Well ID: 34-031-20646 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.22,"lon":-82.13,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Pike Township | |
Operator Name: DUGAN GUY E | |
Well Pad ID: | |
Farm/Lease Name: MCCAUSLAND | |
License Status: Final Restoration | |
License Date: 2012-09-10 | |
Spud Date: 1954-05-01 | |
Spud Drilling Contractor: | |
Final Drill Date: 1954-06-05 | |
Well Total Depth: 3278.00 ft | |
Configuration: Vertical | |
Latitude: 40.220000 | |
Longitude: -82.130000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1954-05-01 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
Completed | 1954-06-05 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
Reached Total Depth | 1954-06-05 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
Completion Report Received | 1955-03-02 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
CO | 1986-08-29 | 649 PRIME TIME ENERGY INVEST |
Change of Owner | 2011-02-23 | Operator changed from 649, PRIME TIME ENERGY INVEST to 882, DUGAN GUY E |
APP | 2012-09-10 | Proposed Formations:CLINTON, Issued Date:9/10/2012, Expired Date:9/10/2014 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Construction Permit Expires | 2014-09-10 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
Plugged/Abandoned | 2014-09-22 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
Record Last Modified | 2016-06-25 | WELL COMPLETION REPORT INDICATES SPUDDED MAY, 1954 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | FRAC; 6500 PETROFRAC; 16,000# SAND |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | PRIME TIME ENERGY INVESTMENT I | 0.00 | 56.00 | 365 |
2007 | PRIME TIME ENERGY INVESTMENT I | 0.00 | 0.00 | 0 |
2008 | PRIME TIME ENERGY INVESTMENT I | 0.00 | 0.00 | 365 |
2009 | PRIME TIME ENERGY INVESTMENT I | 0.00 | 0.00 | 365 |
2011 | DUGAN GUY E | 0.00 | 0.00 | 0 |
2012 | DUGAN GUY E | 0.00 | 0.00 | 0 |
2013 | DUGAN GUY E | 0.00 | 0.00 | 0 |
2014 | DUGAN GUY E | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2001 | PRIME TIME ENERGY INVESTMENT I | Brine | 0 | 365 |
2007 | PRIME TIME ENERGY INVESTMENT I | Brine | 0 | 0 |
2008 | PRIME TIME ENERGY INVESTMENT I | Brine | 0 | 365 |
2009 | PRIME TIME ENERGY INVESTMENT I | Brine | 0 | 365 |
2011 | DUGAN GUY E | Brine | 0 | 0 |
2012 | DUGAN GUY E | Brine | 0 | 0 |
2013 | DUGAN GUY E | Brine | 0 | 0 |
2014 | DUGAN GUY E | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1332694244 | 2015-8-17 0:00: | FR | No Violations | |
-1750128479 | 2015-10-13 0:00 | FR | No Violations | 0.50 |
-1857047686 | 2012-4-23 0:00: | PW | No Violations | 1.00 |
-1933894530 | 2014-9-22 0:00: | PB | No Violations | |
-671078896 | 2014-9-19 0:00: | PB | No Violations | |
0671078896 | 2014-09-19 | Plug / Plug Back | No Violations | On the day of my inspection Randy Moran washed approximately 12 tons of clay down the well before filling it to surface. The clay was slowly receding down the well. They were going to let the well sit open over the weekend to let the clay settle. |
0671646837 | 2016-05-18 | Final Restoration | No Violations | On the day of my inspection I found that the tank battery site and lease road were completely covered in grass. The well site has been seeded twice and it still only has 50% grass coverage. All of the oilfield materials and debris had been removed from the site. I found no signs of erosion at the site or the lease road. I gave Barry Dugan a copy of the landowner waiver and suggested that he contact the landowner to waive the establish vegetative cover on the well site. |
1011248182 | 2014-09-16 | Plug / Plug Back | No Violations | On the day of my inspection Randy Moran got one joint of 7 and one joint of 8.625 casing out of the well. They found that the point where the two casing strings are stuck together is in the second joint of 8.625 casing. When they shut down for the day both strings of casing were secure. |
1332694244 | 2015-08-17 | Final Restoration | No Violations | On the day of my inspection I met Barry Dugan at the well site. I found that he had removed the lead line and the production equipment. There was a pile of 2 steel line that still needed to be taken off site. The access road was completely covered in grass. The well site and tank battery site had been graded out, but they still needed vegetative cover for erosion control. |
1333486257 | 2014-09-15 | Plug / Plug Back | No Violations | On the day of my inspection I found that Randy Moran had washed approximately 7 tons of clay down the 5.5 casing. They ripped the casing at 2150. After they pulled 450 the 7 and 8.625 casing began coming out of the hole with the 5.5 casing. Randy Moran made multiple efforts to get the casing dislodged. They went in to rip the 5.5 casing at 950. The casing parted and fell down hole leaving the top of the 5.5 casing at 1400. They still could not get the 5.5 casing to come free from the 7 casing. They went back in with the ripping tool and parted the 5.5 casing at 861. The 5.5 came free from the 7 casing. They pulled the 5.5 casing. |
1335361608 | 2012-04-23 | Production Wells | Violations Noted | Well is supplied with artificial lift system. There is 10casing and 2tubing visible. Well is capable. No production filed with state. Plug well or show production records. There is no id. |
1466701583 | 2016-06-23 | Final Restoration | No Violations | I received a signed landowner waiver for the final restoration of this well site. At the most recent inspection on 5/18/16 I found that the tank battery site and lease road were completely covered in grass. All of the oilfield materials and debris had been removed from the site. I found no signs of erosion at the site or the lease road. The well site had been seeded twice and it still only had 50% grass coverage. The landowner agrees to waive the establish vegetative cover requirement for the well site. |
1671485301 | 2014-09-18 | Plug / Plug Back | No Violations | On the day of my inspection Randy Moran pulled all 930 of 7 casing from the well. They also recovered two more joints of 5.5 casing that were lodged in the 7. The 8.625 casing was rotted off down hole and they only recovered 130 of it. They were able to get a 7 pre-cast cement plug through the casing to set at 928. |
1750128479 | 2015-10-13 | Final Restoration | No Violations | On the day of my inspection I found that the 2 steel line had been removed. The well site and tank battery site were still bare. I called Barry Dugan. He claimed that he seeded it. I told him that the seed did not take and he needs to re-seed and get some grass growing right away. The access road was covered in short grass and recently mowed. |
1857047686 | 2012-04-23 | Production Wells | No Violations | FOLLOW UP TO NOV # 1335361608 Well is supplied with artificial lift system. There is 10casing and 2tubing visible. Well is capable. No production filed with state. Plug well or show production records. There is no id. |
1933894530 | 2014-09-22 | Plug / Plug Back | No Violations | On the day of my inspection I found that the well was already covered up and the site was rough graded. The work was done over the weekend. Barry Dugan claimed that Randy Moran filled the well to surface and that they cut the casing off and capped it with a steel plate. |
1957588104 | 2014-09-10 | Plug / Plug Back | No Violations | On the day of my inspection I found that Randy Moran was rigged up pulling rods and tubing. Barry Dugan was on location with a load of plugging clay. |
671646837 | 2016-5-18 0:00: | FR | No Violations | 1.00 |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1335361608 | US-OH-109650 | 2012-04-25 | Failure to legibly identify well | |
1335361608 | US-OH-109651 | 2012-04-25 | Well shall be plugged | |
1335361608 | US-OH-109652 | 2012-04-25 | Nonproduction; well shall be plugged or placed in temporary inactive status | |
1335361608 | US-OH-109653 | 2012-04-25 | Statement of annual production not filed |
For data sources see[8]