X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21315

Well Details

Well ID: 34-013-21315
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Pease Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001529
Farm/Lease Name: RIDGETOP 211400
License Status: Producing
License Date: 2017-12-15
Spud Date: 2017-12-21
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-03-31
Well Total Depth: 20736.00 ft
Configuration: Horizontal
Latitude: 40.130000
Longitude: -80.740000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-12-15 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/15/2017, Expired Date:12/15/2019 12:00:00 PM, Drilling unit acres:552.206, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-03-31
Correction to Well 2018-08-24 TARGET TAKE AS-DRILLED
Record Last Modified 2018-08-27
Construction Permit Expires 2019-12-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
20468 20573 0
11642 11800 0
11642 11800 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/14/2019 02/11/2019 10139 12,576,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Silca) Muskie Proppant Silica Substrate 14808-60-7 100 10.7509 12,693,300.0
Oil Safe AR Heartland Acicdizing Proprietary Proprietary 30 0.00228343 2695.99
SC-30 X-Chem Scale inhibitor Methanol 67-56-1 1 0.000139835 165.1
Hydrochloric Acid 7647-01-0 3 0.000419505 495.3
Sodium polyphosphonate proprietary 1 0.000139835 165.1
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control 2-Propyn-1-ol 107-19-7 5 0.00006473 76.419
Acetic acid 64-19-7 65 0.000841426 993.451
Fatty acids, tall oil 61790-12-3 5 0.00006473 76.419
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006473 76.419
Olefin Proprietary 5 0.00006473 76.419
Methanol 67-56-1 35 0.000453076 534.935
2-Ethylhexanol 104-76-7 10 0.00012945 152.839
Coconut oil acid diethanolamine 68603-42-9 5 0.00006473 76.419
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7647-01-0 28 0.0604568 71379.9
Other Chemical(s) Listed Above See Trade Name(s) List 2-Ethylhexanol 104-76-7 10 0.00012945 152.839
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00006473 76.419
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000903327 1066.54
Olefin Proprietary 5 0.00006473 76.419
Petroleum Distillate 64742-47-8 20 0.0177891 21003.1
Water 7732-18-5 45 0.0400254 47257
Quaternary Ammonium chloride 68424-85-1 3 0.000903327 1066.54
Fatty acids, tall oil 61790-12-3 5 0.00006473 76.419
Methanol 67-56-1 35 0.000453076 534.935
2-Propyn-1-ol 107-19-7 5 0.00006473 76.419
Water 7732-18-5 74 0.0222821 26307.9
Hydrochloric Acid 7647-01-0 3 0.000419505 495.3
Methanol 67-56-1 1 0.000139835 165.1
Coconut oil acid diethanolamine 68603-42-9 5 0.00006473 76.419
Ammonium Chloride 12125-02-9 1 0.000889453 1050.16
Oleic Acid Diethanolamide 93-83-4 2 0.00177891 2100.31
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00177891 2100.31
Plexslick 957 Chemplex Friction Reducer Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00177891 2100.31
Water 7732-18-5 45 0.0400254 47257
Copolymer of 2-propenamide 69418-26-4 30 0.0266836 31504.7
Petroleum Distillate 64742-47-8 20 0.0177891 21003.1
Oleic Acid Diethanolamide 93-83-4 2 0.00177891 2100.31
Ammonium Chloride 12125-02-9 1 0.000889453 1050.16
Water Gulfport Energy Carrier/Base Fluid Water 7732-18-5 100 88.8913 104,952,000.0
Biotreat 15588 X-Chem Biocide Glutaraldehyde 111-30-8 20 0.00602218 7110.24
Didecyl dimethyl Ammonium Chloride 7173-51-5 3 0.000903327 1066.54
Quaternary Ammonium chloride 68424-85-1 3 0.000903327 1066.54
Water 7732-18-5 74 0.0222821 26307.9

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0198421980 2018-08-14 Completion Testing No Violations Status check inspection and documentation on the well drilling and completion process. The well drilling process is complete and the well is equipped with a lower A and upper B section with a production casing flow cross installed atop the B section and 2 valves installed vertically atop the production flow cross to allow the company to manage any unanticipated pressure that may be experienced on the 5.5 production casing while they are awaiting the well stimulation which is scheduled for January 5th 2019. The well head A&B sections are equipped with 2 diameter riser pipes, valves and gauges are present on the riser pipes to monitor annular pressure. I spoke with the company production foreman Eric Indermuhle on this day and they are monitoring and recording the pressures regularly. No production equipment has been installed on the well pad however the mid stream pipeline is being installed by EQT. The pad surface and lease road is of stone construction and in good repair.
0285972094 2018-01-09 Drill / Deepen / Reopen No Violations I conducted an inspection on this location during which I was witness to a hydrostatic casing shoe test on this well. The company drilled out the float equipment and continued to the shoe. The hole was loaded with water following the drill out. After a period of 30 minutes of monitoring it was determined that the hydrostatic test conducted was successful. The company will now continue the drilling of their 17.5-inch diameter open hole section of the well bore.
1058327685 2019-03-20 Preliminary Restoration No Violations Status check inspection found the well drilling and completion process complete on all 5 wells on the pad. A service rig owned by Hybrid Service Company is on location and has completed the completion drill out on the #5 well. Annular pressure monitoring is in place on each well head A&B section. 3rd party contractors are on site installing all surface production equipment. The preliminary restoration was reviewed and no erosion or vegetation issues were noted however some areas were disturbed around the pad during the installation of the midstream pipe line, the preliminary restoration will need followed back up on later after the disturbed areas have had a chance for vegetation to establish. The well pad and lease road surface are stone construction and in good repair. The well pad perimeter earthen berm is in good condition.
127917816 2020-10-26 0:00 PL No Violations 0.20
1515363232 2018-01-07 Casing String Witnessed No Violations On site inspection to witness the surface- mine string casing run and cement job. Pioneer Drilling rig 73 is on location and has mist drilled on air a 24 diameter borehole to a measured depth of 480 with the depth drilled off a 28.5 grilling rig Kelly Bushing heigth. The rig drilled through a mine rubble coal seam zone between the depths of 410 and 414. Upon reaching total depth the rig pulled the drill string and inserted 475 of 18.625 diameter J-55 Grade Buttress thread casing with a 42.7 casing shoe track ran consisting of a guide shoe and float collar and on casing joint between them. Also ran was a Halliburton Swell packer set between the depths of 325 and 329. Attempts to circulate the well bore prior to cementing were unsuccessful. Stingray cement service cemented the casing in a 2 stage process by first pumping a 25 barrel 6% gel mix followed by a 63 barrel absolute volume cement mix consisting of 298 sacks of class A cement with .3% calcium and .25 pounds per sack loss circulation material. The bottom balance cement job was pumped and displaced with 134 barrels of fresh water with circulation to surface saw at 70 barrels into displacement. Upon the landing of the plug casing pressure was increased to 530 PSI (pounds per square inch) and held for 5 minutes. Pressure was then increased to 800 psi with positive indications the packer had inflated, pressure was then bled off to 530 psi and then increased to 1,260 psi and held for 1 minute to closed the second set of valves inside the swell packer, the pressure was held for 60 seconds and at the point Stingray was preparing to release the casing pressure the casing jumped upward forcibly indicating a down hole casing failure. At that point Stingray pumped an additional 10 barrels of fresh water with no circulation or pump pressure and that point the casing crew was called back and the casing screwed back together with make up torque saw up to 7,000 pounds hydraulic pressure achieved. Fluid level was verified at
1968150881 2020-8-11 0:00: PL No Violations 0.20
198421980 2018-8-14 0:00: CT No Violations 0.30
285972094 2018-1-9 0:00:0 DD No Violations 5.00

For data sources see[5]

References