34-029-21750

Well Details

Well ID: 34-029-21750
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000443
Farm/Lease Name: ROY D 31-15-3
License Status: Producing
License Date: 2012-09-27
Spud Date: 2012-12-05
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2012-12-24
Well Total Depth: 12664.00 ft
Configuration: Horizontal
Latitude: 40.820000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-27 Proposed Formations:POINT PLEASANT, Issued Date:9/27/2012, Expired Date:9/27/2014 12:00:00 PM, Drilling unit acres:153.2, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-10-05 CORRECTION TO X,Y COORDINATES (SURFACE & TARGET).
Reached Total Depth 2012-12-24
Correction to Well 2013-03-22 CORRECTION TO SURFACE FOOTAGE & TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGE TO 119.46 ACRES.
Correction to Well 2013-06-21 UNIT SIZE CHANGED TO 119.42 ACRES.
Completion Report Received 2014-06-05
Construction Permit Expires 2014-09-27
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/30/2013 05/03/2013 7862 3,691,840.0 294257

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.34645 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 73.5003 0
PTLFR200 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Aliphatic Hydrocarbon TRADE SECRET 30 0.01317 0
Proprietary Oxyalkylated Alcohol TRADE SECRET 5 0.00219 0
PTLIS352 PERFORMANCE TECHNOLOGIES Iron Control Agent Citric Acid 000077-92-9 100 0.00057 0
PTLBW102 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.001 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 10.6632 0
PTLSI372 PERFORMANCE TECHNOLOGIES Scale Inhibitor No Hazardous Components NONE 0 0 0
PTLBW112 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00709 0
EC6111A NALCO Anti-Bacterial Agent Glutaraldehyde (Pentanediol) 000111-30-8 30 0.01233 0
Water 007732-18-5 0 0.04325 0
PTLCA102 PERFORMANCE TECHNOLOGIES Cross Linker Proprietary Inorganic Salt TRADE SECRET 30 0.00441 0
Proprietary Alkyl Alcohol TRADE SECRET 60 0.00883 0
Sodium Hydroxide 001310-73-2 60 0.00883 0
PTLAI171, PTLBW112, PTLFR200, PTLGL140, PTLSI372 PERFORMANCE TECHNOLOGIES Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Scale Inhibitor Proprietary Substituted Fatty Acid Ester TRADE SECRET 0 0.04567 0
Proprietary Methanol TRADE SECRET 0 0.00077 0
Proprietary Clay TRADE SECRET 0 0.13961 0
Proprietary Alkylene Oxide Block Polymer TRADE SECRET 0 0.00077 0
Guar Gum 009000-30-0 0 0.13961 0
2-Ethylhexanol 000104-76-7 0 0.00077 0
Proprietary Surfactant TRADE SECRET 0 0.13961 0
Sodium Chloride 007647-14-5 0 0.04567 0
Copper Sulfate 007758-98-7 0 0.00051 0
Proprietary Oxyalkylated Fatty Acid Derivative TRADE SECRET 0 0.04567 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 0 0.04567 0
Proprietary Aliphatic Alcohol TRADE SECRET 0 0.04567 0
Diethylene Glycol 000111-46-6 0 0.00077 0
Proprietary Polycarboxylic Acid Polymer TRADE SECRET 0 0.01854 0
Proprietary Vinyl Copolymer TRADE SECRET 0 0.04899 0
Petroleum Distillate Hydrotreated Light 064742-47-8 0 0.13961 0
Water 007732-18-5 0 0.06498 0
PTLMP136 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 85 0.94953 0
Hydrochloric Acid 007647-01-0 15 0.16756 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.1275 0
PTLAI171 PERFORMANCE TECHNOLOGIES Corrosion Inhibitor Ethylene Glycol 000107-21-1 30 0.00056 0
Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00056 0
Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00019 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00112 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
Dimethyl Formamide 000068-12-2 10 0.00019 0
PTLGL140 PERFORMANCE TECHNOLOGIES Gelling Agent No Hazardous Components NONE 0 0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-05-02 H2O 15 5929 Bbl 386140 Performance Technologies STAGE 13

36 SHOTS

2013-05-01 H2O 15 6885 Bbl 381120 Performance Technologies STAGE 5

36 SHOTS

2013-04-30 H2O 15 6408 Bbl 379740 Performance Technologies STAGE 1

36 SHOTS

2013-05-02 H2O 15 6046 Bbl 386560 Performance Technologies STAGE 12

36 SHOTS

2014-05-02 H2O 15 5903 Bbl 387380 Performance Technologies STAGE 9

36 SHOTS

2013-05-03 H2O 15 5862 Bbl 386150 Performance Technologies STAGE 14

36 SHOTS

2013-05-01 H2O 15 6248 Bbl 384736 Performance Technologies STAGE 7

36 SHOTS

2013-05-02 H2O 15 6192 Bbl 380340 Performance Technologies STAGE 10

36 SHOTS

2013-05-01 H2O 15 5680 Bbl 382640 Performance Technologies STAGE 4

36 SHOTS

2013-05-02 H2O 15 6862 Bbl 379740 Performance Technologies STAGE 8

36 SHOTS

2013-04-30 H2O 15 6248 Bbl 382580 Performance Technologies STAGE 3

36 SHOTS

2013-05-01 H2O 15 5606 Bbl 381940 Performance Technologies STAGE 6

36 SHOTS

2013-04-30 H2O 15 6239 Bbl 379120 Performance Technologies STAGE 2

36 SHOTS

2013-05-02 H2O 15 6397 Bbl 386560 Performance Technologies STAGE 11

36 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 718551 7557 294
2015 CHESAPEAKE EXPLORATION LLC 551631 3818 363
2016 CHESAPEAKE EXPLORATION LLC 388864 1832 365
2017 CHESAPEAKE EXPLORATION LLC 310149 1125 365
2018 CHESAPEAKE EXPLORATION LLC 257991 547 364
2019 CHESAPEAKE EXPLORATION LLC 56831 268 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 6047 294
2015 CHESAPEAKE EXPLORATION LLC Brine 2884 363
2016 CHESAPEAKE EXPLORATION LLC Brine 1830 365
2017 CHESAPEAKE EXPLORATION LLC Brine 1327 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1143 364
2019 CHESAPEAKE EXPLORATION LLC Brine 799 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1177930132 2012-9-13 0:00: SC No Violations
-1601422631 2012-12-4 0:00: DD No Violations
-1887554950 2012-10-15 0:00 DD No Violations
-1889816396 2013-7-2 0:00:0 PL No Violations
-441305200 2013-4-9 0:00:0 DD No Violations
-562621678 2012-12-12 0:00 DD No Violations
-730818307 2012-10-14 0:00 DD No Violations
-768729594 2014-5-19 0:00: PL No Violations 2.00
-920189640 2012-10-24 0:00 DD No Violations
-947722342 2016-3-2 0:00:0 PW No Violations 0.50
0009471531 2012-12-26 Drill / Deepen / Reopen No Violations

-Tex Pumping LLC was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement job was done in stages. Following two spacers designed to recover the oil-based mud used to drill the hole and condition the hole, respectively, the tail cement slurry was pumped. O-Tex pumped 443 bbls of tail cement at 15.3 pounds per gallon (ppg). The plug was dropped, and displaced with 279 bbls of water. The plug bumped the float collar at 11:37pm on 12/26/2012. Pressure held. The float held when the pressure was released, and 3.0 bbls of water bled back.

0312237210 2012-10-15 Drill / Deepen / Reopen No Violations I was on site for the cementing of the conductor for this well location with Rick Anderson. I witnessed cement come back to surface. The pad is in good condition and there are no violations at this time.
0441305200 2013-04-09 Drill / Deepen / Reopen No Violations I went to the site for a status check and found that the site was being prepared for well stimulation. A number of frac tanks were present on site, and a water pumping set-up was present on Depot Road where it intersects Cold Run Creek. A crew was installing a security camera. No one else was present.
0562621678 2012-12-12 Drill / Deepen / Reopen No Violations

-Tex Pumping LLC was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.5 pounds per gallon (ppg), and adjusted to 15.6 ppg. O-Tex pumped 146 bbls of cement slurry at 15.6 ppg. Cement returns to the surface were observed. An estimated 13 bbls of cement returned to the surface. Cement returns were mudscaled at 13.0 ppg. The plug was displaced with 133 bbls of water. During the plug displacement, the plug did not bump the float collar when the calculated displacement plus half the volume of the shoe track was reached, so pumping was discontinued. The displacement was completed at 11:36am on 12/12/2012. The float held when the pressure was released and 0.5 bbls of water bled back.

0599667445 2012-12-08 Drill / Deepen / Reopen No Violations I was at the site to witness the top--Tex Pumping LLC was the cementing contractor. O-Tex mixed and mudscaled the cement, and pumped 57 bbls of cement slurry at 15.6 pounds per gallon (ppg). Cement returns to the surface were observed. Approximately 3 bbls of cement returned to the surface. Following a 2.5 hour wait, the cement top had fallen approximately 29.5 feet. O-Tex pumped an additional 6 bbls of cement to bring the cement back to the surface. The job was complete at 1:05pm on 12/08/2012.
0730818307 2012-10-14 Drill / Deepen / Reopen No Violations
0768729594 2014-05-19 Preliminary Restoration No Violations

-lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. There is also two compressors on this pad that is used for vapor recover from the production tanks. Along the interior of the chain link fence there is a site drain installed. Outlets are located at the east and west sides of the pad. Inside the fence, there is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and approved.

0920189640 2012-10-24 Drill / Deepen / Reopen No Violations While enroute to other inspections, I stopped at the site to collect GPS data for the wellhead and access road.
0947722342 2016-03-02 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #8H well is in production. The well is equipped with a plunger lift assembly. There is a steel dike around the tank battery.

The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Vertical separator 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked

1177930132 2012-09-13 Surface Facility Construction No Violations I went to the site to review the construction process of the drilling pad. The pad was excavated, and the berms up. Preliminary soil stabilization has been completed. No stone in place at this time. There is a gate at the access road, but no fence around the pad yet.
1293463694 2017-02-09 Production Wells No Violations The purpose for my inspection was to conduct a status check on well #2-1750-00-00. RBDMS indicates the operator is current with reporting production. The lease entrance is marked with a sign board containing signs reporting required well identification and emergency response information. At the time of my inspection, the local area had received a coating of snow that partially covered the location. The lease road was drivable. No signs of erosion were observed adjacent to the road traveling back to the pad. The soil stockpile remains stable with well-
1365613966 2012-08-07 Surface Facility Construction No Violations I went to the site and conducted a pre-construction site inspection with Brett Bell, Chesapeake Field Representative.
1365617476 2012-12-07 Drill / Deepen / Reopen No Violations

-Tex Pumping LLC was the cementing contractor. There was intermittent circulation during the cementing operation. O-Tex pumped 25 bbls of gel with Bero-sel ahead of the cement. The cement was mudscaled and pumped at 15.6 pounds per gallon (ppg). O-Tex pumped 177 bbls of cement slurry at 15.6 ppg. Circulation was restored when 45 bbls of the cement had been pumped. Circulation was lost again when 80 bbls of the cement had been pumped. Circulation returned when 156 bbls of cement had been pumped. Circulation continued until about 90 bbls into the displacement, when it stopped for the duration of the job. No cement returns to surface were observed. The plug was displaced with 101 bbls of water. The plug bumped the float collar at 5:52pm. O-Tex pressured up on the casing, and the pressure held. When the pressure was released, approximately 1.0 bbl of water flowed back. Since circulation was lost and there were no cement returns to surface, a bond log will be run to determine the depth of the top of the cement.

1460173683 2012-10-17 Drill / Deepen / Reopen No Violations I went to the site to check the status of the cellar floor. Jimmy Freeman of Chesapeake indicated that it would be completed with redi-mix the next day.
1601422631 2012-12-04 Drill / Deepen / Reopen No Violations I went to the site and had a pre-spud meeting with drilling consultants Mike Kirkpatrick and Gene Belsom. Nomac 310 hopes to commence drilling on 12/05/2012.
1857483223 2016-04-05 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the

access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #8H well is in production. The well is equipped with a Christmas tree valve assembly. There is a steel dike around the tank battery. The equipment on the pad consists of the following: 6 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked

1887554950 2012-10-15 Drill / Deepen / Reopen No Violations I witnessed the cementing of the conductor casing. Express Energy Services drilled a 26 diameter hole to 120. Express installed 120 of 20 OD casing. During drilling, water was encountered at an approximate depth of between 55 and 60. Allied Cementing Co., LLC was the cementing contractor. The cement was mudscaled at 16.2 pounds per gallon (ppg), and adjusted to 15.6 ppg. Allied pumped 47 bbls of cement slurry at 15.6 ppg. The cement was displaced with 40 bbls of water. Cement returns to surface were observed. An estimated 10 bbls of cement returned to surface. Displacement was completed at 8:47pm.
1889816396 2013-07-02 Preliminary Restoration No Violations

-established ground cover. The soil stockpile is well stabilized with vegetation. Crops and/or woodlands are growing normally outside the fenced area and berm. The area of disturbance has good ground cover. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The well has a frac valve in place, but there is no production equipment at the site. The cellar is full water to the top. Preliminary restoration approval will not be finalized pending installation of production equipment.

2066086276 2020-1-10 0:00: PW No Violations 1.00
312237210 2012-10-15 0:00 DD No Violations 2.50
599667445 2012-12-8 0:00: DD No Violations
9471531 2012-12-26 0:00 DD No Violations

For data sources see[9]