X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-21009

Well Details

Well ID: 34-013-21009
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-001341
Farm/Lease Name: KRNYAICH UNIT B
License Status: Producing
License Date: 2015-12-17
Spud Date: 2015-11-20
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2016-01-19
Well Total Depth: 18140.00 ft
Configuration: Horizontal
Latitude: 39.960000
Longitude: -80.840000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-11-17 Proposed Formations:TRENTON, Issued Date:11/17/2015, Expired Date:11/16/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
APP 2015-12-17 Proposed Formations:POINT PLEASANT, Issued Date:12/17/2015, Expired Date:12/16/2017 12:00:00 PM, Drilling unit acres:170.617, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-01-19
Correction to Well 2016-04-22 CHANGE IN TARGET/TAKEPOINT PER AS DRILLED PLAT-ALE
Completion Report Received 2017-03-08
Construction Permit Expires 2017-12-16
Record Last Modified 2017-12-29
Correction to Well 2018-01-05 UPDATE ACREAGE

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2017-03-08 11003 17810 0
11003 17810 0
11003 17810 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-09-23 H2O 15 11625 Bbl 468301 Halliburton STAGE 1/34

60 SHOTS STAGES 2-33 SEE IMAGES

2016-10-16 H2O 15 10943 Bbl 3866412 Halliburton STAGE 34/34

48 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 XTO ENERGY INC. 0 0 0
2017 XTO ENERGY INC. 3207342 0 353
2018 XTO ENERGY INC. 1162286 0 214
2019 XTO ENERGY INC. 0 0 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 XTO ENERGY INC. Brine 0 0
2017 XTO ENERGY INC. Brine 36650 353
2018 XTO ENERGY INC. Brine 13715 214
2019 XTO ENERGY INC. Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-14942878 2017-6-7 0:00:0 CT No Violations 0.50
-1619099733 2016-1-11 0:00: CS No Violations 2.00
-1783626610 2016-1-12 0:00: DD No Violations 1.00
-275928385 2016-1-26 0:00: PL No Violations 1.00
-381512548 2020-4-16 0:00: PW No Violations 0.20
-577936769 2018-8-1 0:00:0 PW No Violations 0.50
-951401272 2016-1-7 0:00:0 DD No Violations 0.50
0014942878 2017-06-07 Completion Testing No Violations On the day of my inspection the well appeared to be in the flow back phase. The well was connected to a sand separator and a 500 barrel fluid holding tank. The tank battery consisted of five 400 barrel production fluid holding tanks and gas processing units.
0275928385 2016-01-26 Preliminary Restoration No Violations On this day I was on site to witness a casing job. During my visit I reviewed the sites preliminary restoration efforts. The site was appeared to be in satisfactory condition with proper erosion and sediment controls in place. This sites preliminary restoration is passed.
0577936769 2018-08-01 Production Wells No Violations On the day of my inspection I witnessed that KLX energy, Starett Energy Services, and Shale Pro were currently on location. After speaking with Matt Thomas, Completions Foreman for XTO Energy he informed me that they had set a retrievable plug at 9067 feet inside the 2.875-inch diameter tubing as well as a Valve Removal plug on the B section of the well head. There was also a 2-way check valve installed on the tubing hanger. Matt informed me that once SIMOPS was completed they will be covering the wellheads with steel cages. XTO Energy plans to move the Auger rig on to set cellars and conductors on 8/2/2018.
0951401272 2016-01-07 Drill / Deepen / Reopen No Violations
1007079060 2015-11-20 Casing String Witnessed No Violations
1428420238 2019-01-15 Production Wells No Violations Status check inspection found the said well currently shut in with a Back Pressure valve in the tubing hanger and VR plugs in both B section 2 outlet ports. The well is equipped with a production tree. The flow line has been disconnected and a steel cage is over the well while the newer 4 wells on the pad is being completed.
1566918305 2019-8-27 0:00: PW No Violations 0.20
1619099733 2016-01-11 Casing String Witnessed No Violations
1783626610 2016-01-12 Drill / Deepen / Reopen No Violations

For data sources see[9]

References