211.00 0.00 366
2013 NGO DEVELOPMENT CORP. 1779.00 0.00 365
2014 NGO DEVELOPMENT CORP. 1807.00 0.00 365
2015 NGO DEVELOPMENT CORP. 1647.00 0.00 365
2016 NGO DEVELOPMENT CORP. 1547.00 0.00 365
2017 NGO DEVELOPMENT CORP. 1437.00 0.00 365
2018 NGO DEVELOPMENT CORP. 849.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2004 NGO DEVELOPMENT CORP. Brine 1053 199
2005 NGO DEVELOPMENT CORP. Brine 23 365
2006 NGO DEVELOPMENT CORP. Brine 50 365
2007 NGO DEVELOPMENT CORP. Brine 0 365
2008 NGO DEVELOPMENT CORP. Brine 0 365
2009 NGO DEVELOPMENT CORP. Brine 0 365
2010 NGO DEVELOPMENT CORP. Brine 65 365
2011 NGO DEVELOPMENT CORP. Brine 431 365
2012 NGO DEVELOPMENT CORP. Brine 180 366
2013 NGO DEVELOPMENT CORP. Brine 191 365
2014 NGO DEVELOPMENT CORP. Brine 51 365
2015 NGO DEVELOPMENT CORP. Brine 80 365
2016 NGO DEVELOPMENT CORP. Brine 0 365
2017 NGO DEVELOPMENT CORP. Brine 0 365
2018 NGO DEVELOPMENT CORP. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1232619689 2018-1-18 0:00: PW No Violations
-1885050405 2004-8-4 0:00:0 PL No Violations
-271255610 2020-3-2 0:00:0 PW No Violations 0.50
0243179713 2009-12-11 Production Wells No Violations Well capable of production .
0272116417 2005-03-10 Production Wells No Violations Well in production .
0302032505 2010-03-19 Production Wells No Violations Well capable of production .
0344922248 2005-11-09 Production Wells No Violations Well in production .
0723095247 2007-08-28 Production Wells No Violations Well in production , rabbit well . Well shows DR for status should be PR .
0930707476 2015-04-17 Production Wells No Violations On the day of my inspection I found that the wellhead was equipped with a plunger lift system. The valves were open and there was pressure on the gauge. The tank battery consisted of two 100 barrel steel tanks, one separator and an earthen dike. Identification was posted and I found no leaks or spills. The tank battery was fenced with chain link and three-strand barbed wire. The fence was locked.
1081875729 2004-04-13 Drill / Deepen / Reopen No Violations Drilling started . Pinnacle drilling
1082040802 2004-04-15 Drill / Deepen / Reopen No Violations Ran surface casing , Cemented . Universal , Pinnacle on location .
1232619689 2018-01-18 Production Wells No Violations On the day of my inspection I found that the well was equipped with a plunger lift system. The flow lines were connected at the wellhead and t he tubing valve was open. The production equipment consisted of two 100 barrel steel tanks and one horizontal separator in a shallow earthen dike and chain link fence. Correct, legible identification was posted on one of the tanks. The ground was snow covered, but I found no signs of leaking in the snow around the tanks or wellhead.
1323891694 2011-12-14 Production Wells No Violations Well equipped for gas production, two (100) barrel in earthen dike separator
1885050405 2004-08-04 Preliminary Restoration No Violations Restoration passed
2102960834 2012-08-29 Production Wells No Violations On the day of my inspection I found that the well head was equipped with a plunger lift system and connected to a tank battery that consisted of two 100 barrel stock tanks, one separator, an earthen dike and a chain link fence. Proper ID was posted and there were no leaks or spills at the well head or tank battery. No violations at this time.
243179713 2009-12-11 0:00 PW No Violations
272116417 2005-3-10 0:00: PW No Violations
302032505 2010-3-19 0:00: PW No Violations
344922248 2005-11-9 0:00: PW No Violations
723095247 2007-8-28 0:00: PW No Violations
930707476 2015-4-17 0:00: PW No Violations

For data sources see[9]

References