34-019-22285

Well Details

Well ID: 34-019-22285
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: PENNENERGY RESOURCES LLC
Well Pad ID: US-OH-000578
Farm/Lease Name: BRACE WEST
License Status: Producing
License Date: 2012-12-07
Spud Date: 2013-01-08
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2013-02-21
Well Total Depth: 12425.00 ft
Configuration: Horizontal
Latitude: 40.630000
Longitude: -81.050000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-12-07 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/7/2012, Expired Date:12/7/2014 12:00:00 PM, Drilling unit acres:208.91, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-02-21
Correction to Well 2013-05-03 CORRECTION TO TARGET INFORMATION (FOOTAGE & X, Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 210.16 ACRES.
Completion Report Received 2013-08-02
Construction Permit Expires 2014-12-07
Correction to Well 2015-01-23 UPDATE TO TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM NEWLY SUBMITTED PLAT. UNIT SIZE INCREASED.
Change of Owner 2018-10-03 Operator changed from 8894, R E GAS DEVELOPMENT LLC to 10212, PENNENERGY RESOURCES LLC
Record Last Modified 2018-10-03

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-04-30 H2O 8 8140 Bbl 277925 Frac Tech Services STAGE 5

60 SHOTS

2013-05-07 H2O 8 5955 Bbl 264530 Frac Tech Services STAGE 23

60 SHOTS

2013-05-02 H2O 8 5970 Bbl 255655 Frac Tech Services STAGE 11

60 SHOTS

2013-05-06 H2O 8 5861 Bbl 256757 Frac Tech Services STAGE 21

60 SHOTS

2013-05-08 H2O 8 5957 Bbl 260915 Frac Tech Services STAGE 27

60 SHOTS

2013-05-03 H2O 8 5940 Bbl 255270 Frac Tech Services STAGE 14

60 SHOTS

2013-05-05 H2O 8 5825 Bbl 249795 Frac Tech Services STAGE 18

60 SHOTS

2013-05-05 H2O 8 5957 Bbl 268212 Frac Tech Services STAGE 17

60 SHOTS

2013-05-04 H2O 8 6738 Bbl 256776 Frac Tech Services STAGE 15

60 SHOTS

2013-05-03 H2O 8 258458 Bbl 258458 Frac Tech Services STAGE 13

60 SHOTS

2013-05-01 H2O 8 5877 Bbl 239369 Frac Tech Services STAGE 7

60 SHOTS

2013-05-07 H2O 8 5819 Bbl 256757 Frac Tech Services STAGE 22

60 SHOTS

2013-05-05 H2O 8 5917 Bbl 256872 Frac Tech Services STAGE 19

60 SHOTS

2013-05-01 H2O 8 5940 Bbl 235971 Frac Tech Services STAGE 6

60 SHOTS

2013-05-08 H2O 8 6539 Bbl 255906 Frac Tech Services STAGE 26

60 SHOTS

2013-04-30 H2O 8 5942 Bbl 253555 Frac Tech Services STAGE 4

60 SHOTS

2013-05-02 H2O 8 5988 Bbl 252042 Frac Tech Services STAGE 10

60 SHOTS

2013-05-09 H2O 8 5843 Bbl 257870 Frac Tech Services STAGE 28

60 SHOTS

2013-05-09 H2O 8 6115 Bbl 269508 Frac Tech Services STAGE 30

60 SHOTS

2013-05-03 H2O 8 5959 Bbl 248399 Frac Tech Services STAGE 12

60 SHOTS

2013-05-04 H2O 8 6563 Bbl 259235 Frac Tech Services STAGE 16

60 SHOTS

2013-05-09 H2O 8 6178 Bbl 279145 Frac Tech Services STAGE 29

60 SHOTS

2013-04-29 H2O 8 8378 Bbl 265735 Frac Tech Services STAGE 2

60 SHOTS

2013-05-01 H2O 8 6422 Bbl 255086 Frac Tech Services STAGE 8

60 SHOTS

H2O 0 0 0
2013-05-06 H2O 8 5849 Bbl 256557 Frac Tech Services STAGE 20

60 SHOTS

2013-04-25 H2O 8 5880 Bbl 271953 Frac Tech Services STAGE 1

60 SHOTS

2013-05-02 H2O 8 6180 Bbl 261818 Frac Tech Services STAGE 9

60 SHOTS

2013-05-08 H2O 8 5544 Bbl 212285 Frac Tech Services STAGE 25

60 SHOTS

2013-04-29 H2O 8 7862 Bbl 251528 Frac Tech Services STAGE 3

60 SHOTS

2013-05-07 H2O 8 6239 Bbl 258710 Frac Tech Services STAGE 24

60 SHOTS

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 R E GAS DEVELOPMENT LLC 347856 29626 166
2014 R E GAS DEVELOPMENT LLC 392153 15223 365
2015 R E GAS DEVELOPMENT LLC 231398 4795 363
2016 R E GAS DEVELOPMENT LLC 168021 3079 360
2017 R E GAS DEVELOPMENT LLC 107984 2571 283
2018 PENNENERGY RESOURCES LLC 122652 18425 193
2019 PENNENERGY RESOURCES LLC 31450 556 68

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 R E GAS DEVELOPMENT LLC Brine 11963 166
2014 R E GAS DEVELOPMENT LLC Brine 3415 365
2015 R E GAS DEVELOPMENT LLC Brine 2655 363
2016 R E GAS DEVELOPMENT LLC Brine 1599 360
2017 R E GAS DEVELOPMENT LLC Brine 1842 283
2018 PENNENERGY RESOURCES LLC Brine 1423 193
2019 PENNENERGY RESOURCES LLC Brine 307 68

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1060494279 2013-7-15 0:00: PW No Violations 2.00
-10623497 2013-5-8 0:00:0 DD No Violations 4.00
-568105335 2013-6-12 0:00: PW No Violations 2.00
-732827886 2013-4-15 0:00: DD No Violations 3.00
0010623497 2013-05-08 Drill / Deepen / Reopen No Violations I was onsite to witness the fracking of this well and check the pressures of the annular spaces. They are currently fracking the 2H well and are on the 47th of 54 stages for this 2 well pad. This well currently has 240 psi of pressure on the 13 3/8 and 9 5/8 annular space and has not been building pressure. They expect to be done fracking these wells Friday and will spend several days prepping the well before giving it a rest period.
0128166585 2013-04-11 Drill / Deepen / Reopen No Violations I was onsite to check the status of the drilling pad following the removal of the rig and drilling equipment. New containment has been put down around the 2 wells and the wells are capped and surrounded by steel fencing. 8 frac tanks are on location with new containment as well. The erosion controls are holding up well following a series of strong thunderstorms that moved through the area the previous night. The wells are expected to by hydraulically fractured starting 4-29-2013 but before they can be a possible leaking wellhead needs to be addressed. One of the well cellars is full of water and the submerged wellhead is bubbling gas, the other wellhead has a noticeable hiss of leaking gas/air. I have contacted Regional Supervisor Tom Hill and Rex Energy. Rex is having a senior completions manager check the location to determine what the cause of the bubbling is. A Rex safety man told me that the bubbling can be leaking air that is trapped in the well annulus. I informed Rex to have the cellars pumped empty, the leaks identified and pressure gauges placed on the wellheads to determine what kind of pressures are currently on the annuli to determine what the possible issues are. My gas meter showed no signs of dangerous gas when sampled.
0568105335 2013-06-12 Production Wells No Violations I was onsite to check the status of these wells being put into production. The production facilities are complete and the wells, with complete wellheads, are being welded into the flow lines. The wells should be in production soon.
0732827886 2013-04-15 Drill / Deepen / Reopen No Violations I was onsite to check back with the status of the leaking wells on the pad location. A senior well tender checked the site and is still stating that the bubbling is trapped air stuck in the annulus of the casing strings. Rex informed me that they are going to bring out the wellhead company to tighten down the bolts and wellhead. I let them know that they need to vent the air and then install pressure gauges on the annulus to monitor the wells before they can be prepared to be hydraulically fractured. An additional gas meter reading still showed no signs of any methane or explosive/dangerous gases.
1060494279 2013-07-15 Production Wells No Violations I was onsite to check the erosion controls of this wellsite following strong storms that made it through the region the previous week. There were no issues on the pad and all erosion controls are working properly. The wells on this site are currently not producing as they are waiting for the completion of the production facilities for the two wells. A crew is onsite production testing the wells with a flair stack set up. Rex gave these wells a shut in period to allow for supposed increased production.
1112722451 2018-06-21 Production Wells No Violations I conducted a status check of the well and production pad. The pad is equipped with two producing wells (permit numbers 22285 & 22284). This well is equipped a plunger-lift assembly. Identification was posted at the well and lease entrance. The production tanks, gas processing units, and separators were surrounded by a steel dike and was lined. Some areas inside of the dike contained less than on inch of standing water. I tested the standing water for chlorides using a low--around of the pad perimeter and erosion controls are in place and properly functioning.

Equipment on the pad consisted of the following:



-pressure separator tower


The well was equipped with pressure relief valves on the surface-intermediate, and intermediate-production annuli. I did not locate a surface-intermediate annular pressure gauge. I contacted operator who stated they in the process of acquiring gauges from the supplier, and an annular gauge will be installed as soon as possible.

1281625585 2013-04-22 Drill / Deepen / Reopen No Violations I was onsite to check the wellhead annular pressures to determine whether or not the well is static and that the casings are not building pressures before the wells are to be hydraulically fractured. Currently both wells are showing 0 psi on the casing annular spaces. Canary wellhead services is onsite assembling the wellheads for the frac operations that are to start in roughly on week. The wells will be continued to be monitored.
128166585 2013-4-11 0:00: DD No Violations 4.50
1334220288 2013-05-14 Drill / Deepen / Reopen No Violations I was onsite to check the status of the competitions of these 2 wells on the location. They have completed the hydraulic fracturing of both wells and are currently drilling out the plugs in the 1H well. They completed all 54 stages while keeping the injection pressures below 10,000psi to ensure the possible issues with the cementing to not be an issue. They will continue to drill out the plugs on both wells and let them have a resting period before putting the wells into production. They estimate to be on location until at least Saturday.
1367247837 2013-04-24 Drill / Deepen / Reopen No Violations I was on location to talk with the Rex Energy company man regarding the upcoming hydraulic fracturing of the Brace West wells. The annulus pressures are currently reading 0psi and are being monitored. Coiled tubing is being run into the wells at this time in preparation. The well annulus pressures are going to be electronically monitored throughout the fracking as a precaution. I am going to be onsite Monday to witness portions of the frack job.
1431158918 2013-04-29 Drill / Deepen / Reopen No Violations I was onsite to witness the beginning of the hydraulic fracturing for both the Brace West 1H and 2H wells. FracTec is on location and preparing to frac the wells. Currently sand is being hauled on location as well as the chemicals for the frac job. The annular pressures of the wells are going to be constantly monitored during the job to ensure well integrity. A recent gas transmission line has also been installed on location for full production when the wells are completed.
1536476484 2013-04-17 Drill / Deepen / Reopen No Violations I was onsite with supervisor Tom Hill and inspector Brett Farnsworth to evaluate the situation of the leaking well heads at this location. The wellhead bolts have been tightened down again and the cellar has been pumped down. A well tender will be on location tomorrow at 9am to installed pressure gauges to monitor the wellhead pressures to see if the gas is from a formation or compressed air from thermal expansion.
1675301319 2020-4-2 0:00:0 PL No Violations 1.00

For data sources see[8]