34-019-22426

Well Details

Well ID: 34-019-22426
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Loudon Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000736
Farm/Lease Name: SMITH NURSERY 19-13-5
License Status: Producing
License Date: 2013-07-17
Spud Date: 2013-08-12
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-08-20
Well Total Depth: 14669.00 ft
Configuration: Horizontal
Latitude: 40.480000
Longitude: -81.030000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-05-13 Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/13/2013, Expired Date:5/13/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-07-17 Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:152.95, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-08-20
Correction to Well 2013-11-29 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 139.34 ACRES.
Correction to Well 2014-02-28 ADJUSTED TAKE-POINT COORDINTES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 138.53 ACRES.
Completion Report Received 2014-05-28
Construction Permit Expires 2015-07-17
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-14 9313 14457 575
9313 14457 575
9313 14457 575

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/15/2014 01/19/2014 8153 4,937,480.0 358766

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 PTLGL240 PERFORMANCE TECHNOLOGIES Gelling Agent No Hazardous Components NONE 0 0 0
PTLCA102 PERFORMANCE TECHNOLOGIES Cross Linker Proprietary Inorganic Salt TRADE SECRET 30 0.01235 0
Sodium Hydroxide 001310-73-2 60 0.0247 0
Proprietary Alkyl Alcohol TRADE SECRET 60 0.0247 0
PTLFR200 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Oxyalkylated Alcohol TRADE SECRET 5 0.00069 0
Proprietary Aliphatic Hydrocarbon TRADE SECRET 30 0.00413 0
PTLMP136 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 85 1.0167 0
Hydrochloric Acid 007647-01-0 15 0.17942 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 77.5796 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 9.07309 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 7.95744 0
PTLBW102 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00224 0
PTLSI372 PERFORMANCE TECHNOLOGIES Scale Inhibitor No Hazardous Components NONE 0 0 0
PTLIS352 PERFORMANCE TECHNOLOGIES Iron Control Agent Citric Acid 000077-92-9 100 0.0006 0
100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 3.9186 0
PTLAI161 PERFORMANCE TECHNOLOGIES Corrosion Inhibitor Proprietary Fatty Alcohol Ethoxylate TRADE SECRET 30 0.00057 0
Proprietary Ethoxylated Alcohol Blend TRADE SECRET 10 0.00019 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00115 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
Proprietary Alkyl Amine Surfactant TRADE SECRET 5 0.0001 0
PTLBW112 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00991 0
PTLAI161, PTLBW112, PTLFR200, PTLGL240, PTLSI372 PERFORMANCE TECHNOLOGIES Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Scale Inhibitor Petroleum Distillate Hydrotreated Light 064742-47-8 0 0.18918 0
Proprietary Fatty Amino Adduct TRADE SECRET 0 0.00066 0
Sodium Chloride 007647-14-5 0 0.01408 0
Water 007732-18-5 0 0.0323 0
Proprietary Clay TRADE SECRET 0 0.18918 0
Proprietary Oxyalkylated Fatty Acid Derivative TRADE SECRET 0 0.01408 0
Guar Gum 009000-30-0 0 0.18918 0
Proprietary Vinyl Copolymer TRADE SECRET 0 0.01864 0
Proprietary Polycarboxylic Acid Polymer TRADE SECRET 0 0.01755 0
Proprietary Polyether TRADE SECRET 0 0.00002000 0
Proprietary Aliphatic Alcohol TRADE SECRET 0 0.01408 0
Proprietary Surfactant TRADE SECRET 0 0.18918 0
Proprietary Substituted Fatty Acid Ester TRADE SECRET 0 0.01408 0
Methanol (Methyl Alcohol) 000067-56-1 0 0.00002000 0
Copper Sulfate 007758-98-7 0 0.00016 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 0 0.01408 0
Proprietary Oxyalkylated Alcohol TRADE SECRET 0 0.00002000 0
EC6111A NALCO Anti-Bacterial Agent Water 007732-18-5 0 0.02654 0
Glutaraldehyde (Pentanediol) 000111-30-8 30 0.0077 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-01-17 H2O 15 6049 Bbl 331340 Performance Technologies STAGE 11

30 SHOTS

2014-01-19 H2O 15 5994 Bbl 335760 Performance Technologies STAGE 18

30 SHOTS

2014-01-19 H2O 15 5954 Bbl 332260 Performance Technologies STAGE 16

30 SHOTS

2014-01-17 H2O 15 5564 Bbl 332700 Performance Technologies STAGE 8

30 SHOTS

2014-01-19 H2O 15 5814 Bbl 328660 Performance Technologies STAGE 19

30 SHOTS

2014-01-19 H2O 15 5532 Bbl 326220 Performance Technologies STAGE 17

30 SHOTS

2014-01-08 H2O 15 5966 Bbl 332000 Performance Technologies STAGE 12

30 SHOTS

2014-01-17 H2O 15 6141 Bbl 329840 Performance Technologies STAGE 7

30 SHOTS

2014-01-06 H2O 15 6020 Bbl 33220 Performance Technologies STAGE 5

30 SHOTS

2014-01-15 H2O 15 6083 Bbl 328600 Performance Technologies STAGE 2

30 SHOTS

2014-01-17 H2O 15 6075 Bbl 332040 Performance Technologies STAGE 9

30 SHOTS

2014-01-17 H2O 15 6031 Bbl 331560 Performance Technologies STAGE 10

30 SHOTS

2014-01-16 H2O 15 6010 Bbl 332000 Performance Technologies STAGE 6

30 SHOTS

2014-01-18 H2O 15 6029 Bbl 331980 Performance Technologies STAGE 13

30 SHOTS

2014-01-15 H2O 15 6148 Bbl 334720 Performance Technologies STAGE 1

35 SHOTS

2014-01-16 H2O 15 6105 Bbl 331140 Performance Technologies STAGE 4

30 SHOTS

2014-01-16 H2O 15 5622 Bbl 330740 Performance Technologies STAGE 3

30 SHOTS

2014-01-18 H2O 15 5922 Bbl 335100 Performance Technologies STAGE 14

30 SHOTS

2014-01-18 H2O 15 6158 Bbl 345320 Performance Technologies STAGE 15

30 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 782707 21974 280
2015 CHESAPEAKE EXPLORATION LLC 718388 7104 335
2016 CHESAPEAKE EXPLORATION LLC 515675 3219 366
2017 CHESAPEAKE EXPLORATION LLC 403063 2280 364
2018 CHESAPEAKE EXPLORATION LLC 328549 1468 365
2019 CHESAPEAKE EXPLORATION LLC 71724 455 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 7229 280
2015 CHESAPEAKE EXPLORATION LLC Brine 5952 335
2016 CHESAPEAKE EXPLORATION LLC Brine 2279 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1377 364
2018 CHESAPEAKE EXPLORATION LLC Brine 1619 365
2019 CHESAPEAKE EXPLORATION LLC Brine 440 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1308476950 2015-10-23 0:00 PL No Violations
-2097752832 2013-7-29 0:00: AM No Violations 1.00
-217260400 2013-8-13 0:00: AM No Violations 0.50
0146895105 2013-07-29 Drill / Deepen / Reopen No Violations I was onsite to witness the drilling of the 10H and 12H conductors. Normally Express will drill the cellars and then drill the conductor and mouse holes. In an effort to save time they are going to drill the conductors and then dig our of the cellars. They expect to have the wells drilled today and cement the conductors the following day.
0217260400 2013-08-13 Administrative Inspection No Violations I was contacted by Nomac 72 informing me that they should be cementing the intermediate casing sometime in the early mourning. They have currently TD their section and are going to pull out of the hole to run a cement bond log over their surface casing.
0490241873 2013-08-14 Drill / Deepen / Reopen No Violations I was onsite to check the status of Nomac 72. They are currently waiting on cement for 8 hours. Currently they are cutting and slipping the drill line. Following this they will trip into the hole and blow the hole clean in order to start drilling their 8.75 vertical section.
0503010572 2013-07-30 Casing String Witnessed No Violations I was on location to witness the cementing of the 12H well conductor set to 120 feet. The well was pumped as planned and in total 8 barrels of cement were returned to surface. They are going to sit on the wells for 4 hours before drilling the mouse holes for the wells. One they are done they will walk the rig over the 10H well.
0739130372 2013-06-20 Not Drilled No Violations I was inspecting this location to determine how much longer construction has before the location can be completed. Nomac 72 is going to be moving to this location when they completed the final well on the Putnam well pad. Currently an auger rig is on location drilling conductors for the location. I was not able to access the pad due to a very large number of slag trucks waiting to access the pad. Erosion controls have been installed around the location but growth has not been established yet. It appears the location is still several days away from being completed. There are no violations at this time.
1240784297 2013-06-24 Not Drilled No Violations I was onsite to check the status of the well pad completion. Nomac 72 will be coming to this location following the completion of the Putnam wells. Currently no conductor has been drilled for this well. This well is permitted as a stratograph well and it is likely that Chesapeake will not drill it. They will likely repermit the well for strictly a horizontal well.
1308476950 2015-10-23 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1376266819 2013-08-11 Drill / Deepen / Reopen No Violations I was contacted by Nomac 72 informing me that they are going to be spudding the well tonight and expect to run can cement casing tomorrow.
1376594219 2013-08-12 Casing String Witnessed No Violations I was onsite to witness the cementing of the 13 3/8 surface casing set to 582 feet. The job was pumped as planned and 114.5 barrels of cement weighing 15.6ppg was pumped down hole. In total 32 barrels of good cement were returned to surface. They are going to drill their intermediate hole o roughly 1900 feet after they wait on cement.
1425406829 2013-08-21 Drill / Deepen / Reopen No Violations I was on location to check the status of the drilling of this well. Currently the rig has drilled the entire well and is tripping out with 1400 of drill pipe still to lay down. They expect to be cementing the 5.5 prioduction casing tommorrow afternoon.
146895105 2013-7-29 0:00: DD No Violations 4.00
1739192673 2017-03-01 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #12H well is in production and is equipped with an open flow assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consists of the following: 4 producing wells

1 Low pressure vertical separator located inside of dike 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater 1 compressor station

No violations were found during my inspection.

1767972906 2013-08-22 Casing String Witnessed No Violations I was onsite to witness the cementing of the 5.5 production casing for this well. The job was pumped as planned and mudpush was returned to surface as per the engineered plan. The pug was bumped at 2680psi and was held at 3480 psi. The floats did not hold and 4.5 barrels were bleed back to the truck. Another 1.5 barrels were pumped to hold the pressure to 3600 psi and again the floats did not hold. They are going to shut in the well and weight on cement for 12 hours before they attempt to bleed back the floats. Pressure will be monitored as to not overpressure the cement and equipment.
2097752832 2013-07-29 Administrative Inspection No Violations I was contacted by Chesapeake informing me that they are going to begin drilling the 10H and 12H conductors on this location. They stated that Express Energy is going to come in and drill both conductors to 120 feet and cement them the following day.
490241873 2013-8-14 0:00: DD No Violations 3.00
503010572 2013-7-30 0:00: CS No Violations 5.00
739130372 2013-6-20 0:00: ND No Violations 3.00