Well Details

Well ID: 34-019-22525
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Lee Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000857
Farm/Lease Name: PETERSON 36-12-4
License Status: Producing
License Date: 2014-01-21
Spud Date: 2013-12-12
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2014-03-31
Well Total Depth: 16792.00 ft
Configuration: Horizontal
Latitude: 40.540000
Longitude: -80.960000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-10-28 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:10/28/2013, Expired Date:10/28/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2014-01-21 Proposed Formations:POINT PLEASANT, Issued Date:1/21/2014, Expired Date:1/21/2016 12:00:00 PM, Drilling unit acres:681.14, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-03-31
Completion Report Received 2014-05-29
Construction Permit Expires 2016-01-21
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-02-13 8471 16511 725
8471 16511 725
8471 16511 725

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/18/2014 08/24/2014 8226 6,927,350.0 542815

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 80.9095 0
A264, B244, B317, J218, J475, J580,

J609, J610, L058, Acid, Hydrochloric 7.5pct, Acid, Hydrochloric 5pct, Acid, Hydrochloric 15pct, Northern White Sand, 100 Mesh Sand

SCHLUMBERGER Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor, Acid, Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 11.2626 0
Aliphatic acid NA 30 0.00041 0
Water 007732-18-5 85 0.01676 0
Hydrochloric Acid 007647-01-0 8 0.00475 0
Water 007732-18-5 95 0.9907 0
Propargyl Alcohol (2-Propynol) 000107-19-7 10 0.00014 0
Methanol (Methyl Alcohol) 000067-56-1 40 0.00054 0
Ammonium Sulfate 007783-20-2 30 0.01221 0
Glutaraldehyde (Pentanediol) 000111-30-8 25 0.00542 0
Aliphatic polyol NA 30 0.01454 0
Aliphatic amine polymer NA 30 0.01221 0
Hydrochloric Acid 007647-01-0 5 0.05214 0
Ammonium Persulfate 007727-54-0 100 0.00245 0
Hydrogen Chloride 007647-01-0 15 0.00296 0
Aliphatic alcohols, ethoxylated # 1 NA 30 0.00041 0
Ethylene Glycol 000107-21-1 5 0.00061 0
Ammonium Persulfate 007727-54-0 100 0.00022 0
Trisodium Ortho Phosphate 007601-54-9 5 0.00061 0
Carbohydrate polymer NA 100 0.07942 0
Sodium Erythorbate 006381-77-7 100 0.00044 0
Water 007732-18-5 93 0.05854 0
Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 2.75711 0
Potassium Hydroxide 001310-58-3 15 0.00727 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 3.73799 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-08-24 H2O 0 2521 Bbl 330621 Schlumberger STAGE 29/29

25 SHOTS

2014-08-18 H2O 0 2662 Bbl 332601 Schlumberger STAGE 1/29

25 SHOTS STAGES 2-28

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 183596 1431 35
2015 CHESAPEAKE EXPLORATION LLC 1511442 6034 296
2016 CHESAPEAKE EXPLORATION LLC 1339713 249 346
2017 CHESAPEAKE EXPLORATION LLC 825646 1 365
2018 CHESAPEAKE EXPLORATION LLC 586110 0 365
2019 CHESAPEAKE EXPLORATION LLC 123193 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 72 35
2015 CHESAPEAKE EXPLORATION LLC Brine 43 296
2016 CHESAPEAKE EXPLORATION LLC Brine 216 346
2017 CHESAPEAKE EXPLORATION LLC Brine 37 365
2018 CHESAPEAKE EXPLORATION LLC Brine 5 365
2019 CHESAPEAKE EXPLORATION LLC Brine 0 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1248615105 2015-11-23 0:00 PL No Violations
-1594299062 2018-11-6 0:00: PW No Violations 1.20
-913514095 2018-8-29 0:00: PW No Violations 1.00
0001790191 2018-08-29 Production Wells No Violations

I conducted a status check of the pad. Equipment changes since my last inspection include removal of two line heaters and the oil stabilization unit. Equipment on the pad now consisted of :

- 400 bbl production tanks, three labelled as containing produced water and three labelled as containing condensate.





The surface/intermediate annulus displayed a reading of zero psi, and the intermediate/production displayed zero 50 psi.  No violations were observed at the time of inspection
0174039096 2016-03-11 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road gate was locked. The #8H well is in production and the well is equipped with a plunger lift assembly. The pad is surrounded by a fence and all man doors were locked. The production tanks are surrounded by a steel dike. There was approximately six inches of standing water contained inside of the dike. I tested the standing water for chlorides using low-range QuanTabs which resulted in a reading of 216 ppm. The equipment on the pad consists of the following:

6- 400 bbl production tanks, three labelled as containing produced water and three labelled as containing condensate. 1 Low pressure vertical separator located inside of the dike. 7 sand separators 7 gas processing units 1 vapor recovery unit 1 oil stabilization unit 3 line heaters

0401841575 2013-12-13 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 inch conductor casing. My inspection revealed that Express had drilled a 26 inch hole to a total depth of 120 feet and ran 120 feet of 20 inch conductor casing (94 pounds per foot casing / inside diameter 19.124 inches). Allied cemented the conductor casing with 250 sacks of Class A cement with 2% CaCl and 1/2 pound per sack floseal. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.23 gallons of mix water per sack. Allied pumped 52.5 barrels of cement, 39 barrels of displacement, and there was 5 barrels of cement returns to surface. My inspection revealed no violations at this time.
0900025517 2014-03-26 Drill / Deepen / Reopen No Violations I was on location with Inspectors Farnsworth and Roush to introduce myself to the company man and exchange contact information. I will be covering Nomac #72 beginning in April. The rig is drilling ahead. No violations.
0913514095 2018-08-29 Production Wells No Violations I conducted a status check of the well and production facility. The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed a reading of 20 psi, and the intermediate production gauge displayed a reading of 70 psi. I performed a walk around inspection of the pad and no violations were observed at the time of inspection.
1248615105 2015-11-23 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1594299062 2018-11-06 Production Wells No Violations The well was equipped with an open-flow assembly. The surface/intermediate annular gauge displayed a reading of 35 psi, and the intermediate/production gauge displayed 20 psi. No violations were observed on the production pad at the time of inspection.
174039096 2016-3-11 0:00: PW No Violations 1.00
1790191 2018-8-29 0:00: PW No Violations 1.00
401841575 2013-12-13 0:00 DD No Violations 1.00
900025517 2014-3-26 0:00: DD No Violations 0.50