X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21353

Well Details

Well ID: 34-013-21353
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Pultney Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID:
Farm/Lease Name: SHIMBLE 210284
License Status: Drilling
License Date: 2019-11-20
Spud Date: 2018-09-04
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 40.040000
Longitude: -80.820000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-07-30 Proposed Formations:REEDSVILLE, Issued Date:7/30/2018, Expired Date:7/29/2020 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Record Last Modified 2018-08-29
Correction to Well 2018-08-31 CHANGE TO WELL NUMBER PER OPERATOR REQUEST.
Construction Permit Expires 2020-07-29

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1394269067 2020-1-3 0:00:0 CS No Violations 8.00
-206603937 2018-9-4 0:00:0 DD No Violations 0.50
-2143296713 2020-4-6 0:00:0 CT No Violations 0.80
-597883437 2020-2-26 0:00: CT No Violations 0.30
0206603937 2018-09-04 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Lightning Energy was on location with a Soil Mec SR 30 auger rig. I spoke with equipment operator who informed me that they were currently drilling a 36-inch diameter well bore at 22 feet. They plan to run 30-inch diameter casing on 9/5/2018 and cement to surface.
0228034068 2018-09-10 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Lightning energy service had ran 110 feet of 26-inch diameter conductor pipe and cemented to surface. Lightning Energy had cut the conductor off below ground level and welded a plate on top of the conductor. After speaking with Gulfport company man Curtis Stevison, he informed me that the conductor was cemented on 9/6/2018 and there was 10 barrels of good cement to surface.
1673132545 2020-5-6 0:00:0 CT No Violations 0.50
1936123380 2020-10-22 0:00 PW No Violations 0.30
2137362319 2020-4-24 0:00: DD No Violations 0.30
228034068 2018-9-10 0:00: DD No Violations 0.50
28239479 2020-4-16 0:00: DD No Violations 0.40
484912155 2020-1-16 0:00: CS No Violations 6.30

For data sources see[3]

References