X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22427

Well Details

Well ID: 34-019-22427
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Loudon Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000736
Farm/Lease Name: SMITH NURSERY 19-13-5
License Status: Producing
License Date: 2013-06-10
Spud Date: 2013-07-17
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-07-27
Well Total Depth: 14944.00 ft
Configuration: Horizontal
Latitude: 40.480000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-13 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/13/2013, Expired Date:5/13/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-06-10 Proposed Formations:POINT PLEASANT, Issued Date:6/10/2013, Expired Date:6/10/2015 12:00:00 PM, Drilling unit acres:186.13, Proposed Well Type:OG, Proposed Well Class:
Reached Total Depth 2013-07-27
Correction to Well 2014-02-28 CORRECTED TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 167.64 ACRES.
Completion Report Received 2014-05-28
Construction Permit Expires 2015-06-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-18 8298 14714 725
8298 14714 725
8298 14714 725

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/30/2013 01/03/2014 8134 6,239,350.0 455387

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 PTLIS352 PERFORMANCE TECHNOLOGIES Iron Control Agent Citric Acid 000077-92-9 100 0.0006 0
PTLFR200 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Aliphatic Hydrocarbon TRADE SECRET 30 0.01157 0
Proprietary Oxyalkylated Alcohol TRADE SECRET 5 0.00193 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 76.2317 0
PTLAI161 PERFORMANCE TECHNOLOGIES Corrosion Inhibitor Proprietary Ethoxylated Alcohol Blend TRADE SECRET 10 0.00019 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00114 0
Proprietary Fatty Alcohol Ethoxylate TRADE SECRET 30 0.00057 0
Proprietary Alkyl Amine Surfactant TRADE SECRET 5 0.00009000 0
PTLBW102 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00216 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 6.48301 0
EC6111A NALCO Anti-Bacterial Agent Water 007732-18-5 0 0.02664 0
Glutaraldehyde (Pentanediol) 000111-30-8 30 0.00773 0
PTLAI161, PTLBW112, PTLFR200, PTLGL240, PTLSI372 PERFORMANCE TECHNOLOGIES Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Scale Inhibitor Proprietary Oxyalkylated Alcohol TRADE SECRET 0 0.00002000 0
Proprietary Clay TRADE SECRET 0 0.18104 0
Proprietary Oxyalkylated Fatty Acid Derivative TRADE SECRET 0 0.03944 0
Petroleum Distillate Hydrotreated Light 064742-47-8 0 0.18104 0
Sodium Chloride 007647-14-5 0 0.03944 0
Guar Gum 009000-30-0 0 0.18104 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 0 0.03944 0
Proprietary Polyether TRADE SECRET 0 0.00002000 0
Proprietary Surfactant TRADE SECRET 0 0.18104 0
Methanol (Methyl Alcohol) 000067-56-1 0 0.00002000 0
Proprietary Polycarboxylic Acid Polymer TRADE SECRET 0 0.02078 0
Proprietary Fatty Amino Adduct TRADE SECRET 0 0.00065 0
Proprietary Aliphatic Alcohol TRADE SECRET 0 0.03944 0
Copper Sulfate 007758-98-7 0 0.00044 0
Water 007732-18-5 0 0.06087 0
Proprietary Substituted Fatty Acid Ester TRADE SECRET 0 0.03944 0
Proprietary Vinyl Copolymer TRADE SECRET 0 0.04391 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 9.29371 0
PTLBW112 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00973 0
PTLCA102 PERFORMANCE TECHNOLOGIES Cross Linker Sodium Hydroxide 001310-73-2 60 0.02462 0
Proprietary Inorganic Salt TRADE SECRET 30 0.01231 0
Proprietary Alkyl Alcohol TRADE SECRET 60 0.02462 0
100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 6.49488 0
PTLGL240 PERFORMANCE TECHNOLOGIES Gelling Agent No Hazardous Components NONE 0 0 0
PTLMP136 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 85 1.02118 0
Hydrochloric Acid 007647-01-0 15 0.18021 0
PTLSI372 PERFORMANCE TECHNOLOGIES Scale Inhibitor No Hazardous Components NONE 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-01-03 H2O 15 5361 Bbl 329700 Performance Technologies STAGE 24

30 SHOTS

2014-01-01 H2O 15 5953 Bbl 332900 Performance Technologies STAGE 10

30 SHOTS

2014-01-02 H2O 15 5935 Bbl 335085 Performance Technologies STAGE 16

30 SHOTS

2014-01-03 H2O 15 5874 Bbl 331260 Performance Technologies STAGE 21

30 SHOTS

0 0 0
0 0 0
2014-01-01 H2O 15 5959 Bbl 336440 Performance Technologies STAGE 13

30 SHOTS

2013-12-30 H2O 15 6033 Bbl 337560 Performance Technologies STAGE 4

30 SHOTS

2014-01-02 H2O 15 5908 Bbl 331960 Performance Technologies STAGE 19

30 SHOTS

2013-12-30 H2O 15 5973 Bbl 333700 Performance Technologies STAGE 3

30 SHOTS

2014-01-03 H2O 15 5919 Bbl 332200 Performance Technologies STAGE 20

30 SHOTS

2014-01-01 H2O 15 5900 Bbl 329800 Performance Technologies STAGE 14

30 SHOTS

2014-01-02 H2O 15 5914 Bbl 334480 Performance Technologies STAGE 18

30 SHOTS

2003-12-31 H2O 15 5983 Bbl 332060 Performance Technologies STAGE 9

30 SHOTS

2013-12-31 H2O 15 5978 Bbl 331860 Performance Technologies STAGE 6

30 SHOTS

2013-12-30 H2O 15 5882 Bbl 333340 Performance Technologies STAGE 2

30 SHOTS

2014-01-01 H2O 15 6145 Bbl 332980 Performance Technologies STAGE 11

30 SHOTS

2014-01-02 H2O 15 6028 Bbl 332460 Performance Technologies STAGE 15

30 SHOTS

0 0 0
2013-12-30 H2O 15 6052 Bbl 329940 Performance Technologies STAGE 1

35 SHOTS

2014-01-02 H2O 15 5918 Bbl 332160 Performance Technologies STAGE 17

30 SHOTS

0 0 0
2014-01-03 H2O 15 5856 Bbl 333080 Performance Technologies STAGE 22

30 SHOTS

2013-12-30 H2O 15 5978 Bbl 331380 Performance Technologies STAGE 5

30 SHOTS

2013-12-31 H2O 15 5967 Bbl 333020 Performance Technologies STAGE 8

30 SHOTS

0 0 0
2014-01-01 H2O 15 5955 Bbl 331640 Performance Technologies STAGE 12

30 SHOTS

2013-12-31 H2O 15 5953 Bbl 332760 Performance Technologies STAGE 7

30 SHOTS

2014-01-03 H2O 15 5831 Bbl 330880 Performance Technologies STAGE 23

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 557492 14491 293
2015 CHESAPEAKE EXPLORATION LLC 399610 5756 364
2016 CHESAPEAKE EXPLORATION LLC 302978 4001 366
2017 CHESAPEAKE EXPLORATION LLC 251096 2392 365
2018 CHESAPEAKE EXPLORATION LLC 214093 1624 365
2019 CHESAPEAKE EXPLORATION LLC 48159 422 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 14048 293
2015 CHESAPEAKE EXPLORATION LLC Brine 4895 364
2016 CHESAPEAKE EXPLORATION LLC Brine 2945 366
2017 CHESAPEAKE EXPLORATION LLC Brine 2702 365
2018 CHESAPEAKE EXPLORATION LLC Brine 2010 365
2019 CHESAPEAKE EXPLORATION LLC Brine 433 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1249915067 2013-7-17 0:00: DD No Violations 3.00
-1293129181 2015-10-23 0:00 PL No Violations
-202412766 2013-7-17 0:00: CS No Violations 6.00
-883198763 2013-7-17 0:00: AM No Violations 1.00
-978659141 2017-3-1 0:00:0 PW No Violations 1.00
0202412766 2013-07-17 Casing String Witnessed No Violations I was onsite to witness the cementing of the 13 3/8 surface casing set to 575. The job was pumped as scheduled. The cement was scaled at 15.6ppg before it was pumped down hole. In total 31 barrels of cement weighing in at 15.5ppg were returned to surface. They will nipple up the conductor and set the blowout preventer before they continue onto their intermediate hole.
0745901826 2013-07-28 Casing String Witnessed No Violations I was onsite to witness the cementing of the 5.5 production casing set to 14,919 feet. The job was pumped as planned without any issues and mudpush was returned to surface meaning cement is up into the intermediate casing as desired. They are going release the rig and drill the 10h and 12h conductors before they walk the rig and continue drilling anymore on this location.
0883198763 2013-07-17 Administrative Inspection No Violations I was contatced by Nomac 72 at 2:30am informing me that they are about to spud the well. They estimate that they would be starting to pump cement at roughly 15:00 today.
0978659141 2017-03-01 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #8H well is in production and is equipped with a plunger lift assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 4 producing wells

1 Low pressure vertical separator located inside of dike 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater 1 compressor station

No violations were found during my inspection.

1249915067 2013-07-17 Drill / Deepen / Reopen No Violations I was onsite to witness the cementing of the surface casing but there was an issue running casing causing a delay. When they were running casing the collar on a joint caught the conductor causing it to be bent and lodged therefore preventing casing from being run. They had to nipple down the conductor in order to run the casing.
1293129181 2015-10-23 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1374159012 2013-07-16 Drill / Deepen / Reopen No Violations I was onsite to check the status of Nomac 72 progress in beginning to prepare to spud the 8H well. They were able to walk to the rig in 8 hours and are currently welding and modifying the flowline to the rig and plan to spud the rig at 18:00 hours today. They plan on setting 13 3/8 surface casing to a depth of roughly 585.
1375372453 2013-07-26 Drill / Deepen / Reopen No Violations I was onsite to check the status of Nomac 72 drilling the lateral. They are currently tripping in the hole with a pulse tool so that they can slide drill their lateral back into their target window. They expect to TD the well at 14,900 ft in the next several hours of drilling.
1970021557 2013-06-20 Not Drilled No Violations I was inspecting this location to determine how much longer construction has before the location can be completed. Nomac 72 is going to be moving to this location when they completed the final well on the Putnam well pad. Currently an auger rig is on location drilling conductors for the location. I was not able to access the pad due to a very large number of slag trucks waiting to access the pad. Erosion controls have been installed around the location but growth has not been established yet. It appears the location is still several days away from being completed. There are no violations at this time.
745901826 2013-7-28 0:00: CS No Violations 8.00

For data sources see[10]

References