If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22604 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.49,"lon":-81.02,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-001372 | |
Farm/Lease Name: KENNEDY 14-13-5 | |
License Status: Producing | |
License Date: 2014-06-25 | |
Spud Date: 2014-07-20 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2014-08-20 | |
Well Total Depth: 16167.00 ft | |
Configuration: Horizontal | |
Latitude: 40.490000 | |
Longitude: -81.020000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-06-18 | Proposed Formations:TRENTON-BLACK RIVER, Issued Date:6/18/2014, Expired Date:6/17/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-06-25 | Proposed Formations:POINT PLEASANT, Issued Date:6/25/2014, Expired Date:6/24/2016 12:00:00 PM, Drilling unit acres:602.54, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2014-08-20 | |
Correction to Well | 2015-02-06 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Correction to Well | 2015-07-31 | UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Completion Report Received | 2015-08-26 | |
Construction Permit Expires | 2016-06-24 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-08-26 | 8464 | 15955 | 0 |
8464 | 15955 | 0 | |
8464 | 15955 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/08/2015 | 03/20/2015 | 8049 | 10,361,100.0 | 831941 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 83.3625 | 0 |
A264, B244, B317, J218, J475, J580,
J609, J610, L058, Acid, Hydrochloric 15pct, Acid, Hydrochloric 7.5pct, Northern White Sand, 100 Mesh Sand |
SCHLUMBERGER | Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural | Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen
phosphate), sodium salt |
68171-29-9 | 0.01 | 0.00161 | 0 | |
Siloxanes and silicones, dimethyl,
reaction products with silica |
67762-90-7 | 0 | 0 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Urea | 57-13-6 | 0 | 0.00036 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic
acid sodium salt and methyl acrylate |
136793-29-8 | 0 | 0.00059 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Hydrochloric acid | 7647-01-0 | 0.27 | 0.04586 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00015 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.02 | 0.00253 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00009000 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00001000 | 0 | ||||
1-Octadecene (C18) | 112-88-9 | 0 | 0 | 0 | ||||
Potassium borate | 1332-77-0 | 0.13 | 0.02257 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic
acid, sodium salt polymer |
38193-60-1 | 0.03 | 0.00551 | 0 | ||||
Formaldehyde | 50-00-0 | 0 | 0 | 0 | ||||
Copper(II) sulfate | 7758-98-7 | 0 | 0 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00747 | 0 | ||||
Propargyl alcohol | 107-19-7 | 0 | 0.00003000 | 0 | ||||
Non-crystalline silica (impurity) | 7631-86-9 | 0 | 0.00029 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00001000 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0 | 0.00071 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0 | 0.00023 | 0 | ||||
2-propenamid | 79-06-1 | 0 | 0.00002000 | 0 | ||||
Ethylene Glycol | 107-21-1 | 0 | 0.0002 | 0 | ||||
Quartz, Crystalline silica | 14808-60-7 | 98.89 | 16.6298 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00534 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0.00001000 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00049 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00011 | 0 | ||||
Hexadec-1-ene | 629-73-2 | 0 | 0.00001000 | 0 | ||||
Guar gum | 9000-30-0 | 0.51 | 0.08622 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.05 | 0.00834 | 0 | ||||
Glycerol | 56-81-5 | 0.04 | 0.00736 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00004000 | 0 | ||||
Sodium sulfate | 7757-82-6 | 0 | 0.00008000 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2015-03-20 | H2O | 15 | 1931 Bbl | 331340 | Schlumberger | STAGE 50/50
25 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | 606174 | 33547 | 178 |
2016 | CHESAPEAKE EXPLORATION LLC | 899421 | 23912 | 364 |
2017 | CHESAPEAKE EXPLORATION LLC | 500038 | 8862 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 362307 | 5190 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 77075 | 998 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 24604 | 178 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 18596 | 364 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 9410 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 5870 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 1173 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1029166381 | 2015-10-8 0:00: | PL | No Violations | |
-1482329809 | 2014-8-13 0:00: | DD | No Violations | 1.00 |
-95389863 | 2014-8-10 0:00: | CS | No Violations | 6.50 |
0003291819 | 2016-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was in good repair, but was unlocked at the time of inspection. The #1H well is in production. The well is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and equipped with locks on the man door. The man door was open at the time of inspection, but Chesapeake personnel were on site. The equipment on the pad consists of the following:
9 - 400 bbl production tanks, three labelled as containing produced water, six labelled as containing condensate. 1- Low-pressure vertical separator located inside of the dike of the tank battery. 7 Producing wells 7 Sand separators 7 Gas Processing Units 5 Line Heaters 1 Heat Treater 1 Vapor Recovery Unit 2 Bullet Tanks |
0095389863 | 2014-08-10 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 9.625 surface casing. Nomac #73 drilled a 12.25 hole to a depth of 2,010 and Wyoming Casing set the pipe at a depth of 1,999. O-Tex Pumping cemented the casing with 710 sacks of Class H cement weighing 15.8lbs/gal on the pressurized scales. 25 barrels of cement slurry circulated to surface. See cement report for more details on this job. No violations. |
0615154616 | 2014-08-08 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 13.375 surface casing. Nomac #73 drilled a 17.5 hole to a depth of 860 and Wyoming Casing set the pipe at a depth of 850. O-Tex Pumping cemented the casing with 770 sacks of Class H cement weighing 15.6lbs/gal on the pressurized scales. 45 barrels of cement slurry circulated to surface. See cement report for more details on this job. No violations. |
0657967386 | 2014-07-28 | Drill / Deepen / Reopen | No Violations | I was on location to inspect the status of the well pad following the cementing of conductor casing last week. Contractors were on site grading and compacting the location in preparation of Nomac Rig #73 moving in. No violations. |
1029166381 | 2015-10-08 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of nine, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed. |
1407433245 | 2014-07-21 | Casing String Witnessed | No Violations
-Tex was the cementing contractor. O- | |
1482329809 | 2014-08-13 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Nomac Rig #73. They drilled the 8.75 section to the mud-up-point of 7,634. They are currently drilling the 8.5 curve at a depth of 7,712 with synthetic, oil based mud. The location is in good condition and all equipment is on containment. No violations. |
3291819 | 2016-3-1 0:00:0 | PW | No Violations | 1.00 |
615154616 | 2014-8-8 0:00:0 | CS | No Violations | 6.50 |
657967386 | 2014-7-28 0:00: | DD | No Violations | 0.50 |
For data sources see[10]