If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-21009 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.96,"lon":-80.84,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: US-OH-001341 | |
Farm/Lease Name: KRNYAICH UNIT B | |
License Status: Producing | |
License Date: 2015-12-17 | |
Spud Date: 2015-11-20 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2016-01-19 | |
Well Total Depth: 18140.00 ft | |
Configuration: Horizontal | |
Latitude: 39.960000 | |
Longitude: -80.840000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-11-17 | Proposed Formations:TRENTON, Issued Date:11/17/2015, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-12-17 | Proposed Formations:POINT PLEASANT, Issued Date:12/17/2015, Expired Date:12/16/2017 12:00:00 PM, Drilling unit acres:170.617, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-01-19 | |
Correction to Well | 2016-04-22 | CHANGE IN TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE |
Completion Report Received | 2017-03-08 | |
Construction Permit Expires | 2017-12-16 | |
Record Last Modified | 2017-12-29 | |
Correction to Well | 2018-01-05 | UPDATE ACREAGE |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2017-03-08 | 11003 | 17810 | 0 |
11003 | 17810 | 0 | |
11003 | 17810 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-09-23 | H2O | 15 | 11625 Bbl | 468301 | Halliburton | STAGE 1/34
60 SHOTS STAGES 2-33 SEE IMAGES |
2016-10-16 | H2O | 15 | 10943 Bbl | 3866412 | Halliburton | STAGE 34/34
48 SHOTS |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | 0 | 0 | 0 |
2017 | XTO ENERGY INC. | 3207342 | 0 | 353 |
2018 | XTO ENERGY INC. | 1162286 | 0 | 214 |
2019 | XTO ENERGY INC. | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | XTO ENERGY INC. | Brine | 0 | 0 |
2017 | XTO ENERGY INC. | Brine | 36650 | 353 |
2018 | XTO ENERGY INC. | Brine | 13715 | 214 |
2019 | XTO ENERGY INC. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-14942878 | 2017-6-7 0:00:0 | CT | No Violations | 0.50 |
-1619099733 | 2016-1-11 0:00: | CS | No Violations | 2.00 |
-1783626610 | 2016-1-12 0:00: | DD | No Violations | 1.00 |
-275928385 | 2016-1-26 0:00: | PL | No Violations | 1.00 |
-381512548 | 2020-4-16 0:00: | PW | No Violations | 0.20 |
-577936769 | 2018-8-1 0:00:0 | PW | No Violations | 0.50 |
-951401272 | 2016-1-7 0:00:0 | DD | No Violations | 0.50 |
0014942878 | 2017-06-07 | Completion Testing | No Violations | On the day of my inspection the well appeared to be in the flow back phase. The well was connected to a sand separator and a 500 barrel fluid holding tank. The tank battery consisted of five 400 barrel production fluid holding tanks and gas processing units. |
0275928385 | 2016-01-26 | Preliminary Restoration | No Violations | On this day I was on site to witness a casing job. During my visit I reviewed the sites preliminary restoration efforts. The site was appeared to be in satisfactory condition with proper erosion and sediment controls in place. This sites preliminary restoration is passed. |
0577936769 | 2018-08-01 | Production Wells | No Violations | On the day of my inspection I witnessed that KLX energy, Starett Energy Services, and Shale Pro were currently on location. After speaking with Matt Thomas, Completions Foreman for XTO Energy he informed me that they had set a retrievable plug at 9067 feet inside the 2.875-inch diameter tubing as well as a Valve Removal plug on the B section of the well head. There was also a 2-way check valve installed on the tubing hanger. Matt informed me that once SIMOPS was completed they will be covering the wellheads with steel cages. XTO Energy plans to move the Auger rig on to set cellars and conductors on 8/2/2018. |
0951401272 | 2016-01-07 | Drill / Deepen / Reopen | No Violations | |
1007079060 | 2015-11-20 | Casing String Witnessed | No Violations | |
1428420238 | 2019-01-15 | Production Wells | No Violations | Status check inspection found the said well currently shut in with a Back Pressure valve in the tubing hanger and VR plugs in both B section 2 outlet ports. The well is equipped with a production tree. The flow line has been disconnected and a steel cage is over the well while the newer 4 wells on the pad is being completed. |
1566918305 | 2019-8-27 0:00: | PW | No Violations | 0.20 |
1619099733 | 2016-01-11 | Casing String Witnessed | No Violations | |
1783626610 | 2016-01-12 | Drill / Deepen / Reopen | No Violations |
For data sources see[9]