If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-029-21763 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.83,"lon":-80.76,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Columbiana | |
Municipality: Salem Township | |
Operator Name: HILCORP ENERGY COMPANY | |
Well Pad ID: US-OH-000620 | |
Farm/Lease Name: SALEM-GRUBBS | |
License Status: Plugged Back | |
License Date: 2013-01-02 | |
Spud Date: 2013-01-11 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2013-03-21 | |
Well Total Depth: 8110.00 ft | |
Configuration: Vertical | |
Latitude: 40.830000 | |
Longitude: -80.760000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-01-02 | Proposed Formations:PRE CAMBRIAN, Issued Date:1/2/2013, Expired Date:1/2/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
Reached Total Depth | 2013-03-21 | |
Plugged Back | 2013-10-25 | |
Completion Report Received | 2014-02-11 | |
Record Last Modified | 2014-09-10 | |
Construction Permit Expires | 2015-01-02 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-02-12 | 8465 | 13852 | 0 |
8465 | 13852 | 0 | |
8465 | 13852 | 0 |
For data sources see[3]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | HILCORP ENERGY COMPANY | Brine | 7831 | 179 |
2014 | HILCORP ENERGY COMPANY | Brine | 4359 | 365 |
2015 | HILCORP ENERGY COMPANY | Brine | 2741 | 306 |
2016 | HILCORP ENERGY COMPANY | Brine | 918 | 341 |
2017 | HILCORP ENERGY COMPANY | Brine | 1576 | 365 |
2018 | HILCORP ENERGY COMPANY | Brine | 1392 | 361 |
2019 | HILCORP ENERGY COMPANY | Brine | 320 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1175382423 | 2016-11-9 0:00: | PW | No Violations | 1.70 |
-1265076528 | 2013-3-22 0:00: | DD | No Violations | |
-1630303039 | 2013-1-10 0:00: | DD | No Violations | |
-1978719017 | 2013-2-4 0:00:0 | DD | No Violations | |
-255297600 | 2013-1-9 0:00:0 | DD | No Violations | |
-931886485 | 2013-3-5 0:00:0 | DD | No Violations | |
0255297600 | 2013-01-09 | Drill / Deepen / Reopen | No Violations
-mix cement job done on 01/07/2013 appeared to have stabilized the bore hole. | |
0348181800 | 2013-05-01 | Preliminary Restoration | No Violations | I was at the site to conduct a status check. I found service crews on site. Personnel from Torqued-Up Energy Services were running coiled tubing down hole preparing the well for hydraulic fracturing. |
0578986956 | 2013-02-08 | Drill / Deepen / Reopen | No Violations | |
0652551150 | 2013-01-30 | Drill / Deepen / Reopen | No Violations | I went to the site to check on the move-in of the drilling rig. H&P 225 was moving on location and rigging up. |
0702059803 | 2013-01-07 | Drill / Deepen / Reopen | No Violations
-mix to help stabilize the hole. Once the hole was filled to the surface of the cellar, the rig is going to wait 48 hours before resuming drilling. | |
0931886485 | 2013-03-05 | Drill / Deepen / Reopen | No Violations | I met with drilling consultant Bill Mitchell, and reviewed the proposed production casing and cementing program, and discussed the pertinent regulations. |
1154292464 | 2013-01-04 | Drill / Deepen / Reopen | No Violations | I was on location to meet with Hilcorp Energy Personnell. They are preparing to drill the Cellar and 42 conductor hole for the 30 casing. They will also drill the mouse hole. I, Inspector John Fleming will be covering this for Inspector Rick Anderson the weekend of 1/4/2013 to 1/7/2013. |
1175382423 | 2016-11-09 | Production Wells | No Violations | The purpose for my inspection was to conduct a status check on well # 2-1763-01. Entrance to the well pad is marked by a sign board that contains correct and legible identification for the well on the pad along with required emergency response information. Lease access is over a crushed gravel roadway that remains in good repair. A locked gate is in place to prohibit unauthorized access. Erosion and sedimentation controls along the lease road remain in place and are functioning. The topsoil stockpile is stabilized with well--established vegetation. Correct and legible identification is not present at the well head. The Owner has placed concrete Jersey barriers around the perimeter of the well head to prevent accidental damage. The cellar has been backfilled with crushed gravel and contains a pipe to facilitate draining. The mousehole was cemented. Well # 2-1763-01 is completed with tubing installed inside the 5.5 production casing. Digital gauges indicated 2622 psi on the casing and 274 psi on the tubing. A soap injection unit was also present to facilitate lifting production fluid. No audible or visual leaks were detected. Production equipment on the pad consisted of one (1) gas processing unit (GPU) with sand dump, one (1) glycol dehydrator, one (1) dry dessicant tower and two (2) 360 bbl production tanks and one (1) open burn flare stack. The GPU identified for well # 2-1763-01 remained in good repair and showed no evidence of audible or visual leaks. A sand dump was plumbed in line with the GPU and discharged to an open top tank. The tank contained minimal fluid. The drain valve on the tank did not contain a bull plug. A dry chemical fire extinguisher was present and last inspected in November 2016. The glycol dehydrator was not in operation. A dry |
1246056648 | 2017-02-27 | Production Wells | No Violations | The purpose of my inspection was to document the posting of proper identification at the well head and installation of a plug in the open top box. Correct and legible identification is posted at the well head. A bull plug is installed in the drain valve on the open top box. The tank contained production fluid from the gas processing unit. Freeboard level on the tank was approximately 36. No further action is necessary. |
1265076528 | 2013-03-22 | Drill / Deepen / Reopen | No Violations | |
1362764738 | 2012-12-14 | Surface Facility Construction | No Violations | I went to the site to conduct a pre-construction site inspection. I met with Hugh Gregorcyk of Hilcorp. We walked the site, and reviewed the site construction plans. |
1365710692 | 2013-02-25 | Drill / Deepen / Reopen | No Violations | I went to the site to witness a plug--off plug. The operation included setting three cement plugs; one from the bottom of the hole over the Utica/Point Pleasant, one over the Clinton formation, and the third and topmost plug to set the kick- |
1365774418 | 2013-03-05 | Drill / Deepen / Reopen | No Violations | |
1385558307 | 2013-04-18 | Preliminary Restoration | No Violations | Supervisor Tom Hill, Inspector Kevin Perry and I were on site to conduct a status check. We found a new gate with a padlock at the access road entry. The pad was in good shape. The cellar had plywood sheets for cover. A grate is needed. I will contact the company regarding replacing the sheets with a grate. The well has not been hydraulically fractured. There is no equipment on site, but a single frac tank. |
1429709474 | 2014-11-10 | Production Wells | No Violations
-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. No violations were observed. | |
1569440401 | 2013-04-09 | Drill / Deepen / Reopen | No Violations | I went to the location to review the site following the move out of the drilling rig. All equipment on the drilling pad has been removed except for one frac tank. The secondary containment was still on the pad. Some of the stabilization materials on disturbed areas have been moved by wind and/or rain. The cellar and well head were covered by four sheets of plywood. |
1630303039 | 2013-01-10 | Drill / Deepen / Reopen | No Violations
-mix will be used to fill the remainder of the annulus and to pour the cellar floor. | |
1730155229 | 2013-02-11 | Drill / Deepen / Reopen | No Violations | |
1734830089 | 2013-10-24 | Preliminary Restoration | No Violations | I reviewed the site to assess the completion of preliminary restoration. There is a sign board at the access road entry featuring the well name, and emergency contact information. There is also a copy of the drilling permit posted. The access road has a padlocked gate near Grafton Road. The access road was in good repair, and drainage and erosion controls were in place. Ground cover was well established along the access road. The pad has a soil--lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. The tanks are grounded. There is a truck grounding area for trucks collecting oil and/or produced water. There is also additional production equipment, and all of it is protected from vehicle collision with concrete barriers. There is no site drainage system installed. The soil stockpile is well stabilized with ground cover. The area of disturbance surrounding the pad has good ground cover. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. I will contact the company regarding plugging the mouse hole. Preliminary restoration is complete. |
1910522190 | 2020-3-2 0:00:0 | PL | No Violations | 1.00 |
1978719017 | 2013-02-04 | Drill / Deepen / Reopen | No Violations | I went to the site and had a pre-spud meeting with drilling consultant Jared Phillips. I provided Mr. Phillips with a copy of the Ohio Well Construction Regulations and discussed them with him. He indicated that the rig hoped to spud tomorrow (02/05/2013). |
348181800 | 2013-5-1 0:00:0 | PL | No Violations | |
578986956 | 2013-2-8 0:00:0 | DD | No Violations | |
652551150 | 2013-1-30 0:00: | DD | No Violations | |
702059803 | 2013-1-7 0:00:0 | DD | No Violations |
For data sources see[6]