X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-019-22075

Well Details

Well ID: 34-019-22075
Loading map...
Country: United States
State: Ohio
County: Carroll
Municipality: Washington Township
Operator Name: EAP OHIO LLC
Well Pad ID: US-OH-000374
Farm/Lease Name: NEIDER 10-14-5
License Status: Producing
License Date: 2011-08-11
Spud Date: 2011-04-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2011-05-16
Well Total Depth: 12503.00 ft
Configuration: Horizontal
Latitude: 40.600000
Longitude: -81.000000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-03-28 Proposed Formations:UTICA, Issued Date:3/28/2011, Expired Date:3/27/2013 12:00:00 PM, Drilling unit acres:175.8, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2011-05-16
APP 2011-08-11 Proposed Formations:POINT PLEASANT, Issued Date:8/11/2011, Expired Date:8/10/2013 12:00:00 PM, Drilling unit acres:175.8, Proposed Well Type:OG, Proposed Well Class:EDPW
Completion Report Received 2011-09-27
End of Confidential Data 2012-05-16
Correction to Well 2013-05-24 CORRECTION TO SURFACE & TARGET INFORMATON (FOOTAGE & X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 115.80 ACRES.
Construction Permit Expires 2013-08-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-11-21 9375 9627 60
2011-11-21 12075 12327 60
2011-11-21 11175 11427 60
2011-11-21 10275 10527 60
2011-11-21 10575 10827 60
2011-11-21 10875 11127 60
2011-11-21 9680 9927 60
12075 12327 60
11775 12027 60
11475 11727 60
11175 11427 60
10875 11127 60
10575 10827 60
10275 10527 60
9975 10227 60
9375 9627 60
9680 9927 60
9075 9327 60
8775 9027 60
8475 8727 60
8175 8427 60
8175 8427 60
2011-11-21 9975 10227 60
2011-11-21 9075 9327 60
2011-11-21 8175 8427 60
2011-11-21 8475 8727 60
2011-11-21 8775 9027 60
2011-11-21 11475 11727 60
2011-11-21 11775 12027 60

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 07/19/2011 07/19/2011 7775.00 5,738,166.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 WFR-61LA Weatherford Friction Reducer Ethoxylated C12-16 alcohols 68551-12-2 7.00 0.00768000
Sodium chloride 7647-14-5 10.00 0.01
Distillates, petroleum, hydrotreated light 64742-47-8 40.00 0.04
Ammonium chloride 12125-02-9 7.00 0.00768000
EC6110A Nalco Antibacterial Agent Glutaraldehyde 111-30-8 60.00 0.02
Ethanol 64-17-5 5.00 0.00183000
Quaternary Ammonium Compounds 10.00 0.00366000
ACID, HYDROCHLORIC, 15 PCT Weatherford Acid Water 7732-18-5 85.00 0.60
Hydrochloric acid 7647-01-0 15.00 0.10
Iron Control - WIC-641L Weatherford Iron Control Agent Citric acid 77-92-9 50.00 0.00400000
Inhibitor - WAI-251LC Weatherford Corrosion Inhibitor 1-Octanol 111-87-5 7.00 0.00011000
N,N-Dimethylformamide 68-12-2 30.00 0.00047000
2-Butoxyethanol 111-76-2 5.00 0.00008000
Ethylene glycol 107-21-1 40.00 0.00062000
Proprietary 13.00 0.00020000
Isopropanol 67-63-0 7.00 0.00011000
1-Decanol 112-30-1 7.00 0.00011000
Recycled Produced Water Carrier/Base Fluid 17.88
WGA-15L Weatherford Gelling Agent Proprietary Polymer 60.00 0.05
Distillates, petroleum, hydrotreated light 64742-47-8 60.00 0.05
pH Adjusting Agents - WPB-584L Weatherford pH Adjusting Agent Carbonic acid, dipotassium salt 584-08-7 60.00 0.00606000
Potassium hydroxide 1310-58-3 40.00 0.00404000
WXL-105L Weatherford Crosslinker Ethanolamine 141-43-5 10.00 0.00048000
Boric acid 10043-35-3 15.00 0.00072000
Water 7732-18-5 65.00 0.00312000
Ethylene glycol 107-21-1 35.00 0.00168000
WCS-631LC Weatherford Clay Stabilizer Proprietary Non Hazardous Salt 70.00 0.06
Water 7732-18-5 50.00 0.04
MC MX 664-5 Multi-Chem Group Surfactant Isopropanol 67-63-0 5.00 0.00407000
Sulfonate 30.00 0.02
Methanol 67-56-1 70.00 0.05
Fresh Water Carrier/Base Fluid 69.93
WBK-133, Breaker Weatherford Breaker Peroxydisulfuric acid, diammonium salt 7727-54-0 100.00 0.00170000
Sand (Proppant) Proppant 11.01
EC6629 (010) Nalco Scale Inhibitor No Hazardous Components 0.00

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2011-07-19 H2O 15 10820 Bbl 448000 Weatherford STAGE 2 OF 14
2011-07-22 H2O 15 9475 Bbl 453360 Weatherford STAGE 10 OF 14
2011-07-23 H2O 15 9248 Bbl 460820 Weatherford STAGE 13 OF 14
2011-07-20 H2O 15 11469 Bbl 446300 Weatherford STAGE 5 OF 14
2011-07-18 H2O 15 9689 Bbl 434840 Weatherford STAGE 1 OF 14
2011-07-21 H2O 15 9501 Bbl 441000 Weatherford STAGE 7 OF 14
2011-07-21 H2O 15 9354 Bbl 452260 Weatherford STAGE 8 OF 14
2011-07-20 H2O 15 9853 Bbl 450420 Weatherford STAGE 4 OF 14
2011-07-25 H2O 15 12778 Bbl 479660 Weatherford STAGE 14 OF 14
2011-07-19 H2O 15 9793 Bbl 419980 Weatherford STAGE 3 OF 14
2011-07-21 H2O 15 9169 Bbl 451400 Weatherford STAGE 9 OF 14
2011-07-22 H2O 15 12440 Bbl 454480 Weatherford STAGE 11 OF 14
2011-07-22 H2O 15 8517 Bbl 277880 Weatherford STAGE 12 OF 14
2011-07-20 H2O 15 9510 Bbl 450980 Weatherford STAGE 6 OF 14

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 CHESAPEAKE APPALACHIA LLC 395290.00 9444.00 130
2012 CHESAPEAKE EXPLORATION LLC 234428.00 5043.00 120
2013 CHESAPEAKE EXPLORATION LLC 441992 6679 350
2014 CHESAPEAKE EXPLORATION LLC 329662 2811 351
2015 CHESAPEAKE EXPLORATION LLC 279631 2420 364
2016 CHESAPEAKE EXPLORATION LLC 231942 1468 366
2017 CHESAPEAKE EXPLORATION LLC 180029 929 247
2018 CHESAPEAKE EXPLORATION LLC 176331 696 365
2019 CHESAPEAKE EXPLORATION LLC 40002 208 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 CHESAPEAKE APPALACHIA LLC Brine 9519 130
2012 CHESAPEAKE EXPLORATION LLC Brine 4411 120
2013 CHESAPEAKE EXPLORATION LLC Brine 4010 350
2014 CHESAPEAKE EXPLORATION LLC Brine 522 351
2015 CHESAPEAKE EXPLORATION LLC Brine 2980 364
2016 CHESAPEAKE EXPLORATION LLC Brine 2234 366
2017 CHESAPEAKE EXPLORATION LLC Brine 922 247
2018 CHESAPEAKE EXPLORATION LLC Brine 2419 365
2019 CHESAPEAKE EXPLORATION LLC Brine 1033 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1745039978 2015-9-16 0:00: PL No Violations
-346219906 2015-1-15 0:00: PW No Violations
-516261776 2019-9-3 0:00:0 PW No Violations 0.30
0346219906 2015-01-15 Production Wells No Violations I was on location to conduct a status check of this well. The well is open flow with a wellhead tree assembly. Jersey barriers were installed around the wellhead. The tank battery consisted of 8, 400 BBL production tanks and was diked. A windsock was installed on the top of the production tanks. Other production equipment on the well pad consisted of:



Jersey barriers are installed around the production equipment. Lightening protection is installed on top of the production tanks. The well is properly identified with a clear, legibly marked well identification sign. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. The lease road is stable and drivable. No violations found.

0916372248 2017-09-06 Production Wells No Violations

The equipment on the pad consists of the following: 8 - 400 bbl production tanks, four labelled as containing produced water, and four labelled as containing condensate. 6 Producing wells 6 Sand separators 6 Gas processing units 1 Combustor unit

1745039978 2015-09-16 Preliminary Restoration No Violations I was on location to conduct a preliminary restoration inspection. The well is equipped with a plunger lift unit. Jersey barriers were installed around the wellhead. The well is properly identified with a clear, legibly marked well identification sign. The tank battery consisted of eight 400 BBL production tanks and was diked. The tanks are located within a spray-lined and sealed secondary containment. There are e-stops outside the barriers, and the tanks are grounded, and have static dissipators. There is a truck grounding area for trucks collecting condensate and/or produced water. Lightning protection and a windsock is installed on top of the production tanks. Other production equipment on the well pad consisted of:


Jersey barriers are installed around the production equipment. The entire well pad is enclosed with a 6 foot high, chain link fence with 3 strand barbed wire and the man doors were locked. Along the interior of the chain link fence there is an earthen berm and it was stable. Drainage and erosion controls at the pad are in place and functioning. A closed-loop, above-ground drilling pit system was used, so there are no earthen pits requiring closure. The pad has a crushed limestone surface, and is in good repair. The lease road is stable and drivable. Preliminary restoration passed.

916372248 2017-9-6 0:00:0 PW No Violations 1.00

For data sources see[10]

References