34-013-21195

Well Details

Well ID: 34-013-21195
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001457
Farm/Lease Name: KING KRUNCH
License Status: Producing
License Date: 2017-03-29
Spud Date: 2017-06-27
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-10-20
Well Total Depth: 19613.00 ft
Configuration: Horizontal
Latitude: 39.950000
Longitude: -80.920000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-03-07 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-29 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/29/2017, Expired Date:3/29/2019 12:00:00 PM, Drilling unit acres:601.3621, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-10-20
Correction to Well 2018-01-05 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE
Completion Report Received 2018-08-21
Record Last Modified 2018-08-31
Construction Permit Expires 2019-03-29

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-30 10390 10512 0
2018-08-30 19444 19491 0
19444 19491 0
10390 10512 0
10390 10512 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/11/2018 06/25/2018 9879.03 25,826,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 86.7957 215,521,000.0
Guar gum 9000-30-0 60 0.000156678 389.044
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0014574 3618.85
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.014574 36188.5
Sodium persulfate 7775-27-1 99 0.00000279 6.93
Oleic acid diethanolamide 93-83-4 2 0.0014574 3618.85
Guar gum 9000-30-0 60 0.000156678 389.044
Sodium persulfate 7775-27-1 99 0.00000279 6.93
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000156678 389.044
Methanol 67-56-1 90 0.000242964 603.3
Xylene 1330-20-7 5 0.00001350 33.517
Copolymer of 2-propenamide 69418-26-4 20 0.014574 36188.5
Oleic acid diethanolamide 93-83-4 2 0.0014574 3618.85
Silica Substrate 14808-60-7 100 12.8983 32,027,700.0
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.0014574 3618.85
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.014574 36188.5
Methanol 67-56-1 30 0.00636199 15797.4
Sodium hypochlorite 7681-52-9 16 0.00254737 6325.34
Isoproyl alcohol 67-63-0 5 0.00001350 33.517
Trade Secret Proprietary 10 0.00002611 64.841
Trade Secret Proprietary 10 0.00002611 64.841
Sodium hydroxide 1310-73-2 5 0.000796052 1976.67
Fatty imidazoline 61790-69-0 5 0.00001350 33.517
Ethylbenzene 100-41-4 1 0.00000270 6.703
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001350 33.517
Sodium hydroxide 1310-73-2 5 0.000796052 1976.67
Prop-2-yn-1-ol 107-19-7 5 0.00001350 33.517
Hydrochloric Acid 7647-01-0 15 0.029316 72794.2
Methanol 67-56-1 30 0.00636199 15797.4
Ethylbenzene 100-41-4 1 0.00000270 6.703
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000156678 389.044
Sodium hypochlorite 7681-52-9 16 0.00254737 6325.34
Copolymer of 2-propenamide 69418-26-4 20 0.014574 36188.5
KWBO-2 Keane Group Breaker Listed Below
KAI-12 Keane Group Acid inhibitor Listed Below
Sand (Proppant) Keane Group Proppant Listed Below
KWG-111L Keane Group Gelling agent Water 7732-18-5 89.7 0.0142812 35461.4
Water 7732-18-5 50 0.036435 90471.2
KSI-19 Keane Group Scale inhibitor Listed Below
KFR-23 Keane Group Friction reducer Listed Below
Hydrochloric Acid Keane Group Acidizing Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 50 0.036435 90471.2
Water 7732-18-5 89.7 0.0142812 35461.4
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-05-11 H2O 15 5795 Bbl 241600 Keane Frac STAGE 1/47

STAGES 2-46 SEE IMAGES

2018-06-24 H2O 15 8869 Bbl 494890 Keane Frac STAGE 47/47

STAGES 2-46 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 2430933 0 151
2019 RICE DRILLING D LLC 1531215 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 72626 151
2019 RICE DRILLING D LLC Brine 29147 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1295139016 2019-3-28 0:00: PL No Violations 0.20
-1317505223 2018-6-21 0:00: CT No Violations 0.20
-34149159 2019-3-28 0:00: PL No Violations 0.20
-378830821 2017-9-14 0:00: DD No Violations 1.00
-541820441 2018-7-11 0:00: CT No Violations 0.50
-977716699 2017-6-28 0:00: CS No Violations 1.00
0034149159 2019-03-28 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility.
0378830821 2017-09-14 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 296 was drilling 12.25 inch diameter hole with PDC bit at a depth of 8840 feet. They are drilling with oilbase mud. At 7am on 9/10 they were mist drilling at 8367 feet and got a gas kick which resulted in a 50-
0541820441 2018-07-11 Completion Testing No Violations

- 3 inch diameter manual valves and an emergency shut in device.

0977716699 2017-06-28 Casing String Witnessed No Violations On site inspection to witness the Conductor casing cement job at 13:15 hours along with Express Energy Conductor Drilling rig and Express Energy Cement Service. Express Energys conductor rig has drilled a 36 diameter borehole to a measured depth of 100 from ground level with fresh water encountered at 80 from a coal seam. The rig then inserted 100 of 32 diameter .375 wall casing into the borehole. The casing was cemented with 57 barrels of cement consisting of 275 sacks of class A cement with 2% calcium and .50 pound per sack loss circulation material, the cement weight was verified at 15.6 pound per gallon by weight of scale. Cement calculations were for annular capacity with 50% excess and no shoe track. The cement was displaced to 90 with 75 barrels of fresh water. Cement returns were witnessed to surface with 1 of cement left inside the cellar floor to create a liquid tight seal.
1295139016 2019-03-28 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility.
1317505223 2018-06-21 Completion Testing No Violations Status check inspection found a service provider identified as Keane Energy on location with their pressure pumping units (17 total) along with 2 pump down trucks and a wireline truck. The said well has a total of 40 out of 47 stages stimulated. The well head completion stack is owned by Cactus and consists of a lower master valve followed by a hydrologic master valve then a flow cross with an additional manual master valve atop the flow cross section. Both the 13.375 and 9.625 well head sections have pressure monitoring devices installed.
1505818542 2017-08-31 Casing String Witnessed No Violations On location to witness the cementing of 20# surface casing. The rig ran 20 casing with all the required float equipment ot 498. O-tex Pumping cemented with 770 sacks of Class H cement. Good cement was returned to the surface. The casing pressure test passed.
1962544704 2017-08-30 Casing String Witnessed No Violations On location to witness the cementing of the 20 surface casing. The rig ran 20 casing with all the required float equipment to 498. O-Tex cemented with 770 sacks of Class H cement. There were 38 bbls of cement returned to the surface. The pressure test of the casing passed.
1988226687 2018-07-11 Completion Testing No Violations Status check inspection found the well drilling and completion process complete and the well. Crews were on site conducting completion operations on other wells on the pad. The 9.625 diameter casign well head section annular pressure was being monitored and was hooked to a flow back manifold and gas buster tank however the 13.375 diameter casing well head section annular pressure was not being monitored. The company men on site were informed to monitor all annular pressures and given a copy of the well construction rules.

For data sources see[10]