X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21379

Well Details

Well ID: 34-013-21379
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Kirkwood Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001597
Farm/Lease Name: BOYD HALL A
License Status: Producing
License Date: 2018-12-07
Spud Date: 2018-12-20
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2019-03-07
Well Total Depth: 22240.00 ft
Configuration: Horizontal
Latitude: 40.050000
Longitude: -81.220000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-12-07 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/7/2018, Expired Date:12/6/2020 12:00:00 PM, Drilling unit acres:643.868, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-03-07
Record Last Modified 2019-05-08
Construction Permit Expires 2020-12-06

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
21984 22088 0
21984 22088 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1279275251 2019-9-19 0:00: PL No Violations 0.50
-27717141 2020-1-14 0:00: PW No Violations 0.30
-696949055 2019-5-21 0:00: CT No Violations 0.30
0021768439 2019-02-27 Casing String Witnessed No Violations

-110 grade. A casing float collar and guide shoe were ran along with a DV tool at 2,103. The casing was cemented below the DV tool firs by using a 287 barrel lead followed by a 100 barrel tail cement . Upon the landing of the lower plug the casing was pressure tested to 910 pounds pressure over a 330 displacement pressure. Upon the completion of the lower stage the DV sleeve tool was deployed from surface and allowed 15 minutes to fall before activating the swell packer and stage tool followed by the commencement of the upper section cement job that consists of 77.6 barrels of class A cement with the cement verified at 15.6 pound per gallon by weight of scale. The cement was displaced with 159 barrels of fluid with a final displacement pressure of 650 psi and the casing tested to 1,780 psi upon the landing of the plug. The 2nd stage cement top by design was targeted at 939.

0183370422 2019-02-21 Drill / Deepen / Reopen No Violations Status check inspection found H&P Drilling rig 531 on location and preparing to skid off he # 1 Boyd Hall well over to the said well to begin drilling the 17.5 surface casing borehole. The rig and support equipment is situated on polymer containment and the well pad per miter drains are in the closed position.
1545928147 2018-12-27 Drill / Deepen / Reopen No Violations Status check inspection found the said well was spudded on 12/20/2018 by Precision Drilling Service. Proceeding of the spudding a 26 diameter conductor casing string was set and cemented. 4 wells are present on the pad.
1551105247 2019-02-25 Drill / Deepen / Reopen No Violations
1556739316 2019-03-06 Drill / Deepen / Reopen No Violations

-110 casing at a measured depth of 9,220, the well bore condition is static and loaded with 12.8 pound per gallon oil based drilling mud. Also noted is I reviewed the proposed casing tally and noted the proposed casing tally did not include centralizers in the well bore horizontal section. Clarification was requested from the Divisions Permitting section and the Chief Rick Simmers indicated the horizontal section did not require centralizers.

1638141748 2020-1-16 0:00: PW No Violations 0.20
183370422 2019-2-21 0:00: DD No Violations 0.30
21768439 2019-2-27 0:00: CS No Violations

For data sources see[4]

References