If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-019-22104 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.68,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Carroll | |
Municipality: East Township | |
Operator Name: EAP OHIO LLC | |
Well Pad ID: US-OH-000412 | |
Farm/Lease Name: BUCEY 21-14-4 | |
License Status: Producing | |
License Date: 2011-12-06 | |
Spud Date: 2011-12-28 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2012-01-13 | |
Well Total Depth: 12521.00 ft | |
Configuration: Horizontal | |
Latitude: 40.680000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-12-06 | Proposed Formations:POINT PLEASANT, Issued Date:12/6/2011, Expired Date:12/5/2013 12:00:00 PM, Drilling unit acres:128.1, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2012-01-13 | |
Completion Report Received | 2012-03-14 | |
Correction to Well | 2012-04-20 | CORRECTION TO TARGET INFORMATION; FOOTAGE AND X,Y COORDINATES. FROM AS DRILLED SURVEY. |
Correction to Well | 2012-09-07 | CORRECTION TO TARGET INFORMATION: FOOTAGE AND X,Y COORDINATES, FROM AS DRILLED SURVEY. |
Construction Permit Expires | 2013-12-05 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-09-20 | 9599 | 10099 | 32 |
2012-09-20 | 9031 | 9530 | 32 |
11306 | 11805 | 32 | |
10737 | 11237 | 32 | |
9599 | 10099 | 32 | |
9031 | 9530 | 32 | |
8462 | 8962 | 32 | |
11874 | 12374 | 32 | |
8462 | 8962 | 32 | |
2012-09-20 | 8462 | 8962 | 32 |
2012-09-20 | 10168 | 10668 | 32 |
2012-09-20 | 11874 | 12374 | 32 |
2012-09-20 | 11306 | 11805 | 32 |
2012-09-20 | 10737 | 11237 | 32 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 03/08/2012 | 03/08/2012 | 7912.00 | 3,180,702.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | BF-9L | Baker Hughes | pH Adjusting Agent | Potassium hydroxide | 1310-58-3 | 15.00 | 0.00126000 | |
NE-900 | Baker Hughes | Non-Emulsifier | Nonyl phenol ethoxylate | 9016-45-9 | 10.00 | 0.00005000 | ||
Methanol | 67-56-1 | 30.00 | 0.00016000 | |||||
100 Mesh Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 2.92 | |||
ALPHA 1427 | Baker Hughes | Antibacterial Agent | Glutaraldehyde | 111-30-8 | 30.00 | 0.00445000 | ||
Quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 7.00 | 0.00104000 | |||||
Ethanol | 64-17-5 | 5.00 | 0.00074000 | |||||
Water | 7732-18-5 | 60.00 | 0.00890000 | |||||
Ottawa Sand | Proppant | Quartz | 14808-60-7 | 100.00 | 13.11 | |||
FRW-18 | Baker Hughes | Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.00866000 | ||
CI-14 | Baker Hughes | Corrosion Inhibitor | Methanol | 67-56-1 | 68.00 | 0.00130000 | ||
Propargyl alcohol | 107-19-7 | 5.00 | 0.00010000 | |||||
SCALETROL 720 | Baker Hughes | Scale Inhibitor | Ethylene glycol | 107-21-1 | 35.00 | 0.00489000 | ||
Diethylene glycol | 111-46-6 | 5.00 | 0.00070000 | |||||
XLW-32 | Baker Hughes | Crosslinker | Boric acid | 10043-35-3 | 20.00 | 0.00156000 | ||
Methanol | 67-56-1 | 90.00 | 0.00701000 | |||||
ClayCare | Baker Hughes | Clay Stabilizer | Choline chloride | 67-48-1 | 75.00 | 0.05 | ||
Water | 7732-18-5 | 30.00 | 0.02 | |||||
FERROTROL 300L | Baker Hughes | Iron Control Agent | Citric acid | 77-92-9 | 50.00 | 0.00198000 | ||
Fresh Water | Carrier/Base Fluid | 83.11 | ||||||
Hydrochloric Acid 10.1-15 | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 15.00 | 0.06 | ||
Water | 7732-18-5 | 85.00 | 0.35 | |||||
GW-3LDF | Baker Hughes | Gelling Agent | Petroleum Distillate Blend | 60.00 | 0.15 | |||
Polysaccharide Blend | 60.00 | 0.15 | ||||||
ENZYME G-NE | Baker Hughes | Breaker | No Hazardous Components | 0.00 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-03-10 | H2O | 0 | 10901 Bbl | 730552 | BAKER-HUGHES | STAGE 3 |
2012-03-08 | H2O | 0 | 10690 Bbl | 896503 | BAKER-HUGHES | STAGE 1 |
2012-03-14 | H2O | 0 | 10793 Bbl | 738970 | BAKER-HUGHES | STAGE 6 |
2012-03-15 | H2O | 0 | 9705 Bbl | 733951 | BAKER-HUGHES | STAGE 7 |
2012-03-09 | H2O | 0 | 8680 Bbl | 728676 | BAKER-HUGHES | STAGE 2 |
2012-03-11 | H2O | 0 | 9871 Bbl | 730973 | BAKER-HUGHES | STAGE 5 |
2012-03-11 | H2O | 0 | 11205 Bbl | 733458 | BAKER-HUGHES | STAGE 4 |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | CHESAPEAKE EXPLORATION LLC | 212812.00 | 1409.00 | 166 |
2013 | CHESAPEAKE EXPLORATION LLC | 291916 | 949 | 320 |
2014 | CHESAPEAKE EXPLORATION LLC | 150078 | 367 | 243 |
2015 | CHESAPEAKE EXPLORATION LLC | 203200 | 436 | 355 |
2016 | CHESAPEAKE EXPLORATION LLC | 172344 | 175 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 141631 | 78 | 361 |
2018 | CHESAPEAKE EXPLORATION LLC | 128054 | 69 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | 29089 | 69 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | CHESAPEAKE EXPLORATION LLC | Brine | 6127 | 166 |
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 3351 | 320 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 3705 | 243 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 6499 | 355 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 5215 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 2359 | 361 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1427 | 364 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 509 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1868422072 | 2015-12-10 0:00 | PL | No Violations | |
-928029491 | 2016-2-22 0:00: | PW | No Violations | 0.30 |
0561420052 | 2012-06-25 | Preliminary Restoration | No Violations | My inspection revealed that the Preliminary Restoration can be approved. All the erosion and sedimentation controls are functional and the vegetation is adequate to prevent substantial erosion and sedimentation. |
0848631186 | 2014-04-28 | Production Wells | No Violations | I meet with the Federal EPA at this location. They performed an Air Quality Inspection of the well and tank battery. I performed a status check of the tank battery and well head. ID signs are posted. No violations were noted at this time. |
0928029491 | 2016-02-22 | Production Wells | No Violations | I was on location for a status check. My inspection found the access road gate is locked and the access road is in good repair. Identification signs are posted at the access road entrance, well and storage tanks. The pad is fenced and all man doors were locked. The #6H is in production. The well is equipped with a plunger lift assembly. There are two steel dikes. One contains six storage tanks and the other contains two storage tanks.
The equipment on the pad consists of the following: 8 Storage tanks 3 Sand separators 3 Gas processing units (GPU) 2 Vertical separators 1 Vapor recovery unit (VRU) 4 Production wells on the pad Site fenced and man doors locked |
1868422072 | 2015-12-10 | Preliminary Restoration | No Violations | I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly-marked well identification sign. The tank battery consisted of six, 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock are installed on top of the production tanks. Other production equipment on the well pad consisted of:
|
561420052 | 2012-6-25 0:00: | PL | No Violations | 0.50 |
848631186 | 2014-4-28 0:00: | PW | No Violations | 1.00 |
For data sources see[10]