34-019-22297

Well Details

Well ID: 34-019-22297
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Union Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000585
Farm/Lease Name: PUTNAM 34-13-5
License Status: Producing
License Date: 2013-04-08
Spud Date: 2013-04-26
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-05-09
Well Total Depth: 15660.00 ft
Configuration: Horizontal
Latitude: 40.530000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-01-09 8756 CHESAPEAKE EXPLORATION LLC Proposed Formation TRENTON-BLACK RIVER Issued Date 1/9/2013 Expired Date 1/9/2015 12:00:00 PM
APP 2013-01-17 Proposed Formations:TRENTON-BLACK RIVER, Issued Date:1/17/2013, Expired Date:1/17/2015 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2013-04-08 Proposed Formations:POINT PLEASANT, Issued Date:4/8/2013, Expired Date:4/8/2015 12:00:00 PM, Drilling unit acres:181.11, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-05-09
Correction to Well 2013-09-27 CHANGE IN TARGET & TAKE-POINT INFORMATION (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 171.11 ACRES.
Completion Report Received 2014-08-04
Construction Permit Expires 2015-04-08
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-08-04 8886 15449 0
8886 15449 0
8886 15449 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/26/2013 10/31/2013 7817 6,394,250.0 491554

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 PTLSI372 PERFORMANCE TECHNOLOGIES Scale Inhibitor No Hazardous Components NONE 0 0 0
PTLCS226 PERFORMANCE TECHNOLOGIES KCl Substitute No Hazardous Components NONE 0 0 0
PTLBW112 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00813 0
PTLAI171, PTLBW112, PTLCS226, PTLFR200, PTLGL240, PTLSI372 PERFORMANCE TECHNOLOGIES Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, KCl Substitute, Scale Inhibitor Petroleum Distillate Hydrotreated Light 064742-47-8 0 0.15705 0
Proprietary Clay TRADE SECRET 0 0.15705 0
Proprietary Aliphatic Alcohol TRADE SECRET 0 0.04622 0
Sodium Chloride 007647-14-5 0 0.04622 0
Proprietary Polycarboxylic Acid Polymer TRADE SECRET 0 0.01876 0
Proprietary Surfactant TRADE SECRET 0 0.15705 0
Choline Chloride 000067-48-1 0 0.09822 0
2-Ethylhexanol 000104-76-7 0 0.00077 0
Copper Sulfate 007758-98-7 0 0.00052 0
Water 007732-18-5 0 0.16397 0
Ethylene Glycol 000107-21-1 0 0.00098 0
Proprietary Methanol TRADE SECRET 0 0.00077 0
Diethylene Glycol 000111-46-6 0 0.00077 0
Proprietary Vinyl Copolymer TRADE SECRET 0 0.04999 0
Proprietary Oxyalkylated Fatty Acid Derivative TRADE SECRET 0 0.04622 0
Tetrasodium Ethylenediaminetetraacetate 000064-02-8 0 0.04622 0
Guar Gum 009000-30-0 0 0.15705 0
Proprietary Alkylene Oxide Block Polymer TRADE SECRET 0 0.00077 0
Proprietary Substituted Fatty Acid Ester TRADE SECRET 0 0.04622 0
PTLAI171 PERFORMANCE TECHNOLOGIES Corrosion Inhibitor Proprietary Organic Amine Resin Salt TRADE SECRET 30 0.00057 0
Proprietary Quaternary Ammonium Compound TRADE SECRET 10 0.00019 0
Ethylene Glycol 000107-21-1 30 0.00057 0
Isopropanol (Isopropyl Alcohol, Propan-2-ol) 000067-63-0 60 0.00113 0
Proprietary Aromatic Aldehyde TRADE SECRET 10 0.00019 0
Dimethyl Formamide 000068-12-2 10 0.00019 0
PTLMP136 PERFORMANCE TECHNOLOGIES Acid Water 007732-18-5 85 0.95777 0
Hydrochloric Acid 007647-01-0 15 0.16902 0
PTLFR200 PERFORMANCE TECHNOLOGIES Friction Reducer Proprietary Oxyalkylated Alcohol TRADE SECRET 5 0.00224 0
Proprietary Aliphatic Hydrocarbon TRADE SECRET 30 0.01343 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 5.67107 0
PTLBW102 PERFORMANCE TECHNOLOGIES Breaker Ammonium Persulfate 007727-54-0 100 0.00124 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 100 79.0527 0
EC6111A NALCO Anti-Bacterial Agent Water 007732-18-5 0 0.02599 0
Glutaraldehyde (Pentanediol) 000111-30-8 30 0.00747 0
PTLCA102 PERFORMANCE TECHNOLOGIES Cross Linker Proprietary Inorganic Salt TRADE SECRET 30 0.00558 0
Sodium Hydroxide 001310-73-2 60 0.01117 0
Proprietary Alkyl Alcohol TRADE SECRET 60 0.01117 0
100 Mesh Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 1.42207 0
Northern White Sand PERFORMANCE TECHNOLOGIES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 100 12.3911 0
PTLIS352 PERFORMANCE TECHNOLOGIES Iron Control Agent Citric Acid 000077-92-9 100 0.00057 0
PTLGL240 PERFORMANCE TECHNOLOGIES Gelling Agent No Hazardous Components NONE 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC 536446 55189 333
2015 CHESAPEAKE EXPLORATION LLC 363641 24134 359
2016 CHESAPEAKE EXPLORATION LLC 260409 18813 366
2017 CHESAPEAKE EXPLORATION LLC 210777 13315 365
2018 CHESAPEAKE EXPLORATION LLC 174783 9732 365
2019 CHESAPEAKE EXPLORATION LLC 39304 2267 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 CHESAPEAKE EXPLORATION LLC Brine 12531 333
2015 CHESAPEAKE EXPLORATION LLC Brine 5126 359
2016 CHESAPEAKE EXPLORATION LLC Brine 2460 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1962 365
2018 CHESAPEAKE EXPLORATION LLC Brine 1443 365
2019 CHESAPEAKE EXPLORATION LLC Brine 261 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1882311438 2013-4-29 0:00: DD No Violations 2.50
-2046779590 2015-1-14 0:00: PW No Violations
-898444843 2013-7-12 0:00: DD No Violations 2.50
-919562561 2017-8-2 0:00:0 PW No Violations
0429085438 2013-03-28 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 20 conductor casing. My inspection revealed that Precision Rathole has drilled a 26 hole to a depth of 16 and finished drilling a 24 hole to a total depth of 110. They ran 115 of 20 conductor (inside diameter 19.124) and had to cut off approximately 5 of the conductor casing. O-TEX cemented 110 of 20 conductor with 200 sacks of Class A 2% CaCl, 1/2 pound per sack cello-flake, and 0.4% C-41P. The cement had a density of 15.6 pounds per gallon, a yield of 1.18 cubic feet per sack, and they used 5.24 gallons per sack mix water. O-TEX pumped 42.03 barrels of cement slurry and displaced the cement with 35 barrels of freshwater. There was good circulation throughout the job and approximately 10 barrels of cement was circulated to surface. My inspection revealed no violations at this time.
0719148652 2013-05-08 Drill / Deepen / Reopen No Violations I was onsite to check the drilling of Nomac 72 in their 8.5 lateral. They are currently at 14,850 of a estimated 15,600 total depth. They expect to TD the well tonight/tomorrow mourning and the cement job could likely be Saturday. We also discussed the setting of the Intermediate casings in regards to the requirements of the permit. They had a question of exactly what approx 1950 on the permit meant and if they felt that the casing would be better set 5 feet short of that depth if they could set it at that depth if it was in 100% shale.
0898444843 2013-07-12 Drill / Deepen / Reopen No Violations I was onsite to check the erosion controls of this wellsite following strong storms that made it through the region the previous week. There were no issues on the pad and all erosion controls are working properly. The wells on this site are currently shut-in as they are waiting for the completions crew to come and hydraulically fracture the wells. All the six wells have well caps on them and the cellars are watertight as they have not been pumped out since the rains came through. There are no violations at this time.
0919562561 2017-08-02 Production Wells No Violations I conducted a status check of this well. Identification signs were posted at the access road entrance, the well, and the storage tanks. The #1H well is in production and is equipped with a plunger lift unit. The production tanks are surrounded by a steel dike. The pad is surrounded by a fence and all man doors were locked.

The equipment on the pad consisted of the following: 6 producing wells

1 Low pressure vertical separator 6 sand separators 6 gas processing units 1 combustor unit The lease road was stable. No violations were noted at the time of inspection.

0969767437 2013-07-03 Drill / Deepen / Reopen No Violations I was onsite to update the GPS coordinates for this wells as well as check the annulus pressure of these 6 wells drilled by Nomac 72. It is unsure when the wells be hydraulically fractured at this time. Currently there was a vacuum truck on location sucking water off the pad. There was also a Stonebridge crew onsite removing the rig containment that was leftover. All the wells were checked and none showed any signs of pressures on the wells. The wells are currently static and there are no violations at this time.
1067684682 2013-05-12 Drill / Deepen / Reopen No Violations I was onsite to witness the cementing of the surface for the Putnam 5H well. While waiting on a broken down Schlumberger pump truck I checked the status of the 1H well. The well is currently capped and grated over in the cellar of Nomac 72. The cellar is full of water and the well appears to be static at this time.
1206773845 2013-04-30 Casing String Witnessed No Violations I was onsite to witness the cementing of the 9 5/8 intermediate string that was set to 1938 feet. There were complete returns throughout the entire job and no issues seen. The cement was weighed at 15.7ppg before it was pumped down hole. A total of 20 barrels of good cement were returned to surface and the cement was scaled at 15.3ppg. Nomac 72 will wait 8 hours before tripping back into the hole.
1367173994 2013-04-27 Casing String Witnessed No Violations I was onsite to witness the cementing of the 13 3/8 casing set at 605. There was some issue with the casing being able to be set on bottom, the rig continued to circulate and was able to get casing on bottom in order to pump the cement to plan. The cement was scaled at 15.7ppg before it was pumped down hole. In total 20 barrels of good cement was returned to surface. The cement returned to surface was scaled with 5 barrels left of displacement and it weighed 15.4ppg. The plug held 500psi above bump pressure for 5 minutes and no flow back was seen on the cement truck.
1368411917 2013-05-10 Casing String Witnessed No Violations I was onsite to witness the 5.5 production string set at 15700 be cemented. The casing was reciprocated and rotated throughout the job. The job was cementing according to plan. The floats held and 3 barrels were returned to the pump truck. Nomac 72 will immediately skid the rig the Putnam 5H well.
1481774144 2013-08-19 Production Wells No Violations
1637285884 2015-07-01 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1882311438 2013-04-29 Drill / Deepen / Reopen No Violations I was onsite to check the status of Nomac 72 drilling their 12.5 hole. They are currently at 1375 and are slide drilling. They have started taking on about 200 barrels of water per hour from the point they hit the base of the Big Injun and the Berea Sandstone. They are ordering 4 more frac tanks on location to handle the influx of water. They expect to TD the hole tonight and cement tomorrow mourning.
1981866570 2013-08-12 Production Wells No Violations I was onsite to check for the possibility of runoff from the drilling pad running into a local residence pond. The property and the ponds were not clearly identified in the report and I checked some in the area. The ponds appear to have no issues and the pad is currently dry and does not show any signs of substantial runoff. A clearing has been made near the pad for what looks like a pipeline right away. An inspection will occur more thoroughly when more information is received.
2046779590 2015-01-14 Production Wells No Violations I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. Lightening protection is installed on top of the production tanks. The well is properly identified with a clear, legibly marked well identification sign. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. The lease road is stable and drivable. No violations found.

2118218996 2018-11-01 Production Wells No Violations The well was equipped with a plunger-lift assembly. The surface/intermediate annular gauge displayed zero psi, and the intermediate/production annular gauge displayed 190 psi. I performed a walk-around inspection of the pad and erosional controls appeared functioning. No violations were observed at the time of inspection.
429085438 2013-3-28 0:00: DD No Violations 2.00
719148652 2013-5-8 0:00:0 DD No Violations 2.50
969767437 2013-7-3 0:00:0 DD No Violations 3.00

For data sources see[9]

References