Well Details

Well ID: 34-013-21061
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Richland Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001381
Farm/Lease Name: DORSEY 210009
License Status: Producing
License Date: 2016-05-13
Spud Date: 2016-07-07
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2016-08-29
Well Total Depth: 19814.00 ft
Configuration: Horizontal
Latitude: 40.090000
Longitude: -80.860000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-05-13 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/13/2016, Expired Date:5/13/2018 12:00:00 PM, Drilling unit acres:488.005, Proposed Well Type:OG, Proposed Well Class:NWC
Reached Total Depth 2016-08-29 STATUS BASED ON PRODUCTION RCVD ALE 07-12-17.
Construction Permit Expires 2017-05-13 STATUS BASED ON PRODUCTION RCVD ALE 07-12-17.
Correction to Well 2017-07-21 UPDATE TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 7-11-17 ALE.
Completion Report Received 2017-09-15 STATUS BASED ON PRODUCTION RCVD ALE 07-12-17.
Record Last Modified 2018-07-24 STATUS BASED ON PRODUCTION RCVD ALE 07-12-17.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-09-18 10380 10523 50
2017-09-18 19521 19671 40
19521 19671 40
10380 10523 50
10380 10523 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 12/04/2016 01/21/2017 9808 23,546,100.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Gulfport Energy Corporation Carrier/Base Fluid Water 7732-18-5 100 88.9388 196,492,000.0
FRA-405 Lubrizol Friction Reducer Distillates (Petroleum), Hydrotreated Light 64742-47-8 30 0.0283962 62735.7
Water 7732-18-5 70 0.0662578 146383
X-CHEM B-84 X-Chem, LLC Biocide Ethanol 64-17-5 4 0.00127532 2817.56
Water 7732-18-5 55.5 0.017695 39093.6
Glutaraldehyde 111-30-8 27 0.00860839 19018.5
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00255063 5635.11
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00175356 3874.14
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 1.16281 2,568,990.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Coconut oil acid diethanolamine 68603-42-9 5 0.00004749 104.922
2-Ethylhexanol 104-76-7 10 0.00009498 209.843
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00004749 104.922
Fatty acids, tall oil 61790-12-3 5 0.00004749 104.922
Acetic acid 64-19-7 65 0.000617382 1363.98
Olefin Proprietary 5 0.00004749 104.922
Methanol 67-56-1 35 0.000332437 734.452
2-Propyn-1-ol 107-19-7 5 0.00004749 104.922
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0552657 122098
Water 7732-18-5 64 0.0982501 217064
Sand (40/70 Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 9.60304 21,216,000.0
X-CHEM SC-82 X-Chem, LLC Scale Inhibitor Sodium polyphosphonate Proprietary 30 0.00430405 9508.92
Water 7732-18-5 66 0.0094689 20919.6
Hydrochloric Acid 7647-01-0 3 0.000430405 950.892
Mathanol 67-56-1 1 0.000143468 316.964

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2017-01-21 H2O 15 445368 Gal 502760 Frac Tech Services
2016-12-04 H2O 15 461244 Gal 494880 Frac Tech Services

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION 4919847 0 302
2018 GULFPORT ENERGY CORPORATION 3241299 0 364
2019 GULFPORT ENERGY CORPORATION 452832 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2017 GULFPORT ENERGY CORPORATION Brine 36788 302
2018 GULFPORT ENERGY CORPORATION Brine 15620 364
2019 GULFPORT ENERGY CORPORATION Brine 2173 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-115007047 2018-3-13 0:00: UD No Violations
-1396754019 2018-2-6 0:00:0 UP No Violations 0.50
-162440440 2016-8-10 0:00: CS No Violations 4.00
-1821250260 2017-12-11 0:00 UP No Violations 1.00
-888736539 2018-3-13 0:00: PW No Violations 0.50
0115007047 2018-03-13 Urban Drill / Deepen / Reopen No Violations The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains four 400-barrel production fluid holding tanks. Annular pressures read on the gauges provided appeared to be 450 pounds on between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 250 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing . The production records within RBDMS are currently updated to 2017.
0162440440 2016-08-10 Casing String Witnessed No Violations On site to witness casing being run and cemented in place, they drilled to a depth of 358 of 24 hole and ran 358 of 18.625 casing and O-Tax cemented it in place with 530 sacks of Class H cement and they had 16 bbl. Of good cement returns to surface and casing was equipped with one guide shoe and one float collar and six centralizers.
0346880915 2017-01-24 Completion Testing No Violations The operator will be moving equipment on to the location to perform the post completion drill out and install the production tubing.
0661913981 2017-06-23 Production Wells No Violations During this inspection, I was accompanied by Brent Bear and Michael Moreland. We spoke to the well tender during our visit and discussed the wells production as well was the annular pressures noted on the backside. The annular pressure on the inside of the 9.625 inch diameter casing string was 2250 pounds per square inch. The production line from the well went to a gas processing unit also on site. The tank battery area included four 400 barrel production fluid storage tanks. The production is then routed to a scrubbing unit, through another fluid separator, and then to the contact tower before being metered and going to sale. Shane Ullom of Rice Energy stated that Rice takes over the gas sales starting at the scrubbing unit. This production from this well is being metered by both companies.
0810821360 2018-07-31 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a three-string casing design with 5.5-inch diameter production casing and 2.875-inch diameter tubing that was open flowing. Annular pressure monitoring was in place for the 9.625-inch diameter intermediate casing gauge read 200 pounds per square inch, and the 13.375-inch diameter casing gauge read 100 pounds per square inch. Production equipment included a Sand Separator, Gas Processing unit and 4- 400 barrel production fluid tanks, and a 50 barrel produced water tank shared with 34013210640000, 34013210600000, 34013210620000. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date.
0888736539 2018-03-13 Production Wells No Violations Accompanied Belmont County Inspector Andrew Corder, Reference his Report for further details
1002092592 2016-07-10 Casing String Witnessed No Violations 07/09/2016- On site inspection to witness the conductor casing cement job found Butches Rat Hole on location with a 90 x 36 conductor borehole being drilled and 90 of 26-.375 wall weld connection conductor pipe being ran. Stingray Cement service cemented the casing using 540 sacks of class A cement with circulation established prior to cementing and cement returns witnessed to surface at 40 barrels into a total of 56 barrels displacement. There was a unconsolidated area hit between the depths of 30 and 50 during drilling and solid limestone bedrock at 88.
1156094354 2016-08-15 Drill / Deepen / Reopen No Violations Pioneer 71 was drilling @ 3799 in the 12.25 open hole section of the well bore. Once total depth of this section is reached the operator will run and cement the 9.625 casing.
1396754019 2018-02-06 UrbanProduction Wells No Violations A follow up inspection conducted to check on the status of the fencing that was to be installed. The pad area is now enclosed with chain linked fence that is gated and locked. This well is equipped with 5.5-inch diameter production casing. The well is free flowing as it does not appear to have any artificial lift technology present at this time. The well is piped to a gas processing unit and then to a production area. The production area contains four 400-barrel production fluid holding tanks. The production records within RBDMS are current to 2017.
1472156668 2016-08-25 Drill / Deepen / Reopen No Violations The purpose of my inspection today is a status check on drilling operations. During my inspection the rig was at a depth of 14,180 feet. I was accompanied by ODNR inspector Andrew Corder.
1534957488 2018-08-22 UrbanPreliminary Restoration No Violations Preliminary Restoration status check inspection found the well site meets ORC 1509.072 with vegetation established and erosion control in place. The well pad perimeter is protected by a chain link fence with a gate present at the entry point of the well pad and along the lease road. Identification is present at both gates along with the entry point of the lease road. There is a midstream pipeline service point at the well pad entry point on the left side of the lease road. 4 wells are present on the well pad. The well head assembly consists of a lower A and upper B section with riser pipes present on the A&B section that is equipped with valves and gauges to monitor annular pressure. The A section which monitors the pressure between the 13.375 and 9.625 diameter casing strings shows 900 pounds per square inch (psi) on the gauge. The B section which is measuring the pressure between the 9.625 and 5.5 diameter casing strings shows 250 psi on the gauge. The 5.5 diameter casing string internal pressure is 1,500 psi and the production flow line pressure is 1,050 psi. The production tree consists of 3 manually operated valve and one emergency shut down valve. The well open flowing. Production equipment on location consists of 4 gas processing units along with a production fluid facility made up of 4 steel design tanks capable of 400 barrels fluid volume each tank. Emergency shut down control switches are present at all critical areas of the well pad.
1563550775 2019-7-18 0:00: UP No Violations 0.30
1604325945 2020-11-2 0:00: PW No Violations 0.20
1821182342 2019-04-16 UrbanProduction Wells No Violations On site inspection for training purposes with ODNR Inspector Rick Brown. Mr. Browns report will serve as the document of record for this day.
1821250260 2017-12-11 UrbanProduction Wells No Violations I was on site to follow up on the fencing that Gulfport said they would provide around the well-head and tank battery. I contacted representative Blake Arthur to inquire on why the fencing has not been installed. Blake informed me that Gulfport plans to have the fencing installed by Christmas of this year. I will follow up at a future date to confirm compliance.
1893863674 2016-08-25 Drill / Deepen / Reopen No Violations Pioneer 71 was drilling in the lateral section of the well bore @ 14,180. Once total depth is reached the 5.5 production casing will be ran and cemented.
346880915 2017-1-24 0:00: CT No Violations 1.00
441192093 2020-2-21 0:00: PW No Violations 0.20
661913981 2017-6-23 0:00: PW No Violations 1.00
810821360 2018-7-31 0:00: PW No Violations 0.50

For data sources see[10]