X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21069

Well Details

Well ID: 34-013-21069
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Smith Township
Operator Name: RICE DRILLING D LLC
Well Pad ID: US-OH-000806
Farm/Lease Name: BIGFOOT
License Status: Producing
License Date: 2016-10-05
Spud Date: 2016-10-17
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2017-02-01
Well Total Depth: 17073.00 ft
Configuration: Horizontal
Latitude: 40.020000
Longitude: -80.980000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-06-17 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:6/17/2016, Expired Date:6/17/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2016-10-05 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/5/2016, Expired Date:10/5/2018 12:00:00 PM, Drilling unit acres:176.8815, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2017-02-01
Correction to Well 2017-03-14 UPDATE TARGET/TAKEPOINT RCVD 03/14/17 RC
Completion Report Received 2017-09-27
Record Last Modified 2017-10-23
Construction Permit Expires 2018-10-05

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-09-28 9540 9677 0
2017-09-28 16868 17004 0
16868 17004 0
9540 9677 0
9540 9677 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-06-04 H2O 15 400554 Gal 500420 STINGRAY PRESSURE PUMPING LLC STAGE 44 OF 44- SEE IMAGES FOR STAGES 2-43
2017-05-20 H2O 15 409458 Gal 501140 STINGRAY PRESSURE PUMPING LLC STAGE 1 OF 44

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 RICE DRILLING D LLC 1541481 0 139
2018 RICE DRILLING D LLC 3928146 0 364
2019 RICE DRILLING D LLC 450222 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 RICE DRILLING D LLC Brine 22993 139
2018 RICE DRILLING D LLC Brine 54162 364
2019 RICE DRILLING D LLC Brine 6588 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1062746677 2016-10-5 0:00: DD No Violations 1.50
-1153303994 2020-9-22 0:00: PW No Violations 0.20
-1742820486 2016-11-21 0:00 CS No Violations
-1766026361 2019-7-11 0:00: PW No Violations 0.30
-586895242 2016-9-27 0:00: DD No Violations 0.50
-723912864 2016-10-6 0:00: DD No Violations 2.00
0229160539 2018-04-09 Production Wells No Violations The well is equipped with 5.5-inch diameter production casing. The well is currently in the flow-back stage of production. The well is connected to a sand trap. There are ten 500-barrel tanks that are lined up next to the well that are being utilized for the flow-back operation. This well has a gas processing unit on site as well. The production area on this site contains four 400-barrel production fluid holding tanks. There is also a 500-barrel tank next to the production area. Production records within RBDMS are current to 2017.
0229273415 2016-10-17 Casing String Witnessed No Violations Butchs Rat Hole had completed the drilling of the conductor portion of this well. The total depth of the 36 open hole reached was 100. The 30 conductor pipe was ran to total depth and cementing operations were preformed by O-Tex Cementing. O-Tex ran 240 sacks of Class A cement with cement returns to surface established following top out procedures.
0586895242 2016-09-27 Drill / Deepen / Reopen No Violations I received a call from Rice Energy. Planned operations are to batch drill the remaining conductors on this well pad.
0723912864 2016-10-06 Drill / Deepen / Reopen No Violations Butchs Rat Hole attempted to run the 30 conductor in the 36 open hole with no success. They had hit a ledge. They attempted to clean the hole and was unable to accomplish cleaning the ledge. The decided to cement the hole and move to another well while the cement sets up.
0978303816 2018-08-15 Production Wells No Violations On the day of my inspection I witnessed that the well was currently in flowback operations with a sand trap, and a choke manifold and ten 500-barrel portable fluid storage tank hooked up to flowback equipment. Annular pressure monitoring was in place on both the 9.625-inch diameter casing gauge read 6 pounds per square inch, the 13.375-inch diameter casing gauge read 395 pounds per square inch. Production equipment included an individual Gas Processing unit with 2 additional sand traps, and 4- 400-barrel production fluid tanks shared with the other producing wells on the pad. The well pad and all equipment were within earthen containment with secondary containment around the production tanks. There was also an additional 500-barrel portable fluid storage tank on location that was not hooked up to any other equipment and did not have secondary containment around it. There were multiple Emergency Shutoff Devices on location, Identification tag were present, and production was current.
1062746677 2016-10-05 Drill / Deepen / Reopen No Violations Butchs Rat Hole was on site drilling a 20 pilot hole on this well. Following the pilot hole they will commence drilling the 36 open hole to 100. They anticipate running the 30 conductor to total depth and cementing it following reaching total depth.
1162549321 2017-02-14 Drill / Deepen / Reopen No Violations Per request from Jake Glascock regarding complaint # 5524 I visited the well site to observe the current status of the pad. The operator was mobilizing the drilling rig and associated equipment to another site.
1221481452 2017-03-06 Surface Facility Construction No Violations During this site visit I was accompanied by Anthony Carson. Construction was underway on the outer portion of the pad. The company was reclaiming drainage areas and the sediment traps.
1475240843 2016-09-27 Drill / Deepen / Reopen No Violations Butchs Rat Hole rig has begun drilling for the conductor on this pad. The will drill a 42 open hole to a depth of 55 and cement it back to surface for stabilization. Then they will drill a 36 open hole to 100 and set conductor pipe.
1479904972 2016-11-22 Casing String Witnessed No Violations The rig ran 20 R-3 J-55 BTC casing with all the required float equipment to 432. O-Tex Pumping cemented it with 745 sacks of Class H cement. 36 bbls of good cement was returned to the surface. See the Casing Ticket for the details.
1502691282 2018-09-26 Preliminary Restoration No Violations Preliminary restoration found the well site meets ORC 1509.072 with vegetation established and erosion control in place within the effected areas of the well site boundary. The lease road and well pad are stone surface construction and in good repair. There is 5 wells on the pad that are now in production selling off the production casing with no mechanical or artificial lift technologies present. The sales line pressure at the production tree is 1,139 pounds pressure. There is annular pressure monitoring present with 71 pounds pressure on the 13.375 diameter casing well head section and 16 pounds pressure on the 9.625 diameter well head section. The production fluid facility consists of 4 steel tanks capable of holding 400 barrels fluid volume each, the tanks are situated inside a polymer lined steel containment dike area. Also present on location is 10 temporary 500 barrel steel tanks that are situated inside a polymer liner, the tanks are empty and not currently in service. Well identification is present along with hazard warning and emergency shut down devices at all critical points on the well pad.
1521790274 2020-2-7 0:00:0 PW No Violations 0.20
1742820486 2016-11-21 Casing String Witnessed No Violations On location to witness the cementing of the 20 surface casing. The rig was unable to get the casing to bottom. They aborted the surface job and pulled the casing and tripped in the hole for a clean-out run.
2086545955 2017-01-29 Administrative Inspection No Violations They reached a total measured depth of 17,073 at 10:30 PM this date.
229160539 2018-4-9 0:00:0 PW No Violations 0.50
229273415 2016-10-17 0:00 CS No Violations 5.00
978303816 2018-8-15 0:00: PW No Violations 0.50

For data sources see[9]

References