34-019-22153

Well Details

Well ID: 34-019-22153
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000374
Farm/Lease Name: NEIDER 10-14-5
License Status: Producing
License Date: 2012-05-10
Spud Date: 2012-05-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-08-01
Well Total Depth: 13155.00 ft
Configuration: Horizontal
Latitude: 40.600000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-05-03 Proposed Formations:POINT PLEASANT, Issued Date:5/3/2012, Expired Date:5/3/2014 12:00:00 PM, Drilling unit acres:161.2, Proposed Well Type:OG, Proposed Well Class:EOUT
APP 2012-05-10 Proposed Formations:POINT PLEASANT, Issued Date:5/10/2012, Expired Date:5/10/2014 12:00:00 PM, Drilling unit acres:161.2, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-08-01
Correction to Well 2012-12-14 CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY.
Completion Report Received 2013-02-05
Construction Permit Expires 2014-05-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-02-14 9956 10510 40
2013-02-14 9324 9878 40
12484 13038 40
11852 12406 40
11220 11774 40
10588 11142 40
9956 10510 40
9324 9878 40
8692 9246 40
8692 9246 40
2013-02-14 8692 9246 40
2013-02-14 10588 11142 40
2013-02-14 12484 13038 40
2013-02-14 11852 12406 40
2013-02-14 11220 11774 40

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/08/2012 09/08/2012 7755.00 3,435,180.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SCALETROL 720 Baker Hughes Scale Inhibitor Diethylene glycol 111-46-6 5.00 0.00071000
Ethylene glycol 107-21-1 35.00 0.00498000
BF-9L, CI-14, ENZYME G-NE, FERROTROL

300L, FRW-18, GW-3LDF, SCALETROL 720

Baker Hughes Breaker, Corrosion Inhibitor, Friction Reducer, Gelling Agent, Iron Control Agent, pH Adjusting Agent, Scale Inhibitor Proprietary Copolymer
Proprietary Silica
Proprietary Disinfectant
Hemicellulase Enzyme Concentrate 9025-56-3
Proprietary Acid
Proprietary Polymer
Proprietary Solvent
Proprietary Biocide
Proprietary Alcohol
Proprietary Weak Acid
Water 7732-18-5
Calcium chloride 10043-52-4
Proprietary Surfactant
ALPHA 1427 Baker Hughes Antibacterial Agent Water 7732-18-5 60.00 0.00779000
Glutaraldehyde 111-30-8 30.00 0.00390000
Didecyl dimethyl ammonium chloride 7173-51-5 10.00 0.00130000
Ethanol 64-17-5 5.00 0.00065000
XLW-32 Baker Hughes Crosslinker Methanol 67-56-1 90.00 0.00607000
Boric acid 10043-35-3 20.00 0.00135000
Hydrochloric Acid 10.1-15 Baker Hughes Acid Hydrochloric acid 7647-01-0 15.00 0.08
Water 7732-18-5 85.00 0.46
GW-3LDF Baker Hughes Gelling Agent Polysaccharide Blend 60.00 0.10
Petroleum Distillate Blend 60.00 0.10
GBW-5 Baker Hughes Breaker Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.00039000
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.00813000
BF-9L Baker Hughes pH Adjusting Agent Potassium hydroxide 1310-58-3 15.00 0.00165000
CI-14 Baker Hughes Corrosion Inhibitor Propargyl alcohol 107-19-7 5.00 0.00007000
Methanol 67-56-1 68.00 0.00100000
ENZYME G-NE Baker Hughes Breaker No Hazardous Components 0.00
100 Mesh Sand Baker Hughes Proppant - Natural Quartz 14808-60-7 100.00 2.83
Fresh Water Carrier/Base Fluid 75.65
Recycled Produced Water Carrier/Base Fluid 7.90
ClayCare Baker Hughes Clay Stabilizer Water 7732-18-5 30.00 0.02
Choline chloride 67-48-1 75.00 0.05
FERROTROL 300L Baker Hughes Iron Control Agent Citric acid 77-92-9 50.00 0.00224000
Northern White Sand Baker Hughes Proppant - Natural Quartz 14808-60-7 100.00 12.68
Additional Ingredients Not Listed on MSDS

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-09-10 H2O 15 10102 Bbl 777643 BAKER-HUGHES STAGE 4
2012-09-12 H2O 15 10536 Bbl 766928 BAKER-HUGHES STAGE 5
2012-09-09 H2O 15 10885 Bbl 765039 BAKER-HUGHES STAGE 2
2012-09-10 H2O 15 10827 Bbl 764367 BAKER-HUGHES STAGE 3
2012-09-13 H2O 15 9200 Bbl 766887 BAKER-HUGHES STAGE 7
2012-09-12 H2O 15 10510 Bbl 766928 BAKER-HUGHES STAGE 6
2012-09-08 H2O 15 9804 Bbl 765041 BAKER-HUGHES STAGE 1

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 CHESAPEAKE EXPLORATION LLC 18875.00 490.00 13
2013 CHESAPEAKE EXPLORATION LLC 172325 3679 316
2014 CHESAPEAKE EXPLORATION LLC 119737 2340 313
2015 CHESAPEAKE EXPLORATION LLC 126709 2246 363
2016 CHESAPEAKE EXPLORATION LLC 93227 1590 366
2017 CHESAPEAKE EXPLORATION LLC 80741 971 273
2018 CHESAPEAKE EXPLORATION LLC 74503 699 365
2019 CHESAPEAKE EXPLORATION LLC 15320 175 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 CHESAPEAKE EXPLORATION LLC Brine 4892 13
2013 CHESAPEAKE EXPLORATION LLC Brine 6633 316
2014 CHESAPEAKE EXPLORATION LLC Brine 2471 313
2015 CHESAPEAKE EXPLORATION LLC Brine 1187 363
2016 CHESAPEAKE EXPLORATION LLC Brine 1264 366
2017 CHESAPEAKE EXPLORATION LLC Brine 1486 273
2018 CHESAPEAKE EXPLORATION LLC Brine 1213 365
2019 CHESAPEAKE EXPLORATION LLC Brine 159 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-408185645 2017-9-6 0:00:0 PW No Violations
0408185645 2017-09-06 Production Wells No Violations

The equipment on the pad consists of the following: 8 - 400 bbl production tanks, four labelled as containing produced water, and four labelled as containing condensate. 6 Producing wells 6 Sand separators 6 Gas processing units 1 Combustor unit

0633294345 2015-09-16 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:


Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

1283478691 2015-01-15 Production Wells No Violations I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. Lightening protection is installed on top of the production tanks. The well is properly identified with a clear, legibly marked well identification sign. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. The lease road is stable and drivable. No violations found.

1385788370 2012-07-20 Drill / Deepen / Reopen No Violations I was on site to witness the cementing of the 13 3/8 surface casing. I received a phone call from the Larry Kidd (Rig Consultant) at 11:06 pm (7/19/12) and he advised that they should be finished running the 13 3/8 surface casing around 6:00am tomorrow morning (7/20/12) and O-Tex Pumping should be on site at that time (6:00am). I arrived on site at 6:45am and observed that Patterson Rig # 328 and Wyoming Casing Crew was still running the 13 3/8 surfce casing. O-TEX Pumping was on site and in the process of moving trucks and rigging up to cement. Patterson Rig 328 crew and Wyoming Casing finished running the 13 3/8 surface casing and rigged down the casing crew . O-TEX rigged up the cement trucks and installed the cement head on the casing . A safety meeting was held and then they started the cement job . O-TEX Pumping cemented the 485 of 13 3/8 casing with 450 sacks of Class H cement (2% CaCl , .27% Cello Flake,and .4% C-41P defoamer ; 15.6 pounds per gallon density and a yield of 1.18 cubic feet per sack). There was good circulation throughout the job and approximately 35 barrels of cement returns to surface. Bumped plug at 11:19 am and floats held.
1475117427 2016-02-22 Production Wells No Violations I conducted a status check inspection of this Utica Shale well pad. My inspection found the lease road gate present and locked. The lease road and apron are in good repair. The pad is fenced and the entrance gate and all man doors on the perimeter of the pad were locked. The #1H well is in production, equipped with a plunger lift system, and the gauge on the 2.875 tubing indicates a pressure of 338psi. The 5.5production casing wing valve indicates a pressure of 115psi. The well is choked back and producing at a pressure 211psi to the surface production equipment. Well #s 3H (PN# 22075), 5H (PN# 22151), 6H (PN# 22123), 8H (PN# 22124)and 10H (PN# 22125) are also in production and producing with the aid of plunger lift systems. The proper IDs are posted at the entrance and at the wellheads and tank battery. There is a one (1) acre, freshwater impoundment located to the north of the pad. The impoundment is lined, fenced, locked and identified. The pad and impoundment area are equipped with video surveillance.

The equipment on the pad consists of the following:

8-400bbl storage tanks (4 water, 4 oil/condensate) 6 Producing wells 6 Sand separators

2 Thermo-electric desiccators with a vertical drip bottle 1 Self-contained, 350 gallon, methanol tank containing Assure HI-18FB hydrate inhibitor 1 Combustor with inline pressure tank and air compressor

192662449 2019-9-3 0:00:0 PW No Violations 1.50
633294345 2015-9-16 0:00: PL No Violations

For data sources see[10]

References