If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22447 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48,"lon":-80.95,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000715 | |
Farm/Lease Name: WOODLAND 26-12-4 | |
License Status: Producing | |
License Date: 2013-11-05 | |
Spud Date: 2013-07-30 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-08-14 | |
Well Total Depth: 13821.00 ft | |
Configuration: Horizontal | |
Latitude: 40.480000 | |
Longitude: -80.950000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-31 | Proposed Formations:POINT PLEASANT, Issued Date:5/31/2013, Expired Date:5/31/2015 12:00:00 PM, Drilling unit acres:154.48, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-08-14 | |
Correction to Well | 2013-09-06 | CORRECTION TO PROPOSED TOTAL DEPTH |
APP | 2013-11-05 | Proposed Formations:POINT PLEASANT, Issued Date:11/5/2013, Expired Date:11/5/2015 12:00:00 PM, Drilling unit acres:154.48, Proposed Well Type:OG, Proposed Well Class:POOL |
Correction to Well | 2014-02-07 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 133.55 ACRES. |
Completion Report Received | 2014-07-14 | |
Correction to Well | 2015-01-09 | UPDATE OF SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEW PLAT. |
Construction Permit Expires | 2015-11-05 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-07-15 | 8713 | 13610 | 630 |
8713 | 13610 | 630 | |
8713 | 13610 | 630 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/01/2013 | 11/04/2013 | 8318 | 4,853,940.0 | 373838 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | 100 Mesh Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 1.35846 | 0 |
Northern White Sand | WEATHERFORD | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 12.7531 | 0 | |
WBK-134 | WEATHERFORD | Breaker | Ammonium Persulfate | 007727-54-0 | 80 | 0.00254 | 0 | |
Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 10 | 0.00032 | 0 | ||||
WXL-100L | WEATHERFORD | Cross Linker | Ethylene Glycol | 000107-21-1 | 40 | 0.00206 | 0 | |
WCS-631LC | WEATHERFORD | Clay Stabilizer | No Hazardous Components | NONE | 0 | 0 | 0 | |
BIOCLEAR 5000 | WEATHERFORD | Anti-Bacterial Agent | 2,2-Dibromo-3-Nitrilopropionamide | 010222-01-2 | 10 | 0.00134 | 0 | |
WIC-641L | WEATHERFORD | Iron Control Agent | Citric Acid | 000077-92-9 | 70 | 0.00372 | 0 | |
WBK-133 OXIDIZER | WEATHERFORD | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00113 | 0 | |
WXL-106L | WEATHERFORD | Cross Linker | Potassium Hydroxide | 001310-58-3 | 13 | 0.00539 | 0 | |
Potassium Tetraborate | 001332-77-0 | 40 | 0.0166 | 0 | ||||
WGA-15L | WEATHERFORD | Gelling Agent | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 70 | 0.11071 | 0 | |
WFR-61LA | WEATHERFORD | Friction Reducer | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 40 | 0.0285 | 0 | |
Sodium Chloride | 007647-14-5 | 10 | 0.00712 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 7 | 0.00499 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 7 | 0.00499 | 0 | ||||
WSI-685L | WEATHERFORD | Scale Inhibitor | Methanol (Methyl Alcohol) | 000067-56-1 | 3 | 0.00034 | 0 | |
Monoethanolamine Hydrochloride | 002002-24-6 | 15 | 0.00204 | 0 | ||||
Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 15 | 0.00204 | 0 | ||||
ACID, HYDROCHLORIC, 15 PCT | WEATHERFORD | Acid | Hydrochloric Acid | 007647-01-0 | 15 | 0.13411 | 0 | |
Water | 007732-18-5 | 85 | 0.75995 | 0 | ||||
WAI-251LC | WEATHERFORD | Corrosion Inhibitor | Cinnamaldehyde | 000104-55-2 | 10 | 0.00018 | 0 | |
Dimethyl Formamide | 000068-12-2 | 40 | 0.00071 | 0 | ||||
Tar bases, quinoline derivs, benzyl chloride-qauternized | 072480-70-7 | 13 | 0.00023 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 7 | 0.00012 | 0 | ||||
Triethyl Phosphate | 000078-40-0 | 7 | 0.00012 | 0 | ||||
Branched-Ethoxylated Nonyl Phenol
(Branched-Nonyl Phenol Ethoxylate) |
068412-54-4 | 10 | 0.00018 | 0 | ||||
Ethylene Glycol | 000107-21-1 | 60 | 0.00106 | 0 | ||||
2-Butoxyethanol (Ethylene Glycol Monobutyl Ether) | 000111-76-2 | 7 | 0.00012 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 84.5943 | 0 | |
BIOCLEAR 5000, WAI-251LC, WBK-134,
WCS-631LC, WFR-61LA, WGA-15L, WIC-641L, WSI-671L, WSI-685L, WXL-100L, WXL-106L |
WEATHERFORD | Anti-Bacterial Agent, Breaker, Clay Stabilizer, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, Scale Inhibitor | Sorbitan | 008007-43-0 | 0 | 0.11048 | 0 | |
Proprietary Glycol | TRADE SECRET | 0 | 0.00509 | 0 | ||||
Polyethylene Glycol | 025322-68-3 | 0 | 0.01481 | 0 | ||||
Alcohols ethoxylated C12-16 | 068551-12-2 | 0 | 0.11048 | 0 | ||||
Proprietary Phosphonic Acid Ammonium Salt | TRADE SECRET | 0 | 0.01409 | 0 | ||||
Proprietary Breaker Additive (WBK-134) | TRADE SECRET | 0 | 0.00129 | 0 | ||||
Proprietary Ethoxylated Nonylphenol | TRADE SECRET | 0 | 0.0006 | 0 | ||||
Water | 007732-18-5 | 0 | 0.17121 | 0 | ||||
Proprietary Friction Reducer Additive (WFR-61LA) | TRADE SECRET | 0 | 0.06138 | 0 | ||||
Proprietary Alcohol | TRADE SECRET | 0 | 0.0006 | 0 | ||||
Amines, polyethylenepoly-, ethoxylated, phosphonomethylated | 068966-36-9 | 0 | 0.00167 | 0 | ||||
Boric Acid (2-aminoethanol) | 068425-67-2 | 0 | 0.00509 | 0 | ||||
Proprietary Non-Hazardous Salt | TRADE SECRET | 0 | 0.09793 | 0 | ||||
Guar Gum | 009000-30-0 | 0 | 0.11048 | 0 | ||||
WSI-671L | WEATHERFORD | Scale Inhibitor | Quaternary Ammonium Chloride (Ammonium Chloride) | 012125-02-9 | 20 | 0.00032 | 0 | |
Water | 007732-18-5 | 0 | 0 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-11-01 | H2O | 15 | 6737 Bbl | 376400 | Weatherford | STAGE 1/18
35 SHOTS |
2013-11-04 | H2O | 15 | 5927 Bbl | 375000 | Weatherford | STAGE 18/18
35 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 36358 | 255 | 7 |
2014 | CHESAPEAKE EXPLORATION LLC | 1124726 | 3673 | 229 |
2015 | CHESAPEAKE EXPLORATION LLC | 414471 | 3407 | 106 |
2016 | CHESAPEAKE EXPLORATION LLC | 1004047 | 143 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 631293 | 11 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 453180 | 9 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 92952 | 5 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 1612 | 7 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 5087 | 229 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 4906 | 106 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 9091 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 3270 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 2127 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 416 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1465988095 | 2017-11-16 0:00 | PL | No Violations | 1.00 |
-1813882308 | 2013-7-2 0:00:0 | CS | No Violations | 4.00 |
-330410557 | 2013-6-24 0:00: | DD | No Violations | 3.00 |
0330410557 | 2013-06-24 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of the well pad completion. Nomac 72 will be coming to this location following the completion of the Putnam wells. Currently the conductor is drilled for this well and is awaiting the rig. Erosion controls have been put into place but the vegetation has not yet started to grow. Slag piles are still on the pad but will be put into place today. |
1465988095 | 2017-11-16 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The pad is equipped with nine producing wells. The well was equipped with a plunger-lift assembly. The surface--lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipaters. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
One low-pressure vertical separator Five line heaters Nine sand separators Nine gas processing units One combustor unit One heat treater Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. Preliminary restoration can be passed. |
1813882308 | 2013-07-02 | Casing String Witnessed | No Violations | I was onsite with inspector Brett Farnsworth to witness the cementing of the 6H and 3H conductors for this location. Currently the pad is only partially completed. The location has been graded and had partial amounts of erosion control and drainage installed. The conductors have been drilled before any slag or gravel has been laid on the pad. This conductor was drilled to 120 and would be cemented to surface. There was a delay in the job as vacuum trucks were late on arrival. The cement job was pumped as planned and in total around 9 barrels of cement were returned to surface and CaCl was added to quick set the cement. There are no violations at this time. |
For data sources see[10]