If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21364 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.04,"lon":-80.88,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001539 | |
Farm/Lease Name: COFFIELD S RCH BL | |
License Status: Drilling | |
License Date: 2020-09-01 | |
Spud Date: 2018-08-04 | |
Spud Drilling Contractor: | |
Final Drill Date: | |
Well Total Depth: | |
Configuration: Vertical | |
Latitude: 40.040000 | |
Longitude: -80.880000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2018-08-03 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:8/3/2018, Expired Date:8/3/2019, Drilling unit acres:165.207, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2018-09-17 | Proposed Formations:BLACK RIVER, Issued Date:9/17/2018, Expired Date:9/17/2019, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:FWC |
Record Last Modified | 2018-09-24 | |
Construction Permit Expires | 2019-09-17 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1950358240 | 2018-8-16 0:00: | DD | No Violations | 0.50 |
1533589273 | 2018-08-06 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Falcon Rig 26 had drilled the 24-inch diameter hole to a depth of 501 feet. Wyoming Casing crew ran 493 feet of 18.625-inch diameter J 55 casing at 87.5 pound per foot, with 3.2 feet of casing above Kelly Bushing, which is 13 feet above ground level. Cement basket was set at 430 feet. Falcon Rig 26 established circulation with 200 barrels of fresh water. C&J Energy Services was on site and rigged up their cement head, loaded lines with 5 barrels of fresh water and pressure tested to 1500 pounds per square inch. C&J Energy Services pumped a 35-barrel gel spacer, washed up and then pumped 189 barrels 885 sacks of 15.6 pounds per gallon with a yield of 1.2 cubic feet per sack Class A cement mixed with 5.25 gallons of water per sack. Cement was displaced with 142 barrels of fresh water, plug was bumped at 280 pounds per square inch and pressured up to 830 pounds per square inch floats held with .25 barrels of flow back. Circulation was lost at 120 barrels into displacement. Cement level was determined to be at 36 feet from surface. Falcon Rig 26 then ran 1-inch diameter tubing down the annulus of the 18.625-inch diameter casing and tagged cement at 36 feet, Falcon 26 then pulled tubing back to 30 feet and chained down tubing. C&J Energy Services then pumped 15 barrels of cement through the 1- inch diameter tubing with cement 5 barrels of good cement to surface. |
1533774712 | 2018-08-08 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Falcon Rig 26 had drilled the 17.5-inch diameter well bore to total depth of 1868 feet. Wyoming Casing crew ran 1857 feet of 13.375-inch diameter J 55 casing at 61 pounds per foot, with 3.8 feet of casing above Kelly Bushing, which is 13 feet above ground level. Falcon Rig 26 established circulation with 320 barrels of fresh water. C&J Energy Services was on site and rigged up their cement head, loaded lines with 5 barrels of fresh water and pressure tested to 2000 pounds per square inch. C&J Energy Services pumped a 35-barrel gel spacer, washed up and then pumped 333.4 barrels 1575 sacks of 15.6 pounds per gallon with a yield of 1.19 cubic feet per sack Class A cement mixed with 5.24 gallons of water per sack. Cement was displaced with 275.5 barrels of fresh water with 25 barrels of good cement to surface. Plug was bumped at 900 pounds per square inch and pressured up to 1450 pounds per square inch, floats held with 2 barrels of flow back. |
1950358240 | 2018-08-16 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that the well was equipped with the A section of the well head. The cellars had been cemented up to the A section of the well head, and identification tags had been placed on top of the well head. Ascent Resources Drilling Coordinator Doug Bennett informed me that Patterson UTI 584 would be moving on location after it finishes in Jefferson County. There were no violations at the time of my inspection. |
609729452 | 2020-8-6 0:00:0 | DD | No Violations | 1.00 |
For data sources see[3]