Well Details

Well ID: 34-031-22539
Loading map...
Country: United States
State: Ohio
County: Coshocton
Municipality: Jefferson Township
Operator Name: JONES ALLEN
Well Pad ID:
Farm/Lease Name: JONES EDWIN & ZONA
License Status: Domestic Well
License Date: 1974-12-17
Spud Date: 1975-05-05
Spud Drilling Contractor:
Final Drill Date: 1975-06-07
Well Total Depth: 3439.00 ft
Configuration: Vertical
Latitude: 40.350000
Longitude: -82.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1974-12-17 254 EDCO DRILLING & PRODUCING GeoDate 12/17/74
Original Spud 1975-05-05
Completed 1975-06-07
Reached Total Depth 1975-06-07
CO 1995-06-19 4217 JONES ALLEN GeoDate 12/17/74
Record Last Modified 2009-12-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3340 3350 1
3340 3350 1
3340 3350 1

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1500 Bbl 28000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 EDCO DRILLING & PRODUCING 508.00 396.00 0
1985 EDCO DRILLING & PRODUCING 542.00 372.00 365
1986 EDCO DRILLING & PRODUCING 656.00 293.00 365
1987 EDCO DRILLING & PRODUCING 20.00 390.00 180
1988 EDCO DRILLING & PRODUCING 0.00 231.00 274
1989 EDCO DRILLING & PRODUCING 0.00 80.00 365
1990 EDCO DRILLING & PRODUCING 0.00 341.00 365
1991 EDCO DRILLING & PRODUCING 0.00 294.00 365
1992 EDCO DRILLING & PRODUCING 0.00 238.00 365
1993 EDCO DRILLING & PRODUCING 0.00 216.00 365
1994 EDCO DRILLING & PRODUCING 0.00 153.00 365
1995 EDCO DRILLING & PRODUCING 0.00 55.00 59

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 EDCO DRILLING & PRODUCING Brine 0 0
1985 EDCO DRILLING & PRODUCING Brine 0 365
1986 EDCO DRILLING & PRODUCING Brine 50 365
1987 EDCO DRILLING & PRODUCING Brine 50 180
1988 EDCO DRILLING & PRODUCING Brine 50 274
1989 EDCO DRILLING & PRODUCING Brine 60 365
1990 EDCO DRILLING & PRODUCING Brine 60 365
1991 EDCO DRILLING & PRODUCING Brine 60 365
1992 EDCO DRILLING & PRODUCING Brine 55 365
1993 EDCO DRILLING & PRODUCING Brine 0 365
1994 EDCO DRILLING & PRODUCING Brine 64 365
1995 EDCO DRILLING & PRODUCING Brine 0 59

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1838221384 2018-3-6 0:00:0 PW No Violations 0.80
0643016882 2006-03-21 Production Wells No Violations Well capable of production .Lease and twp. Added
1240107527 2018-06-06 Production Wells No Violations Jim Dunfee called to let me know that he had been out to work on the dike. On the day of my inspection I found that the oily peat and gravel had been removed from the dike. The area behind the dike had also been scraped with a blade. Jim had lime spread over all of the affected area. I did not find any remaining oily material and there were no oil stains showing through the soil. This compliance notice has been resolved. I called Jim to let him know that it looked good.
1503108244 2018-03-16 Production Wells No Violations On the day of my inspection I found that the back side of the dike was built up with fresh soil and most of the oily peat had been removed. I called Jim Dunfee and he said that they were in to find the leak and replace the line. He said that he would get the rest of the peat out in a few days once it has completely absorbed the residual oil.
1527859856 2018-06-01 Production Wells No Violations On the day of my inspection I found that the oil soaked peat had not been removed from the dike. The pools of rain water outside of the dike that were showing some oil sheen had dried up and I did not find any oil on the ground. I called the pumper, Jim Dunfee to ask what his plan was. Jim said that he was contacted by the well owner and he was aware that there is still work to do on the clean up. He said that he has been very busy and asked if I could give him another week to get it taken care of.
1723590118 2018-05-22 Production Wells Violations Noted I originally discovered crude oil in the dike on 3/6/18 and I made contact with the pumper Jim Dunfee where we discussed the clean-up. I returned 10 days later to find that the leak had been repaired and the dike had been built up, but there was still oily soil and peat moss that need to be removed. Jim assured me that he would take care of it and I have not returned until today, 5/22/18. I found that the oil saturated peat moss was still in place across the rear of the dike, around the base of all three tanks. I also found that there was little bit of oily residue leaching through the back of the dike, and there was a slight oil sheen present on the pools of standing rain water. The oil needs to be cleaned off the tanks and the oily buckets need to be removed from the dike. All of the oil saturated soil and peat moss needs to be removed from the dike. These actions shall be completed within 5 days of the issuance of this compliance notice.
1838221384 2018-03-06 Production Wells No Violations I noticed oil in the dike when I was driving by, so I stopped to investigate. I found that there were three 100 barrel steel tanks, one 30 barrel poly tank and one horizontal separator in an earthen dike. Two of the 100 barrel tanks were labeled for permit 6535, The Jones 2-69, owned by Pettigrew Pumping Service. The third tank was labeled for the Jones 1-69 domestic well. There was standing oil spread across the back side of the dike, around all three tanks. Someone had spread peat over the oil, but it was very saturated and there were still several pools of standing crude oil. I did not find that any of the oil had ran over the side of the dike wall or leeched through. The source of the leak appeared to be from the elbow fitting on the riser to the top of the tank for the Jones 1-69. I called Pettigrew to ask about it and the receptionist took my information to pass on to the field staff, with the guarantee that they would contact me and be out to look at it today. I also called Mr. Jones who claimed responsibility for the leak. He said that the fitting froze in the cold weather and split. He said that Jim Dunfee pumps the well for him and he was taking care of the clean up. I called Jim Dunfee, but he didnt answer so I left a voice message. Jim called back and said that it happened two weeks ago, but he didnt think it was a reportable incident. I told him that he needs to get more peat down today. He said that he would be out, and he predicted that he wouldnt be able to repair the line for at least two more days. Matt Pettigrew also called me back and I told him that the leak was not from their equipment. He said that he was aware of it and it had been that way for about three weeks. He also directed me to contact Jim Dunfee.
643016882 2006-3-21 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1723590118 US-OH-117098 2018-06-25 Well operation causing pollution and contamination