X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21415

Well Details

Well ID: 34-013-21415
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001620
Farm/Lease Name: BLESSED NW RCH BL
License Status: Producing
License Date: 2019-06-18
Spud Date: 2019-04-12
Spud Drilling Contractor:
Final Drill Date: 2019-09-02
Well Total Depth: 23914.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -80.870000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2019-04-08 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/8/2019, Expired Date:4/7/2020, Drilling unit acres:205.279, Proposed Well Type:OG, Proposed Well Class:POOL
Record Last Modified 2019-04-16
Construction Permit Expires 2020-04-07

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
23732 23786 0
10536 10677 0
10536 10677 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-588744210 2020-4-9 0:00:0 PW No Violations 0.20
-889192834 2019-6-6 0:00:0 DD No Violations 1.00
1469870543 2019-05-01 Casing String Witnessed No Violations On the day of my inspection I witnessed that Falcon Rig 25 had drilled the 22-inch diameter hole to a depth of 323 feet, the base of the mine void was at 273 feet. Wyoming Casing crew ran 317 feet of 18.625-inch diameter J 55 casing at 87.5 pound per foot, with 1 foot of casing above Kelly Bushing, which is 13 feet above ground level. Cement basket was set at 249 feet. C&J Energy Services was on site and rigged up their cement head and loaded lines with 5 barrels of fresh water and pressure tested to 1500 pounds per square inch. C&J Energy Services established circulation with 75 barrels of fresh water and a 35-barrel gel spacer, washed up and then pumped 80 barrels 375 sacks of 15.6 pounds per gallon with a yield of 1.2 cubic feet per sack Class A cement mixed with 5.21 gallons of water per sack. Cement was displaced with 90 barrels of fresh water with 35 barrels of good cement to surface. Plug was bumped at 100 pounds per square inch and pressured up to 680 pounds per square inch floats held with 1 barrels of flow back. I informed Ascent company man Matt Miller that the casing must remain static until cement reaches a compressive strength of 500 pounds per square inch.
1555262189 2019-04-14 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job with Precision Rat Hole top hole rig on location along with Petroset Cement Service. The well was spudded on 04/12/2019 and the rig has drilled a 30 diameter conductor borehole to a measured depth from ground level of 97. The rig inserted 99 of 24 diameter 94.6 pound per foot casing, Petroset Cement Service pumped a 52.5 barrel 250 sack class A cement mix, the cement weight was 15.6 pound per gallon and the yield was 1.18. The cement was displaced with 46 barrels of fresh water. The tin horn cellar set was 8 deep x 10 wide with no circulation or cement returns witnessed to surface. The area was reportedly previously mined for coal and records indicate 60 of mine spoil. The driller indicated the ground was hard and not previously disturbed however the fluid level never rose above 55 measured depth from ground level. The company representative Doug Bennett indicated they would top the well off from surface.
1578497113 2020-1-8 0:00:0 CT No Violations
1615386050 2019-9-26 0:00: DD No Violations 0.20
1853084050 2020-1-8 0:00:0 CT No Violations 0.30
870289247 2019-8-27 0:00: DD No Violations 1.50

For data sources see[4]

References