Well ID: 34-013-21195 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.95,"lon":-80.92,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Smith Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001457 | |
Farm/Lease Name: KING KRUNCH | |
License Status: Producing | |
License Date: 2017-03-29 | |
Spud Date: 2017-06-27 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2017-10-20 | |
Well Total Depth: 19613.00 ft | |
Configuration: Horizontal | |
Latitude: 39.950000 | |
Longitude: -80.920000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2017-03-07 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:3/7/2017, Expired Date:3/7/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2017-03-29 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/29/2017, Expired Date:3/29/2019 12:00:00 PM, Drilling unit acres:601.3621, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2017-10-20 | |
Correction to Well | 2018-01-05 | UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
Completion Report Received | 2018-08-21 | |
Record Last Modified | 2018-08-31 | |
Construction Permit Expires | 2019-03-29 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2018-08-30 | 10390 | 10512 | 0 |
2018-08-30 | 19444 | 19491 | 0 |
19444 | 19491 | 0 | |
10390 | 10512 | 0 | |
10390 | 10512 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 05/11/2018 | 06/25/2018 | 9879.03 | 25,826,400.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Keane Group | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 86.7957 | 215,521,000.0 |
Guar gum | 9000-30-0 | 60 | 0.000156678 | 389.044 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0014574 | 3618.85 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.014574 | 36188.5 | ||||
Sodium persulfate | 7775-27-1 | 99 | 0.00000279 | 6.93 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.0014574 | 3618.85 | ||||
Guar gum | 9000-30-0 | 60 | 0.000156678 | 389.044 | ||||
Sodium persulfate | 7775-27-1 | 99 | 0.00000279 | 6.93 | ||||
Solvent naphtha (petroleum) heavy aliph | 64742-96-7 | 60 | 0.000156678 | 389.044 | ||||
Methanol | 67-56-1 | 90 | 0.000242964 | 603.3 | ||||
Xylene | 1330-20-7 | 5 | 0.00001350 | 33.517 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 20 | 0.014574 | 36188.5 | ||||
Oleic acid diethanolamide | 93-83-4 | 2 | 0.0014574 | 3618.85 | ||||
Silica Substrate | 14808-60-7 | 100 | 12.8983 | 32,027,700.0 | ||||
Alcohols, C12-16, ethoxylated | 68551-12-2 | 2 | 0.0014574 | 3618.85 | ||||
Distillates (petroleum), hydrotreated light | 64742-47-8 | 20 | 0.014574 | 36188.5 | ||||
Methanol | 67-56-1 | 30 | 0.00636199 | 15797.4 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.00254737 | 6325.34 | ||||
Isoproyl alcohol | 67-63-0 | 5 | 0.00001350 | 33.517 | ||||
Trade Secret | Proprietary | 10 | 0.00002611 | 64.841 | ||||
Trade Secret | Proprietary | 10 | 0.00002611 | 64.841 | ||||
Sodium hydroxide | 1310-73-2 | 5 | 0.000796052 | 1976.67 | ||||
Fatty imidazoline | 61790-69-0 | 5 | 0.00001350 | 33.517 | ||||
Ethylbenzene | 100-41-4 | 1 | 0.00000270 | 6.703 | ||||
Alcohols, C7-9-iso-, C8-rich | 68526-83-0 | 5 | 0.00001350 | 33.517 | ||||
Sodium hydroxide | 1310-73-2 | 5 | 0.000796052 | 1976.67 | ||||
Prop-2-yn-1-ol | 107-19-7 | 5 | 0.00001350 | 33.517 | ||||
Hydrochloric Acid | 7647-01-0 | 15 | 0.029316 | 72794.2 | ||||
Methanol | 67-56-1 | 30 | 0.00636199 | 15797.4 | ||||
Ethylbenzene | 100-41-4 | 1 | 0.00000270 | 6.703 | ||||
Solvent naphtha (petroleum) heavy aliph | 64742-96-7 | 60 | 0.000156678 | 389.044 | ||||
Sodium hypochlorite | 7681-52-9 | 16 | 0.00254737 | 6325.34 | ||||
Copolymer of 2-propenamide | 69418-26-4 | 20 | 0.014574 | 36188.5 | ||||
KWBO-2 | Keane Group | Breaker | Listed Below | |||||
KAI-12 | Keane Group | Acid inhibitor | Listed Below | |||||
Sand (Proppant) | Keane Group | Proppant | Listed Below | |||||
KWG-111L | Keane Group | Gelling agent | Water | 7732-18-5 | 89.7 | 0.0142812 | 35461.4 | |
Water | 7732-18-5 | 50 | 0.036435 | 90471.2 | ||||
KSI-19 | Keane Group | Scale inhibitor | Listed Below | |||||
KFR-23 | Keane Group | Friction reducer | Listed Below | |||||
Hydrochloric Acid | Keane Group | Acidizing | Listed Below | |||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 50 | 0.036435 | 90471.2 | |
Water | 7732-18-5 | 89.7 | 0.0142812 | 35461.4 | ||||
Sodium Hypochlorite | Dirk Thomas Solutions | Biocide | Listed Below |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2018-05-11 | H2O | 15 | 5795 Bbl | 241600 | Keane Frac | STAGE 1/47
STAGES 2-46 SEE IMAGES |
2018-06-24 | H2O | 15 | 8869 Bbl | 494890 | Keane Frac | STAGE 47/47
STAGES 2-46 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | 2430933 | 0 | 151 |
2019 | RICE DRILLING D LLC | 1531215 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2018 | RICE DRILLING D LLC | Brine | 72626 | 151 |
2019 | RICE DRILLING D LLC | Brine | 29147 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1295139016 | 2019-3-28 0:00: | PL | No Violations | 0.20 |
-1317505223 | 2018-6-21 0:00: | CT | No Violations | 0.20 |
-34149159 | 2019-3-28 0:00: | PL | No Violations | 0.20 |
-378830821 | 2017-9-14 0:00: | DD | No Violations | 1.00 |
-541820441 | 2018-7-11 0:00: | CT | No Violations | 0.50 |
-977716699 | 2017-6-28 0:00: | CS | No Violations | 1.00 |
0034149159 | 2019-03-28 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility. |
0378830821 | 2017-09-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed Patterson 296 was drilling 12.25 inch diameter hole with PDC bit at a depth of 8840 feet. They are drilling with oilbase mud. At 7am on 9/10 they were mist drilling at 8367 feet and got a gas kick which resulted in a 50- |
0541820441 | 2018-07-11 | Completion Testing | No Violations
- 3 inch diameter manual valves and an emergency shut in device. | |
0977716699 | 2017-06-28 | Casing String Witnessed | No Violations | On site inspection to witness the Conductor casing cement job at 13:15 hours along with Express Energy Conductor Drilling rig and Express Energy Cement Service. Express Energys conductor rig has drilled a 36 diameter borehole to a measured depth of 100 from ground level with fresh water encountered at 80 from a coal seam. The rig then inserted 100 of 32 diameter .375 wall casing into the borehole. The casing was cemented with 57 barrels of cement consisting of 275 sacks of class A cement with 2% calcium and .50 pound per sack loss circulation material, the cement weight was verified at 15.6 pound per gallon by weight of scale. Cement calculations were for annular capacity with 50% excess and no shoe track. The cement was displaced to 90 with 75 barrels of fresh water. Cement returns were witnessed to surface with 1 of cement left inside the cellar floor to create a liquid tight seal. |
1295139016 | 2019-03-28 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility. |
1317505223 | 2018-06-21 | Completion Testing | No Violations | Status check inspection found a service provider identified as Keane Energy on location with their pressure pumping units (17 total) along with 2 pump down trucks and a wireline truck. The said well has a total of 40 out of 47 stages stimulated. The well head completion stack is owned by Cactus and consists of a lower master valve followed by a hydrologic master valve then a flow cross with an additional manual master valve atop the flow cross section. Both the 13.375 and 9.625 well head sections have pressure monitoring devices installed. |
1505818542 | 2017-08-31 | Casing String Witnessed | No Violations | On location to witness the cementing of 20# surface casing. The rig ran 20 casing with all the required float equipment ot 498. O-tex Pumping cemented with 770 sacks of Class H cement. Good cement was returned to the surface. The casing pressure test passed. |
1962544704 | 2017-08-30 | Casing String Witnessed | No Violations | On location to witness the cementing of the 20 surface casing. The rig ran 20 casing with all the required float equipment to 498. O-Tex cemented with 770 sacks of Class H cement. There were 38 bbls of cement returned to the surface. The pressure test of the casing passed. |
1988226687 | 2018-07-11 | Completion Testing | No Violations | Status check inspection found the well drilling and completion process complete and the well. Crews were on site conducting completion operations on other wells on the pad. The 9.625 diameter casign well head section annular pressure was being monitored and was hooked to a flow back manifold and gas buster tank however the 13.375 diameter casing well head section annular pressure was not being monitored. The company men on site were informed to monitor all annular pressures and given a copy of the well construction rules. |