34-013-21320

Well Details

Well ID: 34-013-21320
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001341
Farm/Lease Name: KRNYAICH UNIT B
License Status: Producing
License Date: 2018-01-11
Spud Date: 2018-08-08
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2019-01-01
Well Total Depth: 17614.00 ft
Configuration: Horizontal
Latitude: 39.960000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2018-01-11 Proposed Formations:POINT PLEASANT, Issued Date:1/11/2018, Expired Date:1/11/2020 12:00:00 PM, Drilling unit acres:638.828, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2019-01-01
Record Last Modified 2019-04-02
Construction Permit Expires 2020-01-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
10501 10665 0
17200 17363 0
10501 10665 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1247511707 2018-10-17 0:00 DD No Violations 1.50
-949739794 2018-10-22 0:00 CS No Violations 4.00
0791192934 2018-08-07 Drill / Deepen / Reopen No Violations
0949739794 2018-10-22 Casing String Witnessed No Violations On the day of my inspection I witnessed that Patterson UTI 579 had drilled the 17.5-inch diameter hole to a depth of 2482 foot. Wyoming Casing crew ran 643 feet of 13.325-inch diameter J 55 casing at 61 pounds per foot, and 1811 feet of 54.5 pound per foot J55 buttress thread casing with 2.6 feet of casing above Kelly Bushing, which is 26 feet above ground level. C&J Energy Services was on site and rigged up their cement head and loaded lines with 5 barrels of fresh water and pressure tested to 2000 pounds per square inch. C&J Energy Services pumped a 50-barrel gel spacer, washed up and then pumped 382.26 barrels 1789 sacks of 15.6 pounds per gallon with a yield of 1.2 cubic feet per sack Class A cement mixed with 5.25 gallons of water per sack. Cement was displaced with 373 barrels of fresh water, plug was bumped at 1050 pounds per square inch and pressured up to 1550 pounds per square inch floats held with 2.5 barrels of flow back. There were 63 barrels of good cement to surface. I informed XTO Superintendent Scott Arnold that the casing must remain static until cement reaches a compressive strength of 500 pounds per square inch.
1247511707 2018-10-17 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson UTI 579 was currently tripping out of the hole at 175 feet. After speaking with XTO company man Levi Grover he informed me that they were drilling cement at 636 feet with the 12.25-inch diameter bit and the Bottom Hole Assembly became clogged and they were not able to circulate. They plan to continue to trip out of the hole and change out their Bottom Hole Assembly and continue to drill to approximately 2,500 feet. Levi Grover informed me that they plan on running 13.375-inch diameter casing on 10/20/2018.
1973164922 2019-01-15 Completion Testing No Violations Status check inspection found the well drilling process complete and the well being prepped for the stimulation process. Surefire Wireline is on location and is preparing to run a bond log on the vertical section of the 5.5 diameter production casing. C&J Pressure pumping is slated to mobilize on location and begin stimulation in the next 14 days.
280701483 2020-4-16 0:00: PL No Violations 0.20
791192934 2018-8-7 0:00:0 DD No Violations 0.20
913237804 2019-8-27 0:00: PW No Violations 0.30

For data sources see[4]