X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21336

Well Details

Well ID: 34-013-21336
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Union Township
Operator Name: ASCENT RESOURCES UTICA LLC
Well Pad ID: US-OH-001446
Farm/Lease Name: PROSSER SW UNN BL
License Status: Producing
License Date: 2018-03-05
Spud Date: 2018-04-15
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-06-28
Well Total Depth: 22372.00 ft
Configuration: Horizontal
Latitude: 40.100000
Longitude: -81.020000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-03-05 Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:3/5/2018, Expired Date:3/4/2020 12:00:00 PM, Drilling unit acres:658.216, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-06-28
Correction to Well 2018-10-05 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-12-04
Record Last Modified 2018-12-14
Construction Permit Expires 2020-03-04

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-12-13 22127 22228 0
22127 22228 0
22127 22228 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 08/17/2018 09/09/2018 9021 16,356,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
pH Buffer 8055-55-8 15 0.00006335 98
Crystalline silica, quartz 14808-60-7 100 11.1803 17,235,600.0
Acrylic acid 79-10-7 0.01 0.00000232 4
Fatty acids, tall oil Proprietary 30 0.000324452 501
Glutaraldehyde 111-30-8 30 0.00639345 9857
Sobitan, mono-9-octadecenoate, (Z) 1338-43-8 5 0.00240879 3714
Emulsifier 9002-92-0 10 0.00004223 66
Sodium persulfate 7775-27-1 100 0.00302737 4668
Inorganic salt Proprietary 30 0.0102207 15757
Olefins Proprietary 5 0.000129781 202
Ethanol 64-17-5 1 0.000213115 329
Acrylamide acrylate polymer Proprietary 30 0.0102207 15757
Citric acid 77-92-9 60 0.00452708 6979
Polyoxyalkylene Proprietary 5 0.00240879 3714
Propargyl alcohol 107-19-7 10 0.000108151 167
Sodium polyacrylate 9003-04-7 1 0.000232374 359
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl chlorides

68424-85-1 5 0.00106557 1643
Hydrotreated light petroleum distillate 64742-47-8 30 0.0144527 22281
Telmer Proprietary 10 0.00232375 3583
Ethylene glycol 107-21-1 60 0.0139425 21494
Hydroteated light petroleum distillate 64742-47-8 30 0.0102207 15757
Modified thiourea polymer Proprietary 30 0.000324452 501
Sodium sulfate 7757-82-6 0.1 0.00000303 5
Acrylamide polymer Proprietary 30 0.0144527 22281
Ethoxylated alcohols Proprietary 30 0.000324452 501
Phosphoric acid 7664-38-2 0.1 0.00002131 33
Hydrochloric acid 7647-01-0 7.5 0.0233511 34555
Ploymer Not assigned 68 0.000287186 443
Methanol 67-56-1 60 0.00067874 1047
Fresh Water Operator Base Fluid Water 7732-18-5 100 88.3819 136,250,000.0
GEL 1100 Mountain Supply & Service Gelling Agent Listed Below Listed Below 0 0 0
MC B-8614 Halliburton Biocide Listed Below Listed Below 0 0 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-40/70, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
SCALECHEK LP-70 Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
EXCELERATE PS-2 Halliburton Friction Reducer Listed Below Listed Below 0 0 0
SP BREAKER Halliburton Breaker Listed Below Listed Below 0 0 0
Ingredients Listed Above Listed Above Water 7732-18-5 100 0.384373 592551
FE-2A Halliburton Additive Listed Below Listed Below 0 0 0
FIGHTR EC-3 Halliburton Friction Reducer Listed Below Listed Below 0 0 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-08-16 H2O 15 252585 Gal 239620 Halliburton STAGE 1/74

STAGES 2-73 SEE IMAGES

2018-09-07 H2O 15 175612 Gal 237720 Halliburton STAGE 74/74

STAGES 2-73 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC 1211943 0 84
2019 ASCENT RESOURCES UTICA LLC 1499378 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 ASCENT RESOURCES UTICA LLC Brine 13528 84
2019 ASCENT RESOURCES UTICA LLC Brine 7749 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-2081026681 2018-4-17 0:00: DD No Violations 0.50
-695374395 2019-2-7 0:00:0 PL No Violations 0.20
-90212731 2018-4-18 0:00: CS No Violations 2.00
0090212731 2018-04-18 Casing String Witnessed No Violations Accompanied Belmont County Inspector Andrew Corder, Reference his Report for further details
0449008482 2018-04-19 Casing String Witnessed No Violations Accompanied Belmont County Inspector Andrew Corder, Reference his Report for further details
0695374395 2019-02-07 Preliminary Restoration No Violations Preliminary Restoration status check inspection found The well site meets ORC 1509.072 with vegetation established and erosion control in place. The well site boundary sedimentation control has been removed. The well pad and lease road surface is stone construction and in good repair. The well pad perimeter is protected by an earthen berm, there is also an 8 chain link fence present around the well pad. There are 5 wells present on the pad. Identification is posted on each well and production tank along with the entry point of the lease road and well pad. The well is equipped with a lower A section and upper B section with 2 diameter pipes present attached to the service ports of both sections for the purpose of annular pressure monitoring. The riser pipes are equipped with valves and both electronic transducers and manual gauges. The pressure on the well head A section is 451 pounds pressure and the pressure on the B section is 1,501 pounds pressure. The 5.5 diameter production casing well head flow cross pressure is 2,296 pounds pressure and the pressure on the production head flow cross section is 2,200 pounds pressure. The well is selling off the 5.5 diameter production casing through (2) primary master valves with a production tree installed on the master valves, 2 production flow lines are present, the pressure on the flow lines downstream from the pressure reducing choke valve is 1,350 pounds pressure and 1,186 pounds pressure. There are 5 gas processing units on location and (2) production fluid storage tanks situated inside a polymer lined steel containment dike area. There is a Mark West mid stream pipeline service point at the left rear corner of the well pad. Emergency shut down devices are present at each critical area of the well pad including the entry point of the location.
1093118652 2018-04-18 Drill / Deepen / Reopen No Violations Accompanied Belmont County Inspector Andrew Corder, Reference his Report for further details
1546529051 2018-04-18 Casing String Witnessed No Violations On the day of my inspection I witnessed Precison had augured a 36 inch diameter hole to 100 feet. 100 feet of 30 inch diameter conductor casing was run. CJ/O-tex was onsite with 375 sacks of class A cement. Additives include 1.5% CaCl, 0.2% X-air, and .25 lb./sack cello-flake. Cement weighed with mudscale at 15.6 ppg and yield of 1.2. 80% percent excess ran. Mix water tested 67 degrees Fahrenheit, pH of 6.5 and 47 ppm chlorides. Cement was displaced with 75 barrels of fresh water. No cement returned to surface.
1661650919 2020-2-7 0:00:0 PW No Violations 0.20
2058461296 2018-08-22 Completion Testing No Violations On the day of my inspection I witnessed that Halliburton Completions and wireline service was on location. After speaking with Ascent Resources company man William Bowman, he informed me that they were currently pumping down the perforation gun for the 13th stage of the well. William Bowman also informed me that Ascent Resources was averaging 150 feet per stage and pumping 230 thousand pounds of sand per stage. I was following up from on an incident reported by Trisha Cartmell that there was a fire on the lease road at approximately 07:00 on 8/22/2018. I inspected the site of the incident and there was no contamination on the lease road. I witnessed a small amount of residue from the fire extinguisher deployment, William Bowman informed me that they had a contractor in route to location to remove the residue and replace the stone on the lease road.
2081026681 2018-04-17 Drill / Deepen / Reopen No Violations
449008482 2018-4-19 0:00: CS No Violations 2.00

For data sources see[10]

References