X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21213

Well Details

Well ID: 34-013-21213
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001517
Farm/Lease Name: DEL SCORCHO
License Status: Producing
License Date: 2017-11-09
Spud Date: 2018-05-14
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2018-08-22
Well Total Depth: 20496.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -81.070000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-27 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/27/2017, Expired Date:3/27/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-11-09 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:11/9/2017, Expired Date:11/9/2019 12:00:00 PM, Drilling unit acres:459.6504, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2018-05-09 UPDATE TARGET/TAKE AS-DRILLED PLAT
Correction to Well 2018-06-22 CHANGE TO TARGET AND TAKE-POINT INFORMATION.
Reached Total Depth 2018-08-22
Record Last Modified 2018-11-05
Construction Permit Expires 2019-11-09

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
20357 20408 0
9153 9334 0
9153 9334 0

For data sources see[3]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1273022195 2018-12-20 0:00 CT No Violations 0.20
-1297704182 2020-5-7 0:00:0 PW No Violations 0.20
0176771517 2019-03-04 Completion Testing No Violations Status check inspection found 6 wells present on the pad. The said well has been drilled and not completed. The well is equipped with a night cap with a manual gate valve on the night cap. There is a gauge on the valve but the valve is closed. No annular pressure monitoring is present on the A or B section. The Del Scorcho # 8 #10 and #12 wells have been drilled but are not completed. The number 2 #4 and # 6 wells are in the flow back production stages and are not equipped with annular pressure monitoring either. There is a large above ground storage tank on location. The well pad perimeter does have a sound wall erected on top of the earthen berm. A third party midstream pipe line was installed ant the earthen berm was removed and not properly put back. I did notify ODNR Engineer Technician Anthony Carson on this day of the deficiency related to the berm.
1121462675 2020-1-16 0:00: PW No Violations 0.30
1273022195 2018-12-20 Completion Testing No Violations Status check inspection found the well drilling process complete and the well equipped with a night cap on the B section. The well has not been stimulated. 6 wells are present on the pad that have been drilled and only (2) are in production.
1423236168 2019-06-04 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Pressure Pumping, Schlumberger wireline were currently on location and had just completed the 17th stage of the stimulation process out of a total of 57 total stages. At the time of my inspection the stimulation process was currently shut down due to a wireline failure at surface. Annular pressures were being monitored on every well on the pad. After speaking with EQT consultant Brad Wolff he informed me that they had a Schlumberger wireline failure at surface, they intend to switch out the Schlumberger wireline truck and tool. I informed EQT consultant Brad Wolff to keep me updated with any problems or situations that occur during the stimulation process.
1462932177 2018-05-17 Casing String Witnessed No Violations On the day of my inspection I witnessed that H&P 471 had drilled the 24 inch diameter hole to a depth of 404 feet. Wyoming Casing Crew ran 369 feet of 18.625 inch diameter J 55 casing at 87.5 pound per foot, with 5.1 feet of casing above KB. BJ Services was on site and rigged up their cement head, loaded lines with 5 barrels of fresh water and pressure tested to 2500 pounds per square inch. BJ Services broke circulation with 167 barrels of fresh water, pumped a 35 barrel gel spacer, and 10 barrels of fresh water spacer, and 142 barrels of 15.6 pounds per gallon with a yield of 1.20 cubic feet per sack Class A cement mixed with 5.25 gallons of water per sack. Cement was displaced with 98 barrels of fresh water and had 16 barrels of good cement returns to surface. Plug was bumped at 150 pounds per square inch and pressured up to 650 pounds per square inch and held for 5 minutes, floats held with 1 barrel of flow back.
1526919184 2018-05-16 Drill / Deepen / Reopen No Violations
1593613064 2020-7-1 0:00:0 PW No Violations 0.50
176771517 2019-3-4 0:00:0 CT No Violations 0.20
424924492 2019-7-11 0:00: CT No Violations 0.50

For data sources see[4]

References