X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21255

Well Details

Well ID: 34-013-21255
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001520
Farm/Lease Name: HORSESHOE 210011
License Status: Producing
License Date: 2017-12-11
Spud Date: 2018-02-01
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2018-04-22
Well Total Depth: 21129.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -80.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-05-25 Proposed Formations:TRENTON, Issued Date:5/25/2017, Expired Date:5/25/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-12-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:12/11/2017, Expired Date:12/11/2019 12:00:00 PM, Drilling unit acres:678.867, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-04-22
Record Last Modified 2018-08-27
Correction to Well 2018-08-31 TARGET TAKE AS-DRILLED
Construction Permit Expires 2019-12-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
20866 10611 0
20866 10611 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1021226114 2019-6-13 0:00: CT No Violations 0.20
-1942204275 2020-2-25 0:00: PW No Violations 0.20
1121445697 2020-10-20 0:00 PW No Violations 0.20
1278145027 2018-07-31 Completion Testing No Violations Status check inspection found the well drilling process is complete and there is a night cap on the well head B section. Crews are on site installing the subsurface production equipment such as flowlines etc. 6 wells have been drilled on the well pad. The drilling rig mouse hole has been filled with cement.
1517568874 2018-02-02 Casing String Witnessed No Violations On the day of my inspection Pioneer Rig 73 had reached total depth in the 17.5-inch diameter open hole section of the well bore at 1388 feet. The 13.375-inch diameter casing string was ran to total depth and Halliburton Cementing Services was on site to complete the cementing procedures. Halliburton ran 1240 sacks of Class H cement with 30 percent excess added. Cement additives included .3 percent CaCl and .25 pound per sack Celluseal. Cement was weighed with a mud scale to ensure the cement truck was calibrated correctly. Cement was pumped at a weight of 15.8 pounds per gallon. The cement procedure was successful and cement returns to surface were established.
1554993750 2019-04-11 Completion Testing No Violations Status check inspection found Stingray pressure pumping service along with Nine Energy wireline on location completing wells # 4 #5&#6 on location. The #1 #2 and # 3 wells will have the stimulation process started on 04/15/2019. The said well is equipped with a lower A and upper B section with 2 primary master valves present. The 2 primary master valves present are owned by B&B. All annular pressures are being recorded daily.
1978592220 2020-4-29 0:00: PW No Violations 0.20
2081522833 2019-7-30 0:00: PL No Violations 0.40

For data sources see[4]

References