If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21217 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.99,"lon":-81.09,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Goshen Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001502 | |
Farm/Lease Name: GOLIATH | |
License Status: Producing | |
License Date: 2017-09-11 | |
Spud Date: 2018-02-20 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2018-04-06 | |
Well Total Depth: 17882.00 ft | |
Configuration: Horizontal | |
Latitude: 39.990000 | |
Longitude: -81.090000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-04-04 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:4/4/2017, Expired Date:4/4/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-09-11 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:9/11/2017, Expired Date:9/11/2019 12:00:00 PM, Drilling unit acres:502.5623, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2018-04-06 | |
Correction to Well | 2018-06-08 | UPDATE TO TARGET/TAKE PER AS-DRILLED PLAT |
Completion Report Received | 2019-03-22 | |
Record Last Modified | 2019-04-04 | |
Construction Permit Expires | 2019-09-11 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2019-04-03 | 9838 | 10004 | 0 |
2019-04-03 | 17575 | 17755 | 0 |
17575 | 17755 | 0 | |
9838 | 10004 | 0 | |
9838 | 10004 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/01/2018 | 11/28/2018 | 9111.08 | 16,031,700.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | LP-50 | Halliburton | Scale Inhibitor | Listed Below | ||||
Sand (Proppant) | Halliburton | Proppant | Listed Below | |||||
Hydrochloric Acid (15%) | Halliburton | Acidizing | Listed Below | |||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00001004 | 15.789 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.0225491 | 35449.6 | ||||
Methanol | 67-56-1 | 30 | 0.00274605 | 4317.09 | ||||
Glutaraldehyde | 111-30-8 | 30 | 0.00498814 | 7841.89 | ||||
Phosphonic Acid Salt | Proprietary | 30 | 0.00274605 | 4317.09 | ||||
Phosphonic Acid Salt | Proprietary | 30 | 0.00274605 | 4317.09 | ||||
Propargyl Alcohol | 107-19-7 | 5 | 0.00001004 | 15.789 | ||||
Ethoxylated Alcohol | Proprietary | 5 | 0.00299452 | 4707.71 | ||||
Quaternary Ammonium Compounds,
Benzyl-C12-16Alkyldimethyl, Chlorides |
68424-85-1 | 5 | 0.000831357 | 1306.98 | ||||
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branche
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branched |
69011-36-5 | 5 | 0.00299452 | 4707.71 | ||||
Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.0179671 | 28246.2 | ||||
Hydrotreated Light Petroleum Distillate | 64742-47-8 | 30 | 0.0179671 | 28246.2 | ||||
Methanol | 67-56-1 | 30 | 0.00274605 | 4317.09 | ||||
Ethoxylated Alcohols | Proprietary | 5 | 0.00001004 | 15.789 | ||||
Methanol | 67-56-1 | 100 | 0.000200861 | 315.775 | ||||
Ethoxylated Alcohol | Proprietary | 5 | 0.00299452 | 4707.71 | ||||
Citric Acid | 77-92-9 | 60 | 0.000434421 | 682.955 | ||||
Modified Thiourea Polymer | Proprietary | 30 | 0.00006026 | 94.732 | ||||
Citric Acid | 77-92-9 | 60 | 0.000434421 | 682.955 | ||||
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branche
Poly(oxy-1,2-Ethanediyl), Alpha-Tridecyl-Omega-Hydroxy-Branched |
69011-36-5 | 5 | 0.00299452 | 4707.71 | ||||
Silica Substrate | 14808-60-7 | 100 | 14.664 | 23,053,300.0 | ||||
Water | Halliburton | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 85.0991 | 133,785,000.0 | |
FPD-S1296-17 | Halliburton | Acid Corrosion Inhibitor | Listed Below | |||||
LD-2950 | Halliburton | Friction Reducer | Listed Below | |||||
FE-2A | Halliburton | Additive | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Listed Below | |||||
MC B-8614 | Halliburton | Biocide | Listed Below |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-11-01 | H2O | 15 | 5044 Gal | 199980 | Halliburton | STAGE 1/39
STAGES 2-38 SEE IMAGES |
2018-11-27 | H2O | 15 | 9889 Bbl | 609120 | Halliburton | STAGE 39/39
STAGES 2-38 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | RICE DRILLING D LLC | 738269 | 0 | 66 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2019 | RICE DRILLING D LLC | Brine | 52987 | 66 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1009453121 | 2018-4-4 0:00:0 | DD | No Violations | 1.00 |
-855544384 | 2018-12-26 0:00 | CT | No Violations | 0.50 |
0463264159 | 2018-03-13 | Drill / Deepen / Reopen | No Violations | Accompanied Belmont County Inspector Andrew Corder, Reference his Report for further details |
0855544384 | 2018-12-26 | Completion Testing | No Violations | Status check inspection on the well completion process found the well drilling and stimulation process complete. The 5.5 diameter production casing was set to a depth of 17,839. The well was stimulated in 39 stages and the 40 completion plugs have not been drilled out. Prior to drilling out the completion plugs the (2) master valves used in the completion process were changed out and (2) company owned master valves were installed on the well head B section. No production tubing will be set in the well bore and a production tree was installed on the master valves prior to drilling out the completion plugs. The company will not flow the wells back until the completion drill out is finished on all (7) wells on the pad. Deep Well Services tubing snubbing unit is the rig on location completing the wells. All completion equipment is situated on polymer containment. The production equipment has not been set on the pad. |
1009453121 | 2018-04-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed H&P Flex Rig #471 was drilling ahead on Del Scorcho #4H in their 12.25 inch diameter deep intermediate string, currently drilling on air and surfactant at a depth of 6,494 feet with a planned total depth of 8,700 feet. They were currently drilling in the Salina and had seen no signs of H2S. I spoke with Pat Smith, EQT Company Man and he estimated they would be cementing the intermediate string sometime Thursday evening or Friday morning they plan to displace cement with oil base mud. The rig will continue to drill the lateral section before skidding rig and moving to the next well. This is the 2nd well on the pad with 4 remaining wells to be drilled. |
1520975699 | 2018-03-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Patterson Rig 582 was rigging up over this well and had anticipated to commence drilling of this well beginning this evening into the morning. |
1760340489 | 2019-9-11 0:00: | PL | No Violations | 0.30 |
1956571229 | 2018-11-05 | Completion Testing | No Violations | Status check inspection on the well completion process found that there are 7 wells present on the pad all with the drilling process complete. Halliburton is on site stimulating stage 12 of 39 total stages on the said well, also the # 12 well on the pad is currently being completed. EP Wireline service is on location. The average treating pressure is 10,600 pounds pressure with a average fluid volume of 9,500 barrels fluid per stage. The company is receiving a large volume of processed fluid per day by the means of water truck, this fluid is being stored on site in an above ground storage tank that has an open top. The fluid is production water from other wells in the area owned by the operator. The well head assembly is made up of a Cactus Company lower A and upper B permanent well head sections. Atop the Cactus well head B section is a completion stack rented from a company identified as Silver Creek. The stack is made up of the following starting from the bottom working upward, A manual maser valve followed by a hydraulic master valve then a flow cross. Atop the flow cross is another manual master valve used as the working valve followed by a spacing spool then toped off with the working head assembly (goat head) , all components being 15,000 rated working pressure and 7.0625 diameter. All casing annulis are being monitored electronically and all Halliburton completion iron is 15,000 psi rated working pressure. |
2133101353 | 2020-3-13 0:00: | PW | No Violations | 0.20 |
463264159 | 2018-3-13 0:00: | DD | No Violations | 0.50 |
For data sources see[10]