X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21219

Well Details

Well ID: 34-013-21219
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001502
Farm/Lease Name: GOLIATH
License Status: Producing
License Date: 2017-09-11
Spud Date: 2018-02-20
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-04-25
Well Total Depth: 17130.00 ft
Configuration: Horizontal
Latitude: 39.990000
Longitude: -81.090000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-04-04 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/4/2017, Expired Date:4/4/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-09-11 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/11/2017, Expired Date:9/11/2019 12:00:00 PM, Drilling unit acres:426.5791, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-04-25
Correction to Well 2018-09-07 TAKE TARGET AS-DRILLED
Completion Report Received 2019-03-22
Record Last Modified 2019-04-04
Construction Permit Expires 2019-09-11

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2019-04-03 9089 9256 0
2019-04-03 17008 17042 0
17008 17042 0
9089 9256 0
9089 9256 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/17/2018 10/05/2018 9093.72 16,846,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FE-2A Halliburton Additive Listed Below
Hydrochloric Acid (15%) Halliburton Acidizing Listed Below
LP-50 Halliburton Scale Inhibitor Listed Below
FPD-S1296-17 Halliburton Acid Corrosion Inhibitor Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
LD-2950 Halliburton Friction Reducer Listed Below
MC B-8614 Halliburton Biocide Listed Below
DireCT NewPark Drilling Fluids Lubricant Listed Below
Propargyl Alcohol 107-19-7 5 0.00000956 15.789
Methanol 67-56-1 100 0.000191216 315.775
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branche

Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branched

69011-36-5 5 0.00304501 5028.53
2,2,4-Trimethylpentance-1,3 Diol Monoisobutyrate 25265-77-4 7 0.00000675 11.146
Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.01827 30171.2
Methanol 67-56-1 30 0.00645614 10661.7
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branche

Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branched

69011-36-5 5 0.00304501 5028.53
Quaternary Ammonium Compounds,

Benzyl-C12-16Alkyldimethyl, Chlorides

68424-85-1 5 0.00107253 1771.18
Hydrochloric Acid 7647-01-0 15 0.0196775 32495.4
Phosphonic Acid Salt Proprietary 30 0.00645614 10661.7
Methanol 67-56-1 30 0.00645614 10661.7
Silica Substrate 14808-60-7 100 14.633 24,165,000.0
Citric Acid 77-92-9 60 0.000413561 682.955
Glutaraldehyde 111-30-8 30 0.00643518 10627.1
Citric Acid 77-92-9 60 0.000413561 682.955
Ethoxylated Alcohols Proprietary 5 0.00000956 15.789
Benzenesulfonic Acid, dodecyl-,

Compound with 2-Aminoethanol (1:1)

26836-07-7 7 0.00000675 11.146
Phosphonic Acid Salt Proprietary 30 0.00645614 10661.7
Ethoxylated Alcohol Proprietary 5 0.00304501 5028.53
Benzenesulfonic Acid, dodecyl-,

Compound with 2-Aminoethanol (1:1)

26836-07-7 7 0.00000675 11.146
Hydrotreated Light Petroleum Distillate 64742-47-8 30 0.01827 30171.2
2,2,4-Trimethylpentance-1,3 Diol Monoisobutyrate 25265-77-4 7 0.00000675 11.146
Ethoxylated Alcohol Proprietary 5 0.00304501 5028.53
Modified Thiourea Polymer Proprietary 30 0.00005736 94.732
Sand (Proppant) Halliburton Proppant Listed Below
Water Halliburton Carrier/Base Fluid Water 7732-18-5 100 85.1309 140,585,000.0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-10-05 H2O 15 9543 Bbl 602240 Halliburton STAGE 41/41

STAGES 2-40 SEE IMAGES

2018-09-17 H2O 15 6483 Bbl 240420 Halliburton STAGE 1/41

STAGES 2-40 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2019 RICE DRILLING D LLC 629223 0 56

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2019 RICE DRILLING D LLC Brine 5013 56

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1012946494 2018-12-26 0:00 CT No Violations 0.30
-2105819316 2018-11-5 0:00: CT No Violations
1012946494 2018-12-26 Completion Testing No Violations Status check inspection on the well completion process found the well drilling and stimulation process complete. The 5.5 diameter production casing was set to a depth of 17,126 . The well was stimulated in 40 stages and the completion plugs have been drilled out. Prior to drilling out the completion plugs the (2) master valves used in the completion process were changed out and (2) company owned master valves were installed on the well head B section. No production tubing was set in the well bore and a production tree was installed on the master valves prior to drilling out the completion plugs. The company will not flow the wells back until the completion drill out is finished on all (7) wells on the pad. Deep Well Services tubing snubbing unit is the rig on location completing the wells. All completion equipment is situated on polymer containment. The production equipment has not been set on the pad.
2105819316 2018-11-05 Completion Testing No Violations Status check inspection to document the completion activity on the well pad. Halliburton is on location actively completing 2 of the wells on the pad. 2 wells are complete and 2 have not been started . 7 wells total are present on the well pad. The said well along with the # 2 well are the 2 that have had completion stimulation operations completed. The well is currently equipped with a Cactus well head A&B section with a 7.0625 lower manual and hydraulic completion valves installed on the B section. The 9.625 x 5.5 casing annulis is being monitored electronically. All completion and support equipment is situated on polymer containment.
75295103 2020-3-13 0:00: PW No Violations 0.20
926016291 2019-9-11 0:00: PL No Violations 0.30

For data sources see[10]

References