X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21042

Well Details

Well ID: 34-013-21042
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: York Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001362
Farm/Lease Name: VALERIE 210473
License Status: Producing
License Date: 2016-02-25
Spud Date: 2016-03-08
Spud Drilling Contractor: PIONEER DRILLING
Final Drill Date: 2016-06-28
Well Total Depth: 18668.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-02-25 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/25/2016, Expired Date:2/24/2018 12:00:00 PM, Drilling unit acres:1208.3, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2016-06-28
Correction to Well 2017-03-24 UPDATE TARGET/TAKEPOINT/ACREAGE RCVD 03/13/17 RC
Completion Report Received 2017-03-29
Record Last Modified 2017-10-23
Construction Permit Expires 2018-02-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-04-11 11562 11707 50
2017-04-11 18409 18553 40
11562 11707 50
18409 18553 40
11562 11707 50

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/20/2016 10/05/2016 10623 9,165,790.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand (40/70 White Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 7.83888 7,950,000.0
FRA-405 Lubrizol Friction Reducer Water 7732-18-5 70 0.0728181 73850.3
Distillates (Petroleum), Hydrotreated Light 64742-47-8 30 0.0312078 31650.1
Sand (100 Mesh Proppant) Taylor Frac Proppant Silica Substrate 14808-60-7 100 1.05058 1,065,470.0
X-CHEM B-84 X-Chem, LLC Biocide Water 7732-18-5 55.5 0.017672 17922.5
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00175128 1776.1
Glutaraldehyde 111-30-8 27 0.00859717 8719.04
Ethanol 64-17-5 4 0.00127366 1291.71
Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00254731 2583.42
Water Gulfport Energy Corporation Carrier/Base Fluid Water 7732-18-5 100 89.2707 90,536,100.0
Sand (40/70 Resin Proppant) Hexion Proppant Silica Substrate 14808-60-7 100 1.44772 1,468,240.0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007283 73.858
Coconut oil acid diethanolamine 68603-42-9 5 0.00007283 73.858
2-Propyn-1-ol 107-19-7 5 0.00007283 73.858
Fatty acids, tall oil 61790-12-3 5 0.00007283 73.858
Olefin Proprietary 5 0.00007283 73.858
2-Ethylhexanol 104-76-7 10 0.000145652 147.717
Acetic acid 64-19-7 65 0.000946737 960.157
Methanol 67-56-1 35 0.000509782 517.008
X-CHEM SC-82 X-Chem, LLC Scale Inhibitor Hydrochloric Acid 7647-01-0 3 0.000583052 591.317
Sodium polyphosphonate Proprietary 30 0.00583052 5913.17
Water 7732-18-5 66 0.0128271 13009
Mathanol 67-56-1 1 0.000194351 197.106
Hydrochloric Acid (28%) Oxy Acidizing Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0847235 85924.4
Water 7732-18-5 64 0.15062 152755

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-09-20 H2O 15 7131 Bbl 275340 STINGRAY PRESSURE PUMPING LLC STAGE 1/39

STAGES 2-38 SEE IMAGES

2016-10-05 H2O 10 6125 Bbl 272800 STINGRAY PRESSURE PUMPING LLC STAGE 39/39STAGES 2-38 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 587042 0 34
2017 GULFPORT ENERGY CORPORATION 5317611 0 362
2018 GULFPORT ENERGY CORPORATION 1960630 2 357
2019 GULFPORT ENERGY CORPORATION 370779 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 3592 34
2017 GULFPORT ENERGY CORPORATION Brine 39950 362
2018 GULFPORT ENERGY CORPORATION Brine 11326 357
2019 GULFPORT ENERGY CORPORATION Brine 2210 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-466157772 2020-5-21 0:00: PW No Violations 0.30
-922874919 2019-3-7 0:00:0 PW No Violations 0.20
0922874919 2019-03-07 Production Wells No Violations Status check inspection found (3) wells present and producing on the pad. All (3) are equipped with production trees with no artificial lift present and 2.875 production tubing. Annular pressure monitoring is present along with proper well identification. The production equipment consists of (3) gas processing units and a production fluid facility that housed (4) 400 barrel tanks inside a polymer lines steel containment area. Proper identification is posted at the well head and lease road entrance.
1157650465 2017-03-27 Preliminary Restoration No Violations Preliminary restoration status check inspection found the well site meets ORC 1509.072 with erosion control in place and vegetation established in the areas affected by the well pad construction. Addressing the well pad, the well pad has a earthen berm perimeter and 3 producing wells on the pad with said well now in production. The well head is equipped with annular monitoring along with an emergency shut down device controlled at 3 points on the well pad. On the well pad location is the production facility consisting of a total of 4 steel production tanks capable of holding 400 barrels of fluid each, the tanks are located inside a polymer lined steel containment dike area.
1171715545 2016-06-05 Casing String Witnessed No Violations On this day Pioneer 71 had reached total depth of the 24 section of this well @ 585. The 18.625 casing was ran and cemented to total depth with bow spring centralizers utilized to provide proper standoff from the well bore. O-Tex was on site and cemented the casing with 830 sacks of Class H cement. Cement returns to surface were established.
1392834474 2018-08-20 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a 3-string casing design with 5.5-inch diameter production casing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place for the 9.625-inch diameter intermediate casing gauge read 0 pounds per square inch, and the 13.375-inch diameter casing gauge read 0 pounds per square inch. Production equipment included a Sand Separator, Gas Processing unit and four 400-barrel production fluid tanks, and a 50-barrel produced water tank shared with the other producing wells on the well pad. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date.
1462975298 2016-05-09 Preliminary Restoration No Violations I visited this pad and performed a preliminary restoration inspection. Vegetation has been established and the erosion and sediment controls appear to be functioning properly. Preliminary restoration for this site has passed.
1465397513 2016-06-07 Casing String Witnessed No Violations

-

1625959718 2016-06-05 Drill / Deepen / Reopen No Violations This well was repermitted as the Valerie 4C.
2065022623 2020-10-27 0:00 PW No Violations 0.20

For data sources see[10]

References