X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21145

Well Details

Well ID: 34-013-21145
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001444
Farm/Lease Name: DOMINATOR
License Status: Producing
License Date: 2017-02-17
Spud Date: 2017-03-19
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-07-04
Well Total Depth: 23653.00 ft
Configuration: Horizontal
Latitude: 39.940000
Longitude: -80.930000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-12-07 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:12/7/2016, Expired Date:12/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-02-17 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:2/17/2017, Expired Date:2/17/2019 12:00:00 PM, Drilling unit acres:594.3388, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2017-07-04
Correction to Well 2017-09-15 UPDATE ACREAGE/TARGET/TAKE PER AS-DRILLED PLAT
Completion Report Received 2018-07-31
Record Last Modified 2018-08-10
Construction Permit Expires 2019-02-17

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-30 10265 10402 0
2018-08-30 23525 23572 0
23525 23572 0
10265 10402 0
10265 10402 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 01/23/2018 04/08/2018 9868.89 33,638,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Silver 7500 P.O.P. Silverback Chemical, LLC Friction reducer Listed Below
KAI-12 Keane Group Acid inhibitor Listed Below
KWG-111L Keane Group Gelling agent Water 7732-18-5 50 0.0386908 124231
Water 7732-18-5 89.7 0.0143175 45971.8
Water 7732-18-5 15 0.00006259 200.968
KSI-19 Keane Group Scale inhibitor Listed Below
KWBO-2 Keane Group Breaker Listed Below
Sodium Hypochlorite Dirk Thomas Solutions Biocide Listed Below
Water Keane Group Carrier/Base Fluid Water 7732-18-5 100 87.4266 280,716,000.0
Oleic acid diethanolamide 93-83-4 2 0.00154763 4969.25
Lubricating Oils (Petroleum), C20-50,

Hydrotreated Neutral Oil-Based

72623-87-1 45 0.00018777 602.905
Trade Secret Proprietary 15 0.00006259 200.968
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0154763 49692.5
Alcohols, C7-9-iso-, C8-rich 68526-83-0 5 0.00001708 54.849
Oleic acid diethanolamide 93-83-4 2 0.00154763 4969.25
Methanol 67-56-1 30 0.00629856 20223.9
Sodium hypochlorite 7681-52-9 16 0.00255385 8200.11
Trade Secret Proprietary 15 0.00006259 200.968
Trade Secret Proprietary 40 0.000166906 535.916
Prop-2-yn-1-ol 107-19-7 5 0.00001708 54.849
Guar gum 9000-30-0 60 0.000311589 1000.47
Sodium persulfate 7775-27-1 99 0.00000403 12.946
Trade Secret Proprietary 1 0.00000417 13.398
Trade Secret Proprietary 10 0.00005193 166.746
Trade Secret Proprietary 40 0.000166906 535.916
Lubricating Oils (Petroleum), C20-50,

Hydrotreated Neutral Oil-Based

72623-87-1 45 0.00018777 602.905
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000311589 1000.47
Sodium hypochlorite 7681-52-9 16 0.00255385 8200.11
Silica Substrate 14808-60-7 100 12.2114 39,209,300.0
Ethylbenzene 100-41-4 1 0.00000342 10.97
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00154763 4969.25
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0154763 49692.5
Fatty imidazoline 61790-69-0 5 0.00001708 54.849
Methanol 67-56-1 30 0.00629856 20223.9
Trade Secret Proprietary 5 0.00002086 66.989
Guar gum 9000-30-0 60 0.000311589 1000.47
Trade Secret Proprietary 5 0.00002086 66.989
Copolymer of 2-propenamide 69418-26-4 20 0.0154763 49692.5
Hydrochloric Acid 7647-01-0 15 0.0369598 118673
Isoproyl alcohol 67-63-0 5 0.00001708 54.849
Xylene 1330-20-7 5 0.00001708 54.849
Trade Secret Proprietary 1 0.00000417 13.398
Sodium hydroxide 1310-73-2 5 0.000798078 2562.53
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.00154763 4969.25
Solvent naphtha (petroleum) heavy aliph 64742-96-7 60 0.000311589 1000.47
Methanol 67-56-1 90 0.000307478 987.275
Copolymer of 2-propenamide 69418-26-4 20 0.0154763 49692.5
Sodium persulfate 7775-27-1 99 0.00000403 12.946
Trade Secret Proprietary 10 0.00005193 166.746
Sodium hydroxide 1310-73-2 5 0.000798078 2562.53
Hydrochloric Acid Keane Group Acidizing Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Water 7732-18-5 50 0.0386908 124231
Water 7732-18-5 89.7 0.0143175 45971.8
Water 7732-18-5 15 0.00006259 200.968
KFR-23 Keane Group Friction reducer Listed Below
Sand (Proppant) Keane Group Proppant Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2018-01-23 H2O 15 6380 Bbl 200000 Keane Frac STAGE 1/79

STAGES 2-78 SEE IMAGES

2018-04-08 H2O 15 10008 Bbl 503000 Keane Frac STAGE 79/79

STAGES 2-78 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 3848148 0 184
2019 RICE DRILLING D LLC 1606974 0 88

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 129213 184
2019 RICE DRILLING D LLC Brine 37042 88

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-113429200 2018-8-27 0:00: PW No Violations 0.50
-137640108 2020-1-2 0:00:0 PW No Violations 0.20
-285703701 2020-1-2 0:00:0 PW No Violations 0.20
-639527290 2018-11-6 0:00: PW No Violations 0.50
-797813893 2020-3-25 0:00: PW No Violations 0.20
-984445491 2017-6-28 0:00: DD No Violations
0113429200 2018-08-27 Production Wells No Violations On the day of my inspection I witnessed that the well was currently in flowback operations with 2 flowback sand traps, and a choke manifold, the sand traps were tied directly to the production fluid tanks. The well appeared to have gauges monitoring annular pressure but at the time of my inspection I was unable to read them. Production equipment included an additional sand trap, an individual Gas Processing unit and 6- 500-barrel production fluid tanks, and a 100-barrel production fluid tank that was tied directly into the production sand trap all tanks were shared with the other producing wells on the pad. The well pad and all equipment were within earthen containment with secondary containment around the production tanks. There was also a small excavator on location that had replaced a well pad drain. There were multiple Emergency Shutoff Devices on location, Identification tag were not present, and production was current.
0193459496 2018-05-29 Completion Testing No Violations
0416741315 2019-03-19 Preliminary Restoration No Violations Preliminary Restoration status check inspection accompanied by ODNR Engineer Tech Anthony Carson found that the area affected by the well pad construction stable with vegetation established and erosion control in place. There is a area of the well pad that has fluid being recovered on the outward slope. To date 11 monitoring wells have been installed on the well pad surface and a 3rd party contract company identified as SE Technologies is on site sampling fluid from the monitoring wells. The employee from SE identified as Steve Gerritsen indicated he would be on site the next 2 days sampling. The Preliminary Restoration will be addressed once the area disturbed by the fluid recover is remediated and all fluid recovery has ceased. Addressing the wells. 5 wells are present on the pad and in production. All have annular pressure monitoring in place. The annular pressure is being monitored by the means of electronic transducers installed on the riser pipes attached to the well head A&B sections. The riser pipes are plumbed into a sales line that is fitted with a choke valve.
0639527290 2018-11-06 Production Wells No Violations On site inspection accompanied by ODNR Inspector Ryan Armstrong along with Supervisors Brent Bear and Mark Atkinson. The purpose of the inspection was to review the water being recovered from the North outward slope of the well pad. It was observed that a 3rd party contractor was on site with portable pumps set up at 4 locations recovering surface fluid from both on and off the well pad, the fluid was being stored in (2) steel construction 500 barrel capacity portable tanks situated on the well pad. I titrate tested the fluid found present in the recovery station points directly on the North side of the well pad at 3 different locations and found no chlorides over 496 parts per million. Addressing the well head assembly, the well is equipped with a lower A and upper B section with no pressure gauges manual or electronic visible on either well head section service outlet ports. There are (2) 7.0625 diameter completion valves install horizontally in line with each other atop the well head B section. Down stream from the master valves is an emergency shut down device. The well is being produced through temporary installed sand trap separators before the product enters the sales line point next to the well head. A gauge present on the well head assembly indicated 4,500 pound pressure on the 5.5 diameter casing. The well was producing off the 5.5 casing.
0984445491 2017-06-28 Drill / Deepen / Reopen No Violations Went to the rig and had a walk-around with the company man. A kelly hose blew the evening before and sprayed OBM for 47 seconds until it could be stopped. Approximately 1 bbl was lost but none got off the containment. A crew was on site cleaning the rig and associated equipment that got sprayed. No issues were noted on the walk around.
1378616900 2017-03-19 Casing String Witnessed No Violations
1495451156 2017-05-20 Casing String Witnessed No Violations On location to witness the cementing of the 20 surface casing. The rig ran 20 casing with all the required float equipment to a shoe depth of 513. The #8 Pittsburg coal was from 462-473. O-Tex Pumping cemented the casing with 790 sacks of Class H cement. The pressure test of the casing passed. 30 bbls of good cement were returned to the surface. See the casing ticket for the details of the job.
1614000041 2018-12-14 Production Wells No Violations On site inspection accompanied by Division Hydrology and Engineering Staff along with Supervisors Brent Bear and Mark Atkinson. Also present was representatives with EQT and Rice Drilling. The purpose of the meeting was to discuss the fluid recover efforts on the well pad slope and well pad surface along with a remediation and stabilization plan moving forward. Currently 5 wells are present in production on the well pad. Since my last inspection the company has installed annular pressure monitoring on the well head A&B sections. The pressure is being monitored with electronic gauges attached to 2 diameter riser pipes. The riser pipes are tied into 2 diameter flow lines that are plumed into the production tanks. Also present at the well head is proper identification. The wells are still producing through a 3rd party contractor choke manifold and sand trap separator. The sand trap separators are being evacuated into (2) 500 barrel production tanks separate from the production facility. Additional production equipment on site is 5 gas processing units and a production fluid facility that consists of (7) 500 barrel vertical production tanks along with one horizontal 100 barrel tank, all situated inside a polymer lined steel containment dike area. The identification on the tank battery reflected EQT as the owner however the well head identification read Rice Drilling. The well pad surface is of stone construction.
193459496 2018-5-29 0:00: CT No Violations 1.00
1986471187 2018-10-28 Production Wells No Violations Status check inspection found 5 wells on location all in the production flow back stages. All 5 wells were equipped to produce off the 5.5 production casing through 2 primary master valves with a single additional emergency shut down valve present in the production tree. All 5 wells are producing through sand trap separators with a production fluid temporary storage are set up on location consisting of (4) 500 barrel horizontal mobile tanks. Of the 5 wells present one annular pressure gauge is present and in order to indicate annular pressure monitoring is in place. No surface casing pressure relief devices are present on any of the 5 wells. During the last inspection on 08/27/2018 the DNR Inspector Ryan Armstrong noted to absence of proper well identification and on this day no well identification has been posted, also noted was the condition of the annular pressure gauges. Polymer containment is present around the well heads that the production flow back equipment is situated on, also present on the polymer containment is a diesel engine powered electrical light plant with no earthen ground present. Also present on location is a production facility consisting of (7) steel production tanks capable of holding 500 barrels fluid volume each. Multiple water trucks were present on location and in question to the destination of the produced water it was indicated they were hauling to the Goliath Well pad and staging at the Razing Kane.
416741315 2019-3-19 0:00: PL No Violations 0.20
47265516 2020-7-22 0:00: PL No Violations 0.20

For data sources see[10]

References