If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21302 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.01,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Richland Township | |
Operator Name: ASCENT RESOURCES UTICA LLC | |
Well Pad ID: US-OH-001620 | |
Farm/Lease Name: BLESSED E RCH BL | |
License Status: Producing | |
License Date: 2019-08-28 | |
Spud Date: 2019-04-12 | |
Spud Drilling Contractor: | |
Final Drill Date: 2019-09-12 | |
Well Total Depth: 22824.00 ft | |
Configuration: Horizontal | |
Latitude: 40.010000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-09-29 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:9/29/2017, Expired Date:9/29/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2019-04-08 | Proposed Formations:UTICA THROUGH POINT PLEASANT, Issued Date:4/8/2019, Expired Date:4/7/2020, Drilling unit acres:205.279, Proposed Well Type:OG, Proposed Well Class:POOL |
Record Last Modified | 2019-04-15 | |
Construction Permit Expires | 2020-04-07 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
22648 | 22703 | 0 | |
10262 | 10403 | 0 | |
10262 | 10403 | 0 |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1086333339 | 2019-9-26 0:00: | DD | No Violations | 0.20 |
-1650589729 | 2019-5-15 0:00: | CS | No Violations | 3.00 |
-1933484317 | 2019-4-14 0:00: | CS | No Violations | 0.70 |
-341223445 | 2018-3-14 0:00: | SC | No Violations | 0.50 |
0341223445 | 2018-03-14 | Surface Facility Construction | No Violations | On the day of my inspection there was no activity currently happening on this location. The location does appear to be out of the construction phase and ready for drilling activity. Permits for drilling have been issue but the operator has not commenced operations at this time. The location was contained within chain-linked fencing. |
1554246054 | 2020-1-8 0:00:0 | CT | No Violations | |
1568741857 | 2019-9-9 0:00:0 | DD | No Violations | 1.50 |
1650589729 | 2019-05-15 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Falcon Rig 25 had drilled the 22-inch diameter hole to a depth of 385 feet, the base of the mine void was at 320 feet. Wyoming Casing crew ran 373 feet of 18.625-inch diameter J 55 casing at 87.5 pound per foot, with 4 foot of casing above Kelly Bushing, which is 13 feet above ground level. There were 2 cement baskets used and set at 300 feet and 230 feet below ground level. C&J Energy Services was on site and rigged up their cement head and loaded lines with 5 barrels of fresh water and pressure tested to 1000 pounds per square inch. C&J Energy Services established circulation with 125 barrels of fresh water and a 35-barrel gel spacer, washed up and then pumped 80 barrels 375 sacks of 15.6 pounds per gallon class A cement with a yield of 1.2 cubic feet per sack, mixed with 5.21 gallons of water per sack. Cement was displaced with 107 barrels of fresh water with 5 barrels of good cement to surface. Plug was bumped at 200 pounds per square inch and pressured up to 800 pounds per square inch floats held with .5 barrels of flow back. I informed Ascent company man that the casing must remain static until cement reaches a compressive strength of 500 pounds per square inch, and once riser has been removed determine if cement level is still at surface |
1809840833 | 2020-4-9 0:00:0 | PW | No Violations | 0.20 |
1933484317 | 2019-04-14 | Casing String Witnessed | No Violations | On site inspection to witness the conductor casing cement job with Precision Rat Hole top hole rig on location along with Petroset Cement Service. The well was spudded on 04/12/2019 and the rig has drilled a 30 diameter conductor borehole to a measured depth from ground level of 96.4. The rig inserted 99 of 24 diameter 94.6 pound per foot casing, Petroset Cement Service pumped a 52.5 barrel 250 sack class A cement mix, the cement weight was 15.6 pound per gallon and the yield was 1.18. The cement was displaced with 46 barrels of fresh water. The tin horn cellar set was 8 deep x 10 wide with cement witnessed to surface. The most recent drilling permit issued by the Division indicate this is the Blessed #9 well. |
856548804 | 2020-1-8 0:00:0 | CT | No Violations | 0.30 |
For data sources see[4]