X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22104

Well Details

Well ID: 34-019-22104
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: East Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000412
Farm/Lease Name: BUCEY 21-14-4
License Status: Producing
License Date: 2011-12-06
Spud Date: 2011-12-28
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2012-01-13
Well Total Depth: 12521.00 ft
Configuration: Horizontal
Latitude: 40.680000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-12-06 Proposed Formations:POINT PLEASANT, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:128.1, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2012-01-13
Completion Report Received 2012-03-14
Correction to Well 2012-04-20 CORRECTION TO TARGET INFORMATION; FOOTAGE AND X,Y COORDINATES. FROM AS DRILLED SURVEY.
Correction to Well 2012-09-07 CORRECTION TO TARGET INFORMATION: FOOTAGE AND X,Y COORDINATES, FROM AS DRILLED SURVEY.
Construction Permit Expires 2013-12-05
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2012-09-20 9599 10099 32
2012-09-20 9031 9530 32
11306 11805 32
10737 11237 32
9599 10099 32
9031 9530 32
8462 8962 32
11874 12374 32
8462 8962 32
2012-09-20 8462 8962 32
2012-09-20 10168 10668 32
2012-09-20 11874 12374 32
2012-09-20 11306 11805 32
2012-09-20 10737 11237 32

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/08/2012 03/08/2012 7912.00 3,180,702.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 BF-9L Baker Hughes pH Adjusting Agent Potassium hydroxide 1310-58-3 15.00 0.00126000
NE-900 Baker Hughes Non-Emulsifier Nonyl phenol ethoxylate 9016-45-9 10.00 0.00005000
Methanol 67-56-1 30.00 0.00016000
100 Mesh Sand Proppant Quartz 14808-60-7 100.00 2.92
ALPHA 1427 Baker Hughes Antibacterial Agent Glutaraldehyde 111-30-8 30.00 0.00445000
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 7.00 0.00104000
Ethanol 64-17-5 5.00 0.00074000
Water 7732-18-5 60.00 0.00890000
Ottawa Sand Proppant Quartz 14808-60-7 100.00 13.11
FRW-18 Baker Hughes Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.00866000
CI-14 Baker Hughes Corrosion Inhibitor Methanol 67-56-1 68.00 0.00130000
Propargyl alcohol 107-19-7 5.00 0.00010000
SCALETROL 720 Baker Hughes Scale Inhibitor Ethylene glycol 107-21-1 35.00 0.00489000
Diethylene glycol 111-46-6 5.00 0.00070000
XLW-32 Baker Hughes Crosslinker Boric acid 10043-35-3 20.00 0.00156000
Methanol 67-56-1 90.00 0.00701000
ClayCare Baker Hughes Clay Stabilizer Choline chloride 67-48-1 75.00 0.05
Water 7732-18-5 30.00 0.02
FERROTROL 300L Baker Hughes Iron Control Agent Citric acid 77-92-9 50.00 0.00198000
Fresh Water Carrier/Base Fluid 83.11
Hydrochloric Acid 10.1-15 Baker Hughes Acid Hydrochloric acid 7647-01-0 15.00 0.06
Water 7732-18-5 85.00 0.35
GW-3LDF Baker Hughes Gelling Agent Petroleum Distillate Blend 60.00 0.15
Polysaccharide Blend 60.00 0.15
ENZYME G-NE Baker Hughes Breaker No Hazardous Components 0.00

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2012-03-10 H2O 0 10901 Bbl 730552 BAKER-HUGHES STAGE 3
2012-03-08 H2O 0 10690 Bbl 896503 BAKER-HUGHES STAGE 1
2012-03-14 H2O 0 10793 Bbl 738970 BAKER-HUGHES STAGE 6
2012-03-15 H2O 0 9705 Bbl 733951 BAKER-HUGHES STAGE 7
2012-03-09 H2O 0 8680 Bbl 728676 BAKER-HUGHES STAGE 2
2012-03-11 H2O 0 9871 Bbl 730973 BAKER-HUGHES STAGE 5
2012-03-11 H2O 0 11205 Bbl 733458 BAKER-HUGHES STAGE 4

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2012 CHESAPEAKE EXPLORATION LLC 212812.00 1409.00 166
2013 CHESAPEAKE EXPLORATION LLC 291916 949 320
2014 CHESAPEAKE EXPLORATION LLC 150078 367 243
2015 CHESAPEAKE EXPLORATION LLC 203200 436 355
2016 CHESAPEAKE EXPLORATION LLC 172344 175 366
2017 CHESAPEAKE EXPLORATION LLC 141631 78 361
2018 CHESAPEAKE EXPLORATION LLC 128054 69 364
2019 CHESAPEAKE EXPLORATION LLC 29089 69 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2012 CHESAPEAKE EXPLORATION LLC Brine 6127 166
2013 CHESAPEAKE EXPLORATION LLC Brine 3351 320
2014 CHESAPEAKE EXPLORATION LLC Brine 3705 243
2015 CHESAPEAKE EXPLORATION LLC Brine 6499 355
2016 CHESAPEAKE EXPLORATION LLC Brine 5215 366
2017 CHESAPEAKE EXPLORATION LLC Brine 2359 361
2018 CHESAPEAKE EXPLORATION LLC Brine 1427 364
2019 CHESAPEAKE EXPLORATION LLC Brine 509 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1868422072 2015-12-10 0:00 PL No Violations
-928029491 2016-2-22 0:00: PW No Violations 0.30
0561420052 2012-06-25 Preliminary Restoration No Violations My inspection revealed that the Preliminary Restoration can be approved. All the erosion and sedimentation controls are functional and the vegetation is adequate to prevent substantial erosion and sedimentation.
0848631186 2014-04-28 Production Wells No Violations I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time.
0928029491 2016-02-22 Production Wells No Violations I was on location for a status check. My inspection found the access road gate is locked and the access road is in good repair. Identification signs are posted at the access road entrance, well and storage tanks. The pad is fenced and all man doors were locked. The #6H is in production. The well is equipped with a plunger lift assembly. There are two steel dikes. One contains six storage tanks and the other contains two storage tanks.

The equipment on the pad consists of the following: 8 Storage tanks 3 Sand separators 3 Gas processing units (GPU) 2 Vertical separators 1 Vapor recovery unit (VRU) 4 Production wells on the pad Site fenced and man doors locked

1868422072 2015-12-10 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a six-foot high, chain link fence with three-strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. The soil stockpile is well-stabilized with vegetation. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. On the outside of the well pad there was a enclosed, chain link fence with three strand barb containing two 400 BBL production tanks. The lease road is stable and drivable. Preliminary restoration passed.

561420052 2012-6-25 0:00: PL No Violations 0.50
848631186 2014-4-28 0:00: PW No Violations 1.00

For data sources see[10]

References