Well Details

Well ID: 34-013-21172
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Goshen Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001331
Farm/Lease Name: IRON WARRIOR
License Status: Producing
License Date: 2017-03-20
Spud Date: 2017-11-06
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2018-03-08
Well Total Depth: 17257.00 ft
Configuration: Horizontal
Latitude: 40.010000
Longitude: -81.040000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2017-02-08 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/8/2017, Expired Date:2/8/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-03-20 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:3/20/2017, Expired Date:3/20/2019 12:00:00 PM, Drilling unit acres:575.7742, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2018-03-08
Conversion to Producer 2018-05-18 UPDATE TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-06-27
Record Last Modified 2018-07-04
Construction Permit Expires 2019-03-20

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-31 9705 9874 0
2018-08-31 17103 17105 0
17103 17105 0
9705 9874 0
9705 9874 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 03/24/2018 04/05/2018 9214 15,701,200.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 APB-1 FTS International Gel breaker Listed Below
Water FTS International Carrier/Base Fluid Water 7732-18-5 100 85.1882 131,026,000.0
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
Silver 7500 P.O.P. Silverback Chemical, LLC Friction reducer Water 7732-18-5 15 0.00000309 4.757
Water 7732-18-5 89.7 0.0140309 21580.7
Hydrochloric Acid FTS International Acidizing Listed Below
Lubricating Oils (Petroleum), C20-50,

Hydrotreated Neutral Oil-Based

72623-87-1 45 0.00000928 14.27
Isotridecanol, ethoxylated 9043-30-5 2 0.00000057 0.87
Trade Secret Proprietary 1 0.00000021 0.317
Guar gum 9000-30-0 50 0.00001415 21.76
Sodium hypochlorite 7681-52-9 16 0.00250273 3849.39
Trade Secret Proprietary 5 0.00000103 1.586
Sodium hydroxide 1310-73-2 5 0.000782103 1202.94
Trade Secret Proprietary 5 0.00000103 1.586
Isotridecanol, ethoxylated 9043-30-5 2 0.00000057 0.87
Ammonium persulfate 7727-54-0 95 0.00000062 0.95
Trade Secret Proprietary 15 0.00000309 4.757
Amine Triphosphate Proprietary 30 0.00677034 10413.3
Sodium hydroxide 1310-73-2 5 0.000782103 1202.94
Sodium Phosphate, Tribasic 7601-54-9 5 0.00112839 1735.55
Ethylene Glycol 107-21-1 30 0.00006768 104.096
Ethylene Glycol 107-21-1 5 0.00112839 1735.55
Trade Secret Proprietary 1 0.00000021 0.317
Trade Secret Proprietary 40 0.00000825 12.684
Amine Triphosphate Proprietary 30 0.00677034 10413.3
Quaternary ammonium compound Proprietary 10 0.00002256 34.699
Guar gum 9000-30-0 50 0.00001415 21.76
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0224034 34458.2
Trade Secret Proprietary 40 0.00000825 12.684
Sodium Phosphate, Tribasic 7601-54-9 5 0.00112839 1735.55
Hydrochloric Acid 7647-01-0 15 0.020167 31018.4
Isopropanol 67-63-0 30 0.00006768 104.096
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.0037339 5743.03
Lubricating Oils (Petroleum), C20-50,

Hydrotreated Neutral Oil-Based

72623-87-1 45 0.00000928 14.27
Quartz 14808-60-7 4 0.00000113 1.741
Raffinates, Sorption Process 64741-85-1 55 0.00001556 23.936
Dimethylformamide 68-12-2 10 0.00002256 34.699
Silica Substrate 14808-60-7 100 14.5642 22,400,800.0
Organic amine resin salt Proprietary 30 0.00006768 104.096
Quartz 14808-60-7 4 0.00000113 1.741
Ammonium persulfate 7727-54-0 95 0.00000062 0.95
Ethylene Glycol 107-21-1 5 0.00112839 1735.55
Aromatic aldehyde Proprietary 10 0.00002256 34.699
Trade Secret Proprietary 15 0.00000309 4.757
Sodium hypochlorite 7681-52-9 16 0.00250273 3849.39
Alcohols, C11-14-iso-, C13-rich, ethoxylated 78330-21-9 5 0.0037339 5743.03
Raffinates, Sorption Process 64741-85-1 55 0.00001556 23.936
FRW-1450 FTS International Friction reducer Listed Below
HVG-1 4.0 FTS International Water gelling agent Listed Below
EC6330A FTS International Scale inhibitor Listed Below
Sand (Proppant) FTS International Proppant Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 15 0.00000309 4.757
Water 7732-18-5 89.7 0.0140309 21580.7
CI-150 FTS International Acid Corrosion Inhibitor Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-04-05 H2O 15 9588 Bbl 598417 Frac Tech Services STAGE 38/38

STAGES 2-37 SEE IMAGES

2018-04-05 H2O 15 4401 Bbl 184949 Frac Tech Services STAGE 1/38

STAGES 2-37 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 2756939 0 222
2019 RICE DRILLING D LLC 523534 0 58

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 58066 222
2019 RICE DRILLING D LLC Brine 7930 58

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1046246421 2018-8-8 0:00:0 PW No Violations 0.50
-1485586510 2018-8-27 0:00: PW No Violations 0.80
-1776644786 2018-6-21 0:00: PW No Violations 0.30
-1810740730 2018-1-4 0:00:0 CS No Violations 6.00
-202264513 2019-7-11 0:00: PW No Violations 0.30
-592146140 2018-1-12 0:00: DD No Violations 1.00
0592146140 2018-01-12 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed Patterson 582 drilling a 12.25 inch diameter hole at a depth of 7019. Company man Matt Tiker said that they were making 400 barrels of water an hour from 1300 to 2288 feet, where the 13.375 inch diameter casing was set.
1046246421 2018-08-08 Production Wells No Violations On the day of my inspection accompanied by ODNR inspector Bill Stolarik I witnessed that the well was currently in flowback operations with 2 select flowback sand traps, and a choke manifold, there was also a 500-barrel fluid storage tank hooked up to flowback equipment. The well appeared to have gauges monitoring annular pressure but were underneath water and I was unable to read them. Production equipment included an individual Gas Processing unit and 4- 400-barrel production fluid tanks, and a 100-barrel production fluid tank shared with 34013209590000, 34013209580000, 34013211730000, 34013213130000. The well pad and all equipment were within earthen containment with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tag were not present, I tried to contact EQT production superintendent Jared Lowery to inform him that they needed to be monitoring annular pressures and wells needed to be identified.
1485586510 2018-08-27 Production Wells No Violations On the day of my inspection I witnessed that the well was currently in flowback operations with 2 select flowback sand traps, and a choke manifold, there was also two 500-barrel fluid storage tank hooked up to flowback equipment. The well appeared to have gauges monitoring annular pressure but were underneath water and I was unable to read them. Production equipment included an individual Gas Processing unit and 4- 400-barrel production fluid tanks, and a 100-barrel production fluid tank shared with the other producing wells on the pad. There was a small leak on the 9.625-inch diameter casing, I spoke with EQT production superintendent John Allander and he informed me that they would send someone out to remediate the problem. Tim Hendershot arrived on location and evaluated the problem and dispatched a water truck to the pad to pump out cellars and remediate the leak. The well pad and all equipment were within earthen containment with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tag were present, and production was current.
1510158857 2017-11-08 Casing String Witnessed No Violations On site inspection to witness the conductor casing cement job found Express Energys top hole rig on location along with Express Energy cement service. The rig has drilled a 36 diameter surface borehole to a measured depth of 100 and inserted 100 of 30 diameter .375 wall casing into the well bore. The casing was cemented using a 51 barrel cement mix consisting of 275 sacks of class A cement weighing 15.6 pound per gallon by weight of scale. The cement was displaced to 90 with 75 barrels of fresh water with cement returns witnessed to surface inside the tin horn cellar.
1533754817 2018-08-08 Production Wells No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong found the well drilling and completion process now complete. The well is in the initial flow back production stages flowing trough a sand trap separator and choke manifold system, there is a 500 barrel horizontal tank present the sand trap separator is being discharged into. Annular pressure monitoring is not in place on the well head A or B sections.
1581965395 2020-2-14 0:00: PW No Violations 0.20
1735087997 2018-11-05 Preliminary Restoration No Violations Preliminary Restoration status check inspection finds the well site meets ORC 1509.072 with vegetation established and erosion control in place. The well pad and lease road surface is stone construction and in good repair. There are 5 wells total present on the pad with the # 2 & #4 being previously drilled and the #1-#3 &#5 being drilled in the 2nd round. The said well has no annular pressure monitoring or identification posted and is being flowed through a vertical sand trap separator with the fluid being ran into a temporary storage area consisting of (2) 500 barrel horizontal tanks. There is 3 gas processing units present on the pad. The permanent production fluid storage area consists of (4) steel tanks capable of holding 400 barrels fluid volume each and one horizontal 100 barrel tank, all situated inside a polymer lined steel containment dike area.
1776644786 2018-06-21 Production Wells No Violations Status check inspection on the well drilling process found the well is in production and producing off the production casing through 2 primary master valves. No production tubing will initially be set in the well bore. The well is selling into a gas processing unit. Also on site is a production facility consisting of 4 tanks of steel construction design situated inside a polymer lined steel containment dike area. There are 2 wells on the pad that were previously drilled and completed identified as the Iron Warrior # 2 and # 4 wells. 3 new wells were drilled and are in the initial flow back production stages being produced through choke manifolds and sand trap separators, these wells are identified as the Iron Warrior # 1-3 & 5 wells.
1810740730 2018-01-04 Casing String Witnessed No Violations The purpose of my inspection was to witness the cementing of the 13.375 inch diameter intermediate casing that was 2286 feet in depth. BJ Cementing was on location to complete the job. I witnessed Patterson drilling rig 582 run the last 4 joints of casing and circulate fresh water to surface while BJ was rigging up on location. The job was proposed to be performed as follows, 35 barrels of 6 percent gel, 10 barrels of fresh water, 405 barrels of class H cement, and 344 barrels of fresh water for displacement. Prior to pumping the job, BJ experience mechanical problems with the pump truck. BJ stated that they were sending out a mechanic truck to make the necessary repairs to the pump truck. Partial job witnessed.

For data sources see[10]