If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22529 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.6,"lon":-81.08,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Center Township | |
Operator Name: PENNENERGY RESOURCES LLC | |
Well Pad ID: US-OH-000805 | |
Farm/Lease Name: GRUNDER | |
License Status: Producing | |
License Date: 2013-11-07 | |
Spud Date: 2013-11-19 | |
Spud Drilling Contractor: SIDEWINDER DRILLING INC | |
Final Drill Date: 2013-12-05 | |
Well Total Depth: 13030.00 ft | |
Configuration: Horizontal | |
Latitude: 40.600000 | |
Longitude: -81.080000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-11-07 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/7/2013, Expired Date:11/7/2015 12:00:00 PM, Drilling unit acres:583.08, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-12-05 | |
Correction to Well | 2014-03-07 | CORRECTION TO TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE INCREASED TO 634.51 ACRES. |
Completion Report Received | 2014-12-09 | |
Correction to Well | 2015-01-16 | UPDATE TO TAKE-POINT INFORMATION (COORDINATES) FROM NEW PLAT. |
Construction Permit Expires | 2015-11-07 | |
Change of Owner | 2018-10-03 | Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC |
Record Last Modified | 2018-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-08-26 | 8279 | 12880 | 0 |
8279 | 12880 | 0 | |
8279 | 12880 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/25/2014 | 04/21/2014 | 7648 | 6,817,360.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AP Breaker | Universal | Gel Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.00005000 | 0 |
Sand | Sargent | Proppant | Silica Sand | 14808-60-7 | 100 | 11.4898 | 0 | |
Unislick ST-50 | CESI Chemical | Friction Reducer | Petroleum distillates, hydrotreated light | 64742-47-8 | 30 | 0.02775 | 0 | |
Unihib G | Geosafe | Acid Inhibitor | Acetophenone | 98-86-2 | 1 | 0.00001000 | 0 | |
Short Chained Glycol Ether | 112-34-5 | 60 | 0.00031 | 0 | ||||
Ethoxylated Alcohol | 68002-97-1 | 35 | 0.00018 | 0 | ||||
Formaldehyde | 50-00-0 | 1 | 0.00001000 | 0 | ||||
Thiourea | 62-56-6 | 1 | 0.00001000 | 0 | ||||
Methanol | 67-56-1 | 5 | 0.00003000 | 0 | ||||
WGA-7 SLR | PFP | Gel | Clay | 14808-60-7 | 5 | 0.00036 | 0 | |
Guar Gum | 9000-30-0 | 50 | 0.00356 | 0 | ||||
Surfactant | 154518-36-2 | 5 | 0.00036 | 0 | ||||
Petroleum Distillate | 64742-47-8 | 55 | 0.00392 | 0 | ||||
TEA Breaker Activator | Sagar Enterprise | Gel Breaker | Diethanolamine | 111-42-2 | 13 | 0.00013 | 0 | |
Triethanolamine | 102-71-6 | 72.5 | 0.00071 | 0 | ||||
Hydrochloric Acid (7.5%) | PPG Industries | Acidizing | Hydrochloric Acid | 7647-01-0 | 7.5 | 0.09149 | 0 | |
Water | Rex | Base Fluid | Water | 7732-18-5 | 100 | 87.1679 | 0 | |
ScaleHib A | Nalco | Scale Inhibitor | Ethylene Glycol | 107-21-1 | 30 | 0.00641 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-04-19 | H2O | 8 | 0 | 266000 | Universal Well Services Inc. | STAGE 22
60 SHOTS |
2014-04-14 | H2O | 8 | 0 | 326700 | Universal Well Services Inc. | STAGE 17
60 SHOTS |
2014-03-27 | H2O | 8 | 0 | 268100 | Universal Well Services Inc. | STAGE 3
60 SHOTS |
2014-04-13 | H2O | 8 | 0 | 308900 | Universal Well Services Inc. | STAGE 16
60 SHOTS |
2014-04-04 | H2O | 8 | 0 | 306200 | Universal Well Services Inc. | STAGE 9
60 SHOTS |
2014-03-31 | H2O | 8 | 0 | 336400 | Universal Well Services Inc. | STAGE 6
60 SHOTS |
2014-04-08 | H2O | 8 | 0 | 334000 | Universal Well Services Inc. | STAGE 12
60 SHOTS |
2014-03-19 | H2O | 8 | 0 | 323000 | Universal Well Services Inc. | STAGE 1
60 SHOTS |
2014-04-16 | H2O | 8 | 0 | 337000 | Universal Well Services Inc. | STAGE 19
60 SHOTS |
2014-04-18 | H2O | 8 | 0 | 332800 | Universal Well Services Inc. | STAGE 21
60 SHOTS |
2014-04-07 | H2O | 8 | 0 | 334400 | Universal Well Services Inc. | STAGE 11
60 SHOTS |
2014-04-05 | H2O | 8 | 0 | 335100 | Universal Well Services Inc. | STAGE 10
60 SHOTS |
2014-04-12 | H2O | 8 | 0 | 334300 | Universal Well Services Inc. | STAGE 15
60 SHOTS |
2014-04-09 | H2O | 8 | 0 | 330400 | Universal Well Services Inc. | STAGE 13
60 SHOTS |
2014-04-15 | H2O | 8 | 0 | 329700 | Universal Well Services Inc. | STAGE 18
60 SHOTS |
2014-03-29 | H2O | 8 | 0 | 350200 | Universal Well Services Inc. | STAGE 4
60 SHOTS |
2014-04-17 | H2O | 8 | 0 | 332800 | Universal Well Services Inc. | STAGE 20
60 SHOTS |
2014-04-03 | H2O | 8 | 0 | 3036 | Universal Well Services Inc. | STAGE 8
60 SHOTS |
2014-04-02 | H2O | 8 | 0 | 274400 | Universal Well Services Inc. | STAGE 7
60 SHOTS |
2014-04-10 | H2O | 8 | 0 | 335600 | Universal Well Services Inc. | STAGE 14
60 SHOTS |
2014-03-30 | H2O | 8 | 0 | 325900 | Universal Well Services Inc. | STAGE 5
60 SHOTS |
2014-03-26 | H2O | 8 | 0 | 270100 | Universal Well Services Inc. | STAGE 2
60 SHOTS |
2014-04-20 | H2O | 8 | 0 | 337400 | Universal Well Services Inc. | STAGE 23
60 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | 176939 | 20232 | 134 |
2015 | R E GAS DEVELOPMENT LLC | 357944 | 23826 | 323 |
2016 | R E GAS DEVELOPMENT LLC | 225842 | 9612 | 286 |
2017 | R E GAS DEVELOPMENT LLC | 168935 | 6367 | 346 |
2018 | PENNENERGY RESOURCES LLC | 141201 | 9461 | 271 |
2019 | PENNENERGY RESOURCES LLC | 30155 | 856 | 61 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | R E GAS DEVELOPMENT LLC | Brine | 5379 | 134 |
2015 | R E GAS DEVELOPMENT LLC | Brine | 9220 | 323 |
2016 | R E GAS DEVELOPMENT LLC | Brine | 4487 | 286 |
2017 | R E GAS DEVELOPMENT LLC | Brine | 2925 | 346 |
2018 | PENNENERGY RESOURCES LLC | Brine | 1875 | 271 |
2019 | PENNENERGY RESOURCES LLC | Brine | 174 | 61 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1139725296 | 2013-11-25 0:00 | DD | No Violations | |
-1177753145 | 2017-6-30 0:00: | PW | No Violations | |
-1402708779 | 2020-4-2 0:00:0 | PL | No Violations | 1.00 |
-1419061193 | 2017-6-15 0:00: | PW | No Violations | 1.00 |
-1472694280 | 2018-6-27 0:00: | PW | No Violations | 2.00 |
-1593421296 | 2019-10-30 0:00 | PW | No Violations | 0.90 |
-1649594624 | 2019-1-31 0:00: | PW | No Violations | |
-1904786073 | 2013-11-26 0:00 | CS | No Violations | 11.00 |
-904807140 | 2013-12-1 0:00: | DD | No Violations | |
0133896421 | 2014-06-18 | Surface Facility Construction | No Violations | I was on location to meet with Electrical Safety Inspector, Larry Elasivich from the Department of Commerce so he could inspect and approve the power supply to the production equipment on location. Larry conducted the inspection with Speelman Electric and checked all grounding and connections at the main power panel for the pad. The equipment passed inspection and a sticker was placed at the main panel. He will contact AEP to let them know the power can be turned on. No violations. |
0796524916 | 2018-02-22 | Production Wells | No Violations | I conducted a status check of the pad with DOGRM District Supervisor Stephen Ochs. The surface-intermediate and intermediate-production annular gauges both displayed a reading of zero psi. No violations were observed at the time of inspection. |
0904807140 | 2013-12-01 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Sidewinder Rig #63. Sidewinder drilled an 8.5 hole to 6,200 and were currently tripping into the hole with drill string after making repairs to the tophead drive. All equipment is on containment and drilling fluids are contained in steel tanks. No violations. |
0961225222 | 2016-01-27 | Work Over Reconditioning | No Violations | I was on the Grunder Pad to review the status of the shut - in wells due to the drilling of the Grunder # 2H. A Baker Hughes wireline unit was over the hole trying to remove the kill plug. Larry Boone ( Rex co-man ) said that they were having trouble removing the kill plug, possibly due to hydrates ( methane solids ) built upon the top of the kill plug. Due to working conditions an inspection of the annular pressures could not be performed. No violations. |
1139725296 | 2013-11-25 | Drill / Deepen / Reopen | No Violations | I was on location to check the drilling status of Sidewinder Rig #63. The rig is currently drilling the 12.25 intermediate hole. All equipment is on containment. No violations. |
1177753145 | 2017-06-30 | Production Wells | No Violations | I was on site with DOGRM Tom Hill, Bob Worstall, and Terry Whitehair, along with R.E Gas Development personnel to drilling an additional three wells (PN# 22553, 22732, 22733) on the pad. I performed a walk-around inspection while on site. The well is equipped with a plunger-lift assembly I was unable to locate a clear surface-intermediate pressure gauge on the well. I spoke to R.E. Gas Development to have a gauge installed on the surface-intermediate annulus and labelled. |
133896421 | 2014-6-18 0:00: | SC | No Violations | 3.00 |
1419061193 | 2017-06-15 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #9H well is in production and is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. A sound barrier wall was installed on the north side of the pad.
The equipment on the pad consists of the following: 7 producing wells 7 sand separators 7 gas processing units 1 vapor recovery unit 1 heat treater No violations were noted at the time of inspection. |
1472694280 | 2018-06-27 | Production Wells | No Violations | I conducted a status check of the well and production pad. Seven producing wells are located on the pad (permit numbers (2528, 2530, 2498, 2554, 2486, 2553, 2529). This well is equipped with plunger-lift configuration. The surface-intermediate annulus was equipped with a pressure-relief valve and a pressure gauge which displayed a reading of ten psi. Identification was posted at the well and lease entrance. The production tanks and production equipment were surrounded by a lined steel dike. Less than an inch of standing water was present in areas inside the tank battery. I tested the standing water for chlorides using a low-range QuanTab which concluded in a reading of less than 33 ppm. The access road was stable and drivable. Erosional controls were in place and appeared functioning.
Equipment on the pad consisted of the following: Fifteen 400 bbl production tanks; eight labelled as containing condensate and seven as containing produced water Seven gas processing units with vertical separators Two combustor units Three vapor recovery units One oil stabilization unit and tower |
1560982324 | 2019-8-27 0:00: | PW | No Violations | 0.80 |
1649594624 | 2019-01-31 | Production Wells | No Violations | The well was equipped with a plunger-lift assembly. The surface/intermediate and intermediate/production annular gauges displayed zero psi. The well was recently transferred to PennEnergy Resources LLC, and updated identification was posted. No violations were observed at the time of inspection. |
1904786073 | 2013-11-26 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 9.625 intermediate casing. Sidewinder Rig #63 drilled a 12.25 hole to a depth of 2033 (KB) and ran 47 joints of 9.625, J-55, intermediate casing to a depth of 2030 (KB). The casing landed 4 above the rig floor and Universal rigged up the cement head. Universal established circulation and conditioned the borehole with 5 barrels of calcium, 5 barrels of Flostop, and 50 barrels of gel which were each followed by 5 barrel water spacers. Universal then mixed and pumped 142 barrels of cement slurry, dropped the plug, and displaced the plug to the float collar with 152 barrels of water. The plug landed at 822psi and the pressure was increased to 1400psi and held for 5 minutes. The pressure was released and the floats were holding. 28 barrels of good cement returned and held at the surface. See casing ticket for more details on this job. No violations. |
192099680 | 2019-10-24 0:00 | PW | No Violations | 1.00 |
788360153 | 2019-10-28 0:00 | PW | No Violations | 0.90 |
796524916 | 2018-2-22 0:00: | PW | No Violations | 1.00 |
961225222 | 2016-1-27 0:00: | WR | No Violations |
For data sources see[10]