X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21126

Well Details

Well ID: 34-013-21126
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-001430
Farm/Lease Name: RAMMUNITION
License Status: Producing
License Date: 2017-01-24
Spud Date: 2017-02-21
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-06-19
Well Total Depth: 19071.00 ft
Configuration: Horizontal
Latitude: 39.960000
Longitude: -80.970000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-11-03 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/3/2016, Expired Date:11/3/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-01-20 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/20/2017, Expired Date:1/20/2019 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2017-01-24 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:1/24/2017, Expired Date:1/24/2019 12:00:00 PM, Drilling unit acres:420.4834, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-06-19
Correction to Well 2017-09-08 UPDATE TARGET/TAKE PER AS-DRILLED PLAT RCVD 8/24/2017 ALE.
Completion Report Received 2018-03-20
Record Last Modified 2018-04-09
Correction to Well 2018-04-13 UPDATE TAKE PER AS-DRILLED PLAT
Construction Permit Expires 2019-01-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2018-08-30 12509 0
2018-08-30 17764 17899 0
12509 0
17764 17899 0
12509 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/08/2017 12/02/2017 9802 20,157,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (Proppant) Stingray Pressure Pumping/FTS International Proppant Listed Below
Plexslick 920 Chemplex, Solvay Group Friction Reducer Listed Below
Water Stingray Pressure Pumping/FTS International Carrier/Base Fluid Water 7732-18-5 100 87.3898 168,216,000.0
NEFE-180 Chemplex, Solvay USA Inc Acid Inhibitor Listed Below
Hydrochloric Acid Stingray Pressure Pumping/FTS International Acidizing Listed Below
Other Chemical(s) Listed Above See Trade Name(s) List Listed Below
SI-117LF and SI-117LF-E Silver Creek Services Scale Inhibitor Listed Below
In-SituCide Promoter Silver Creek Services Biocide Promoter Listed Below
CI-150 FTS International Acid Corrosion Inhibitor Listed Below
Acetic Acid 64-19-7 65 0.000232773 448.065
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0113651 21876.6
Phosphino carboxylic acid polymer 71050-62-9 20 0.00161723 3113
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000888511 1710.29
Ammonium Chloride ((NH4)CI) 12125-02-9 1 0.000444256 855.146
DETA phosphonate 15827-60-8 20 0.00161723 3113
Ethylene glycol 107-21-1 40 0.00323446 6226
Copolymer of 2-Propenamide 69418-26-4 30 0.0133277 25654.4
Oleic Acid Diethanolamide 93-83-4 2 0.000888511 1710.29
Ammonium Chloride ((NH4)CI) 12125-02-9 1 0.000444256 855.146
Petroleum Distillate 64742-47-8 20 0.00888511 17102.9
Alcohols, C11-14-iso-,C13-rich, ethoxylated 78330-21-9 5 0.00189418 3646.1
Ethylene glycol 107-21-1 40 0.00323446 6226
Methanol 67-56-1 35 0.00012534 241.266
Copolymer of Maleic and Acrylic Acid 52255-49-9 70 0.0056603 10895.5
Coconut oil acid diethanolamine 68603-42-9 5 0.00001791 34.467
Coconut oil acid diethanolamine 68603-42-9 5 0.00001791 34.467
Hydrochloric Acid 7647-01-0 15 0.00365022 7026.3
DETA phosphonate 15827-60-8 20 0.00161723 3113
Ethylene glycol 107-21-1 30 0.00006695 128.88
Petroleum Distillate 64742-47-8 20 0.00888511 17102.9
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) 34690-00-1 20 0.00161723 3113
2-Ethylhexanol 104-76-7 10 0.00003581 68.933
Olefin Proprietary 5 0.00001791 34.467
Quaternary ammonium compound Proprietary 10 0.00002232 42.96
2-Ethylhexanol 104-76-7 10 0.00003581 68.933
2-Propyn-1-ol 107-19-7 5 0.00001791 34.467
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00001791 34.467
Fatty Acids, tall oil 61790-12-3 5 0.00001791 34.467
Phosphino carboxylic acid polymer 71050-62-9 20 0.00161723 3113
Dimethylformamide 68-12-2 10 0.00002232 42.96
Olefin Proprietary 5 0.00001791 34.467
Fatty Acids, tall oil 61790-12-3 5 0.00001791 34.467
Hexamethylene Triamine Penta (Methylene Phosphonic Acid) 34690-00-1 20 0.00161723 3113
Sodium Hypochlorite 7681-52-9 12.5 0.00249117 4795.24
Methanol 67-56-1 35 0.00012534 241.266
Isopropanol 67-63-0 30 0.00006695 128.88
Oleic Acid Diethanolamide 93-83-4 2 0.000888511 1710.29
Alcohols, C12-16, ethoxylated 68551-12-2 2 0.000888511 1710.29
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00001791 34.467
Copolymer of Maleic and Acrylic Acid 52255-49-9 70 0.0056603 10895.5
2-Propyn-1-ol 107-19-7 5 0.00001791 34.467
Acetic Acid 64-19-7 65 0.000232773 448.065
Silica Substrate 14808-60-7 100 12.475 24,013,100.0
Sodium Hypochlorite 7681-52-9 12.5 0.00249117 4795.24
Aromatic aldehyde Proprietary 10 0.00002232 42.96
Alcohols, C11-14-iso-,C13-rich, ethoxylated 78330-21-9 5 0.00189418 3646.1
Copolymer of 2-Propenamide 69418-26-4 30 0.0133277 25654.4
Organic amine resin salt Proprietary 30 0.00006695 128.88
Distillates (petroleum), hydrotreated light 64742-47-8 30 0.0113651 21876.6
FRW-1450 FTS International Friction Reducer Listed Below

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-11-08 H2O 15 9923 Bbl 501560 STINGRAY PRESSURE PUMPING LLC STAGE 1/48

STAGES 2-48 SEE IMAGES

2017-12-02 H2O 15 9346 Bbl 499000 Frac Tech Services STAGE 48/48

STAGES 2-47 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2018 RICE DRILLING D LLC 4243382 0 324
2019 RICE DRILLING D LLC 522191 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2018 RICE DRILLING D LLC Brine 124453 324
2019 RICE DRILLING D LLC Brine 11130 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1299060955 2017-5-17 0:00: CS No Violations
-132359064 2020-3-6 0:00:0 PW No Violations 0.20
-1526517355 2020-4-30 0:00: PW No Violations 0.20
-1942702870 2019-3-28 0:00: PL No Violations 0.20
-550061153 2017-2-21 0:00: CS No Violations 2.00
-759487274 2018-4-12 0:00: CT No Violations 0.50
0334225920 2017-01-10 Drill / Deepen / Reopen No Violations I received a call from Clay with Rice Energy to notify me that Rice anticipates to spud pad on 01/11/2017.
0550061153 2017-02-21 Casing String Witnessed No Violations
0728836089 2017-01-11 Drill / Deepen / Reopen No Violations Express Energy has begun the construction of the cellars on this pad. The plan to set all cellars then commence conductor operations following the cellar construction.
0759487274 2018-04-12 Completion Testing No Violations Status check inspection found the well drilling - stimulation and workover process complete. The well is equipped with (2) primary master valves used during the completion process that are in the open position, the valves are attached to the well head (B) section and are in the open position. Atop the master valves is a completion flow cross that is also equipped with a manually operated master valve followed by an remotely controlled emergency shut down valve. Attached to the flow cross is production flow back equipment with manually operated choke manifolds sitting in the area of the well heads controlling the outlet flow and pressure. There is a pressure valve on the flow cross that reads 5,000 (psi) pounds per square inch. On location is a total of 5 active wells all equipped in the same mannerism. Of the 5 wells only one well was equipped with one visual gauge on either of the (2) well heads sections where annular pressure can be monitored, with the (2) well head sections being the (A) section which is the 13.375 casing head section and the (B) section which is the 9.625 casing head section. All (6) cellars were standing full of fluid to surface. Situated on the well pad between the well heads and the production tank facility is a 500 barrel steel portable square tank being used to support the production flow back testing sand traps. It was observed that (2) of the outlet ports were unsecured with no cap of plug in place. The tank was inside a polymer liner that appeared to have recently overflowed with fluid, noted by the fluid level on the tank inside the liner. Attached to the top of the tank is a vent hose constructed of a crushable low pressure poly line, this line is attached at both ends with hose clamps and appears to be connected to a underground production system. Situated at the underground connection point of the tank vent is an electrical sump pump that is 110 volt (AC) alternating current design that is not explosion proof of vapor sealed. The e
1299060955 2017-05-17 Casing String Witnessed No Violations On location to witness the cementing of the 20 surface casing. The rig ran 20 casing with all the required float equipment to 576. The #8 Pittsburg coal was 526-531. O-Tex Pumping cemented the casing with 835 sacks (180 bbls) of Class H cement. Good cement was returned to the surface. The initial pressure test failed (fluid bypassing the plug) but a subsequent pressure test after the cement reached 500 psi compressive strength passed. See the casing ticket for the details.
1942702870 2019-03-28 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.72 with the area affected by the well site construction restored, vegetation is established and erosion control is in place. The well pad surface and approach is stone construction and in good repair. 5 wells are present on the pad and in production, all wells are selling off the 5.5 production casing through (2) primary master valves with emergency shut downs in the production outlet flow line. The wells are selling through sand trap separators with a temporary choke system attached to the sand trap separator. The sand trap separators are being evacuated into a single 500 barrel steel horizontal tank set in polymer containment. Permanent production equipment includes (5) gas processing units along with a production facility consisting of (6) steel 400 barrel tanks set inside a polymer lined steel containment dike area. Also present is a 3rd party mid stream facility.
334225920 2017-1-10 0:00: DD No Violations 0.50
728836089 2017-1-11 0:00: DD No Violations 1.00

For data sources see[10]

References