Well ID: 34-019-22426 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.48,"lon":-81.03,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: Loudon Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000736 | |
Farm/Lease Name: SMITH NURSERY 19-13-5 | |
License Status: Producing | |
License Date: 2013-07-17 | |
Spud Date: 2013-08-12 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-08-20 | |
Well Total Depth: 14669.00 ft | |
Configuration: Horizontal | |
Latitude: 40.480000 | |
Longitude: -81.030000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-13 | Proposed Formations:TRENTON BLACK RIVER, Issued Date:5/13/2013, Expired Date:5/13/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2013-07-17 | Proposed Formations:POINT PLEASANT, Issued Date:7/17/2013, Expired Date:7/17/2015 12:00:00 PM, Drilling unit acres:152.95, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-08-20 | |
Correction to Well | 2013-11-29 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 139.34 ACRES. |
Correction to Well | 2014-02-28 | ADJUSTED TAKE-POINT COORDINTES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 138.53 ACRES. |
Completion Report Received | 2014-05-28 | |
Construction Permit Expires | 2015-07-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-08-14 | 9313 | 14457 | 575 |
9313 | 14457 | 575 | |
9313 | 14457 | 575 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/15/2014 | 01/19/2014 | 8153 | 4,937,480.0 | 358766 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | PTLGL240 | PERFORMANCE TECHNOLOGIES | Gelling Agent | No Hazardous Components | NONE | 0 | 0 | 0 |
PTLCA102 | PERFORMANCE TECHNOLOGIES | Cross Linker | Proprietary Inorganic Salt | TRADE SECRET | 30 | 0.01235 | 0 | |
Sodium Hydroxide | 001310-73-2 | 60 | 0.0247 | 0 | ||||
Proprietary Alkyl Alcohol | TRADE SECRET | 60 | 0.0247 | 0 | ||||
PTLFR200 | PERFORMANCE TECHNOLOGIES | Friction Reducer | Proprietary Oxyalkylated Alcohol | TRADE SECRET | 5 | 0.00069 | 0 | |
Proprietary Aliphatic Hydrocarbon | TRADE SECRET | 30 | 0.00413 | 0 | ||||
PTLMP136 | PERFORMANCE TECHNOLOGIES | Acid | Water | 007732-18-5 | 85 | 1.0167 | 0 | |
Hydrochloric Acid | 007647-01-0 | 15 | 0.17942 | 0 | ||||
Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 77.5796 | 0 | |
Northern White Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 9.07309 | 0 | |
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 7.95744 | 0 | |
PTLBW102 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00224 | 0 | |
PTLSI372 | PERFORMANCE TECHNOLOGIES | Scale Inhibitor | No Hazardous Components | NONE | 0 | 0 | 0 | |
PTLIS352 | PERFORMANCE TECHNOLOGIES | Iron Control Agent | Citric Acid | 000077-92-9 | 100 | 0.0006 | 0 | |
100 Mesh Sand | PERFORMANCE TECHNOLOGIES | Proppant - Natural | Crystalline Silica (Quartz Sand, Silicon Dioxide) | 014808-60-7 | 100 | 3.9186 | 0 | |
PTLAI161 | PERFORMANCE TECHNOLOGIES | Corrosion Inhibitor | Proprietary Fatty Alcohol Ethoxylate | TRADE SECRET | 30 | 0.00057 | 0 | |
Proprietary Ethoxylated Alcohol Blend | TRADE SECRET | 10 | 0.00019 | 0 | ||||
Isopropanol (Isopropyl Alcohol, Propan-2-ol) | 000067-63-0 | 60 | 0.00115 | 0 | ||||
Proprietary Aromatic Aldehyde | TRADE SECRET | 10 | 0.00019 | 0 | ||||
Proprietary Alkyl Amine Surfactant | TRADE SECRET | 5 | 0.0001 | 0 | ||||
PTLBW112 | PERFORMANCE TECHNOLOGIES | Breaker | Ammonium Persulfate | 007727-54-0 | 100 | 0.00991 | 0 | |
PTLAI161, PTLBW112, PTLFR200, PTLGL240, PTLSI372 | PERFORMANCE TECHNOLOGIES | Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Scale Inhibitor | Petroleum Distillate Hydrotreated Light | 064742-47-8 | 0 | 0.18918 | 0 | |
Proprietary Fatty Amino Adduct | TRADE SECRET | 0 | 0.00066 | 0 | ||||
Sodium Chloride | 007647-14-5 | 0 | 0.01408 | 0 | ||||
Water | 007732-18-5 | 0 | 0.0323 | 0 | ||||
Proprietary Clay | TRADE SECRET | 0 | 0.18918 | 0 | ||||
Proprietary Oxyalkylated Fatty Acid Derivative | TRADE SECRET | 0 | 0.01408 | 0 | ||||
Guar Gum | 009000-30-0 | 0 | 0.18918 | 0 | ||||
Proprietary Vinyl Copolymer | TRADE SECRET | 0 | 0.01864 | 0 | ||||
Proprietary Polycarboxylic Acid Polymer | TRADE SECRET | 0 | 0.01755 | 0 | ||||
Proprietary Polyether | TRADE SECRET | 0 | 0.00002000 | 0 | ||||
Proprietary Aliphatic Alcohol | TRADE SECRET | 0 | 0.01408 | 0 | ||||
Proprietary Surfactant | TRADE SECRET | 0 | 0.18918 | 0 | ||||
Proprietary Substituted Fatty Acid Ester | TRADE SECRET | 0 | 0.01408 | 0 | ||||
Methanol (Methyl Alcohol) | 000067-56-1 | 0 | 0.00002000 | 0 | ||||
Copper Sulfate | 007758-98-7 | 0 | 0.00016 | 0 | ||||
Tetrasodium Ethylenediaminetetraacetate | 000064-02-8 | 0 | 0.01408 | 0 | ||||
Proprietary Oxyalkylated Alcohol | TRADE SECRET | 0 | 0.00002000 | 0 | ||||
EC6111A | NALCO | Anti-Bacterial Agent | Water | 007732-18-5 | 0 | 0.02654 | 0 | |
Glutaraldehyde (Pentanediol) | 000111-30-8 | 30 | 0.0077 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-01-17 | H2O | 15 | 6049 Bbl | 331340 | Performance Technologies | STAGE 11
30 SHOTS |
2014-01-19 | H2O | 15 | 5994 Bbl | 335760 | Performance Technologies | STAGE 18
30 SHOTS |
2014-01-19 | H2O | 15 | 5954 Bbl | 332260 | Performance Technologies | STAGE 16
30 SHOTS |
2014-01-17 | H2O | 15 | 5564 Bbl | 332700 | Performance Technologies | STAGE 8
30 SHOTS |
2014-01-19 | H2O | 15 | 5814 Bbl | 328660 | Performance Technologies | STAGE 19
30 SHOTS |
2014-01-19 | H2O | 15 | 5532 Bbl | 326220 | Performance Technologies | STAGE 17
30 SHOTS |
2014-01-08 | H2O | 15 | 5966 Bbl | 332000 | Performance Technologies | STAGE 12
30 SHOTS |
2014-01-17 | H2O | 15 | 6141 Bbl | 329840 | Performance Technologies | STAGE 7
30 SHOTS |
2014-01-06 | H2O | 15 | 6020 Bbl | 33220 | Performance Technologies | STAGE 5
30 SHOTS |
2014-01-15 | H2O | 15 | 6083 Bbl | 328600 | Performance Technologies | STAGE 2
30 SHOTS |
2014-01-17 | H2O | 15 | 6075 Bbl | 332040 | Performance Technologies | STAGE 9
30 SHOTS |
2014-01-17 | H2O | 15 | 6031 Bbl | 331560 | Performance Technologies | STAGE 10
30 SHOTS |
2014-01-16 | H2O | 15 | 6010 Bbl | 332000 | Performance Technologies | STAGE 6
30 SHOTS |
2014-01-18 | H2O | 15 | 6029 Bbl | 331980 | Performance Technologies | STAGE 13
30 SHOTS |
2014-01-15 | H2O | 15 | 6148 Bbl | 334720 | Performance Technologies | STAGE 1
35 SHOTS |
2014-01-16 | H2O | 15 | 6105 Bbl | 331140 | Performance Technologies | STAGE 4
30 SHOTS |
2014-01-16 | H2O | 15 | 5622 Bbl | 330740 | Performance Technologies | STAGE 3
30 SHOTS |
2014-01-18 | H2O | 15 | 5922 Bbl | 335100 | Performance Technologies | STAGE 14
30 SHOTS |
2014-01-18 | H2O | 15 | 6158 Bbl | 345320 | Performance Technologies | STAGE 15
30 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | 782707 | 21974 | 280 |
2015 | CHESAPEAKE EXPLORATION LLC | 718388 | 7104 | 335 |
2016 | CHESAPEAKE EXPLORATION LLC | 515675 | 3219 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 403063 | 2280 | 364 |
2018 | CHESAPEAKE EXPLORATION LLC | 328549 | 1468 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 71724 | 455 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 7229 | 280 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 5952 | 335 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2279 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1377 | 364 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1619 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 440 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1308476950 | 2015-10-23 0:00 | PL | No Violations | |
-2097752832 | 2013-7-29 0:00: | AM | No Violations | 1.00 |
-217260400 | 2013-8-13 0:00: | AM | No Violations | 0.50 |
0146895105 | 2013-07-29 | Drill / Deepen / Reopen | No Violations | I was onsite to witness the drilling of the 10H and 12H conductors. Normally Express will drill the cellars and then drill the conductor and mouse holes. In an effort to save time they are going to drill the conductors and then dig our of the cellars. They expect to have the wells drilled today and cement the conductors the following day. |
0217260400 | 2013-08-13 | Administrative Inspection | No Violations | I was contacted by Nomac 72 informing me that they should be cementing the intermediate casing sometime in the early mourning. They have currently TD their section and are going to pull out of the hole to run a cement bond log over their surface casing. |
0490241873 | 2013-08-14 | Drill / Deepen / Reopen | No Violations | I was onsite to check the status of Nomac 72. They are currently waiting on cement for 8 hours. Currently they are cutting and slipping the drill line. Following this they will trip into the hole and blow the hole clean in order to start drilling their 8.75 vertical section. |
0503010572 | 2013-07-30 | Casing String Witnessed | No Violations | I was on location to witness the cementing of the 12H well conductor set to 120 feet. The well was pumped as planned and in total 8 barrels of cement were returned to surface. They are going to sit on the wells for 4 hours before drilling the mouse holes for the wells. One they are done they will walk the rig over the 10H well. |
0739130372 | 2013-06-20 | Not Drilled | No Violations | I was inspecting this location to determine how much longer construction has before the location can be completed. Nomac 72 is going to be moving to this location when they completed the final well on the Putnam well pad. Currently an auger rig is on location drilling conductors for the location. I was not able to access the pad due to a very large number of slag trucks waiting to access the pad. Erosion controls have been installed around the location but growth has not been established yet. It appears the location is still several days away from being completed. There are no violations at this time. |
1240784297 | 2013-06-24 | Not Drilled | No Violations | I was onsite to check the status of the well pad completion. Nomac 72 will be coming to this location following the completion of the Putnam wells. Currently no conductor has been drilled for this well. This well is permitted as a stratograph well and it is likely that Chesapeake will not drill it. They will likely repermit the well for strictly a horizontal well. |
1308476950 | 2015-10-23 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is open flow with a wellhead Christmas tree assembly. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
1376266819 | 2013-08-11 | Drill / Deepen / Reopen | No Violations | I was contacted by Nomac 72 informing me that they are going to be spudding the well tonight and expect to run can cement casing tomorrow. |
1376594219 | 2013-08-12 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 13 3/8 surface casing set to 582 feet. The job was pumped as planned and 114.5 barrels of cement weighing 15.6ppg was pumped down hole. In total 32 barrels of good cement were returned to surface. They are going to drill their intermediate hole o roughly 1900 feet after they wait on cement. |
1425406829 | 2013-08-21 | Drill / Deepen / Reopen | No Violations | I was on location to check the status of the drilling of this well. Currently the rig has drilled the entire well and is tripping out with 1400 of drill pipe still to lay down. They expect to be cementing the 5.5 prioduction casing tommorrow afternoon. |
146895105 | 2013-7-29 0:00: | DD | No Violations | 4.00 |
1739192673 | 2017-03-01 | Production Wells | No Violations | I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The access road was equipped with a gate and was locked. The #12H well is in production and is equipped with an open flow assembly. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.
The equipment on the pad consists of the following: 4 producing wells 1 Low pressure vertical separator located inside of dike 4 sand separators 4 gas processing units 1 vapor recovery unit 1 heat treater 1 compressor station No violations were found during my inspection. |
1767972906 | 2013-08-22 | Casing String Witnessed | No Violations | I was onsite to witness the cementing of the 5.5 production casing for this well. The job was pumped as planned and mudpush was returned to surface as per the engineered plan. The pug was bumped at 2680psi and was held at 3480 psi. The floats did not hold and 4.5 barrels were bleed back to the truck. Another 1.5 barrels were pumped to hold the pressure to 3600 psi and again the floats did not hold. They are going to shut in the well and weight on cement for 12 hours before they attempt to bleed back the floats. Pressure will be monitored as to not overpressure the cement and equipment. |
2097752832 | 2013-07-29 | Administrative Inspection | No Violations | I was contacted by Chesapeake informing me that they are going to begin drilling the 10H and 12H conductors on this location. They stated that Express Energy is going to come in and drill both conductors to 120 feet and cement them the following day. |
490241873 | 2013-8-14 0:00: | DD | No Violations | 3.00 |
503010572 | 2013-7-30 0:00: | CS | No Violations | 5.00 |
739130372 | 2013-6-20 0:00: | ND | No Violations | 3.00 |
For data sources see[10]