Well Details

Well ID: 34-029-21747
Loading map...
Country: United States
State: Ohio
County: Columbiana
Municipality: Salem Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000353
Farm/Lease Name: WEAVER 23-15-3
License Status: Producing
License Date: 2012-10-15
Spud Date: 2012-11-28
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2012-12-16
Well Total Depth: 11789.00 ft
Configuration: Horizontal
Latitude: 40.850000
Longitude: -80.770000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-09-04 Proposed Formations:POINT PLEASANT, Issued Date:9/4/2012, Expired Date:9/4/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-10-15 Proposed Formations:POINT PLEASANT, Issued Date:10/15/2012, Expired Date:10/15/2014 12:00:00 PM, Drilling unit acres:106.69, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-12-16
Correction to Well 2013-03-15 CHANGE IN TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 99.99 ACRES.
Completion Report Received 2014-08-29
Construction Permit Expires 2014-10-15
Record Last Modified 2019-06-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-29 8157 11640 360
8157 11640 360
8157 11640 360

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/18/2013 02/21/2013 7872 3,434,300.0 280205

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 MC B-8642 (WS) MULTI-CHEM Anti-Bacterial Agent Ethanol 000064-17-5 1 0.00021 0
Quaternary Ammonium Compound 068424-85-1 10 0.00212 0
Glutaraldehyde (Pentanediol) 000111-30-8 60 0.0127 0
10.1 - 15 HCL FTS INTERNATIONAL Acid Hydrochloric Acid 007647-01-0 15 0.11671 0
Water 007732-18-5 85 0.66137 0
APB01 (AMMONIUM PERSUFATE BREAKER) FTS INTERNATIONAL Breaker Ammonium Persulfate 007727-54-0 100 0.00095 0
APB01 (AMMONIUM PERSUFATE BREAKER),

B10 (HIGH PH BUFFER), BXL02 Borate XL, CI-150, FE 200, FRW-200, LTB-01

FTS INTERNATIONAL Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Iron Control Agent, pH Adjusting Agent Proprietary Iron Control Additive (FE-200L) TRADE SECRET 0 0.00348 0
Proprietary Friction Reducer Additive

(FRW-200 and FRW-200W)

TRADE SECRET 0 0.02311 0
Water 007732-18-5 0 0.04935 0
Proprietary Breaker (APB01) Additive TRADE SECRET 0 0.00006000 0
Proprietary Corrosion Inhibitor Additive (CI-150) TRADE SECRET 0 0.0007 0
Proprietary Breaker Additive (LTB-1) TRADE SECRET 0 0.02712 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 70.6852 0
FE 200 FTS INTERNATIONAL Iron Control Agent Trisodium Nitrilotriacetate 005064-31-3 2 0.0001 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 41 0.00196 0
Sodium Hydroxide 001310-73-2 2 0.00009000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 12.9394 0
B10 (HIGH PH BUFFER) FTS INTERNATIONAL pH Adjusting Agent Potassium Hydroxide 001310-58-3 20 0.0024 0
Potassium Carbonate 000584-08-7 48 0.00577 0
LTB-01 FTS INTERNATIONAL Breaker Proprietary Cured Acrylic Resin TRADE SECRET 25 0.02296 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 25 0.02296 0
Ammonium Persulfate 007727-54-0 100 0.09186 0
CI-150 FTS INTERNATIONAL Corrosion Inhibitor Dimethyl Formamide 000068-12-2 10 0.00013 0
Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00013 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00079 0
Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00039 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00013 0
Northern White Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 13.8316 0
BXL02 Borate XL FTS INTERNATIONAL Cross Linker Sodium Metaborate Tetrahydrate 010555-76-7 25 0.00876 0
Boric Acid 010043-35-3 15 0.00526 0
Potassium Hydroxide 001310-58-3 12 0.0042 0
NaturaLine MX 588-2 MULTI-CHEM Scale Inhibitor No Hazardous Components NONE 0 0 0
FRW-200 FTS INTERNATIONAL Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 26 0.00618 0
100 Mesh Sand FTS INTERNATIONAL Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.47801 0
MC B-8642 (WS), NaturaLine MX 588-2 MULTI-CHEM Anti-Bacterial Agent, Scale Inhibitor Water 007732-18-5 0 0.01768 0
Proprietary Neutralized Polymer TRADE SECRET 0 0.00115 0
Methanol (Methyl Alcohol) 000067-56-1 0 0.00012 0
Proprietary Solvent (NaturaLine MX 588-2) TRADE SECRET 0 0.00576 0
HVG01 (TURQUOISE-1 BULK) FTS INTERNATIONAL Gelling Agent Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 2 0.00174 0
Guar Gum 009000-30-0 50 0.04353 0
Surfactant 068439-51-0 2 0.00174 0
Petroleum Distillate Hydrotreated Light 064742-47-8 55 0.04788 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-12-18 H2O 15 9045 Bbl 531712 Frac Tech Services STAGE 1/10

36 SHOTS STAGES 2-9 SEE IMAGES

2013-12-21 H2O 15 7586 Bbl 536659 Frac Tech Services STAGE 10/10

40 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 208197 1228 161
2015 CHESAPEAKE EXPLORATION LLC 213577 653 359
2016 CHESAPEAKE EXPLORATION LLC 151022 293 366
2017 CHESAPEAKE EXPLORATION LLC 110928 200 364
2018 CHESAPEAKE EXPLORATION LLC 102238 208 365
2019 CHESAPEAKE EXPLORATION LLC 21976 45 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 6886 161
2015 CHESAPEAKE EXPLORATION LLC Brine 4225 359
2016 CHESAPEAKE EXPLORATION LLC Brine 2898 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1614 364
2018 CHESAPEAKE EXPLORATION LLC Brine 1343 365
2019 CHESAPEAKE EXPLORATION LLC Brine 513 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1047966053 2014-5-20 0:00: PL No Violations 2.00
-1150597566 2014-12-5 0:00: PL No Violations
-1389608687 2012-9-17 0:00: DD No Violations
-1522875300 2012-11-26 0:00 DD No Violations
-1778090160 2012-9-13 0:00: DD No Violations
-454151769 2012-11-23 0:00 DD No Violations
-490414246 2012-12-12 0:00 DD No Violations
-495143426 2012-9-18 0:00: DD No Violations
0156755293 2012-12-04 Drill / Deepen / Reopen No Violations
0454151769 2012-11-23 Drill / Deepen / Reopen No Violations I went to the site as drilling rig Nomac 245 was moving in. Mat boards were down, and truckloads of equipment were arriving. The rig itself was not yet on site.
0490414246 2012-12-12 Drill / Deepen / Reopen No Violations
0495143426 2012-09-18 Drill / Deepen / Reopen No Violations Jimmy Freeman of Chesapeake checked the depth of the top of the cement from the conductor cement job done yesterday (09/17/2012). The top of the cement was tagged at 13 below the floor of the cellar. Allied Cementing Service returned to the site, and ran 1 pipe to a depth of 6 below the cellar floor in the annulus between the 30 casing and the 26 casing. Ten bbls of cement slurry at 15.9 lbs per gallon were pumped through the 1 pipe. Cement was circulated to the surface of the cellar, and provided a 1.5 thick cellar floor. The top out job was complete at 12:58pm.
0582954029 2012-11-27 Drill / Deepen / Reopen No Violations I met with Clay Chauviere, a drilling consultant, and Tim Cantrell, a drilling superintendent, for Nomac 245 and Chesapeake Exploration, and had a pre-spud meeting. We discussed the requirements regarding the drilling and installation of a possible mine string at the site.
0866897996 2012-12-01 Drill / Deepen / Reopen No Violations I went to the site to witness the cementing of the surface casing. The 17.50 diameter surface hole was drilled to 630. There were no issues while drilling the surface hole. The 13.375 OD surface casing was set at 630 KB. A total of six centralizers were installed on the surface casing string. Schlumberger was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.6 lbs per gallon (ppg). Schlumberger pumped 220 bbls of cement slurry at 15.6 ppg. Cement returns to surface were observed, and were mudscaled at 15.6ppg. An estimated 80 bbls of cement returned to surface. The plug was displaced with 84 bbls of water. The plug bumped the float collar at 4:29pm. Schlumberger pressured up on the casing, and the pressure held. When the pressure was released, approximately 0.6 bbls of water flowed back.
1047966053 2014-05-20 Preliminary Restoration No Violations

-established ground cover. The soil stockpile is well stabilized with vegetation. Crops and/or woodlands are growing normally outside the fenced area and berm. The area of disturbance has good ground cover. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The well has a frac valve in place, but there is no production equipment at the site. The cellar is full water to the top. Preliminary restoration approval will not be finalized pending installation of production equipment and re-inspection.

1150597566 2014-12-05 Preliminary Restoration No Violations

--lined and sealed secondary containment. There are concrete barriers protecting the containment from vehicles. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. There is an earthen berm, with well-established ground cover. The soil stockpile is well stabilized with vegetation. Crops, woodlands and/or underbrush are growing normally outside the area of disturbance. Drainage and erosion controls outside the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration is complete and has passed inspectio

1359643883 2012-08-27 Surface Facility Construction No Violations I went to the site to review the construction process of the drilling pad. Construction was complete. I noted that the soil stockpile has been stabilized.
1359750252 2012-11-28 pw No Violations I was at the site to check on the drilling progress on the drilling of the mine string hole. Nomac 245 was drilling slowly at 174. If a mine void is to be encountered, it is estimated to be at approximately 228 KB.
1360089943 2012-11-29 Drill / Deepen / Reopen No Violations

-Tex Pumping LLC was the cementing contractor. There was good fluid circulation throughout the cementing operation. The cement was mudscaled at 15.8lbs per gallon (ppg). O-Tex adjusted the cement density, and pumped 94 bbls of cement slurry at 15.6 ppg. Cement returns to surface were observed, and were mudscaled at 14.5 ppg. An estimated 20 bbls of cement returned to surface. The cement was displaced with 94 bbls of water. Displacement was completed at 2:24pm. Approximately 30 of cement was left inside the casing. The swage on the top of the casing was shut in.

1389608687 2012-09-17 Drill / Deepen / Reopen No Violations I witnessed the cementing of the conductor casing. United Drilling drilled a 30 diameter hole and installed 30 OD diameter casing into hard rock at 42, leaving no annulus. United then drilled a 28 diameter hole to 120. United then installed 120 of 26 OD casing. During drilling, water was encountered at an approximate depth of 50. Allied Cementing Company was the cementing contractor. The cement was mudscaled at 15.2 pounds per gallon (ppg). Allied adjusted the density, and pumped 34.0 bbls of cement slurry at 15.6 ppg. The cement was displaced with 71.9 bbls of water. Cement returned to surface at the end of displacment. Displacement was completed at 1:28pm. The cement fell about 2 in one hour. United will let the cement set for approximately 8 hours, and then tag the top to see if additional cement will be needed to bring the top to the surface of the cellar.
1406576588 2014-05-20 Production Wells No Violations I reviewed the site to assess the completion of preliminary restoration. There is a sign board at the access road entry featuring the well name, permit number and emergency contact information. The access road is in good repair. Drainage and erosion controls were in place and appear to be functioning. Ground cover was well established along the access road. I found the drilling/production pad to be enclosed entirely with a chain link fence with barbed wire at the top, and with a padlocked gate. The pad has a crushed limestone surface, and is in good repair. There is some standing water along some of the pad edges. I walked the exterior perimeter and noted that the berm is in good repair and ground cover is well established. The area of disturbance around the pad has good ground cover. Crops are growing well outside the area of disturbance. The soil stockpile is well stabilized with vegetation. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The well has been hydraulically fractured, and has a Christmas tree valve assembly. The well is not connected to the GPU units at this time. The tank battery consist of two 400 barrel tanks. There are bull gates and concrete barriers surrounding the wellhead and cellar to prevent vehicle impacts. There are grates over the cellar to prevent falls. There is no ID tag on the well, but it is the only one on the site. The cellar is full of water to the top. The mouse hole has not been plugged, but has a steel plate welded on top. Preliminary restoration approval will not be granted pending installation of pipeline connecting the well to the GPU units. The area is also used as storage for some pipeline equipment.
1482529032 2016-11-09 Production Wells No Violations The purpose of my inspection was to conduct a status check on well # 2--established vegetation. A sign board is posted at the entrance and contains correct owner and well identification and emergency response information. A chain link security fence with barbed wire top is constructed around the well pad. The entrance gate and escape doors are locked to prevent unauthorized entry. An electric shut down button is present outside of the entrance gate. An earthen berm perimeter with well-established vegetation is present around the fence/ well pad. The well pad surface is composed of crushed gravel and remains in good repair. A French drain has been installed with stand pipe drains on the North and East sides of the pad. Both stand pipe valves were closed.

Correct and legible identification is posted at the well head. The well cellar contains freshwater with 6 inches of freeboard. No sheen was identified on the surface. Steel grating is set in place on top of the cellar to prevent falls. The mousehole is cemented. Annular casing pressure gauges on the intermediate and production casing indicated 0 psi. Neither gauge is identified as to its respective casing string; water levels prevent accurate determination. The well is equipped with a plunger lift assembly. The production casing pressure gauge indicated 270 psi. The production tubing pressure gauge indicated 140 psi. No audible or visual leaks were detected. Production equipment located on the pad consists of one (1) vertical sand/fluid separator, one (1) gas processing unit (GPU), one (1) 350 gallon hydrate inhibitor tank within sealed containment, one (1) thermal-electric generator, two (2) 400 bbl production tanks within containment and one (1) emission combustion tower. Concrete jerse

1522875300 2012-11-26 Drill / Deepen / Reopen No Violations I went to the site to check on the rigging up process and arrange for a pre-spud meeting. I spoke with Greg Stutzman, the tool pusher, and Kevin Cartwright, a mud engineer. They contacted the drilling consultant, Clay Chauviere, and arrangements were made for a pre-spud meeting tomorrow, 11/27/2012.
156755293 2012-12-4 0:00: DD No Violations
1589376188 2020-5-12 0:00: PW No Violations 1.00
1778090160 2012-09-13 Drill / Deepen / Reopen No Violations I was at the site checking the drilling progress. United Drilling was onsite drilling the hole for the conductor pipe. The cellar had been dug, and United had installed 30 OD casing to 37. It was installed so there was no annulus. Drilling was completed for the day. Uniteds next step is to drill a 28 diameter hole to 120, and install 26 OD casing to total depth.
1929942342 2016-03-02 Production Wells No Violations I was on location for a status check. My inspection found the access road gate locked and the access road is in good repair. An identification sign at the access road entrance, well, and tank battery. The pad is fenced and all man doors are locked. The #3H well is in production. The well is equipped with a plunger lift assembly. There is a steel dike around the tank battery.

The equipment on the pad consists of the following: 2 - Storage tanks 400 bbl 1 - Vapor recovery unit (VRU) 1 - Gas processing unit (GPU) 1 - Sand separator 1 - Thermal electric generator 1 - Producing well Site fenced and man doors locked

582954029 2012-11-27 0:00 DD No Violations
866897996 2012-12-1 0:00: DD No Violations

For data sources see[10]