X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20998

Well Details

Well ID: 34-013-20998
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001327
Farm/Lease Name: CONWAY 210119
License Status: Producing
License Date: 2015-10-23
Spud Date: 2015-10-27
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2016-01-19
Well Total Depth: 18052.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -80.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-23 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/23/2015, Expired Date:10/22/2017 12:00:00 PM, Drilling unit acres:566.943, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2016-01-19
Correction to Well 2016-06-03 CHANGE IN ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE
Completion Report Received 2016-10-26
Construction Permit Expires 2017-10-22
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-19 10372 17886 0
10372 17886 0
10372 17886 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/01/2016 04/29/2016 9726 8,172,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 mesh Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 0.60567 0
40/70 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 10.5426 0
Plexsurf 215E Chemplex SOLVAY Demulsifier Water 7732-18-5 64 0.0005 0
Methanol 67-56-1 30 0.00023 0
Alcohol, C12-13, ethoxylated 66455-14-9 1 0.00001000 0
Alkyl(C9-11) alcohol,ethoxylated 68439-46-3 5 0.00004000 0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control 2-Propyn-1-ol 107-19-7 5 0.00008000 0
2-Ethylhexanol 104-76-7 10 0.00015 0
Methanol 67-56-1 35 0.00054 0
Acetic acid 64-19-7 65 0.00101 0
Olefin Proprietary 5 0.00008000 0
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00008000 0
Coconut oil acid diethanolamine 68603-42-9 5 0.00008000 0
Fatty acids, tall oil 61790-12-3 5 0.00008000 0
Fresh water Gulfport Energy Carrier/Based Fluid Water 7732-18-5 100 88.6218 0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 64 0.16098 0
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.09055 0
FRA-409 Lubrizol Friction Reducer Alkanolamide 93-83-4 2 0.00178 0
Copolymer of 2-propenamide Proprietary 30 0.2675 0
Ammonium Chloride 12125-02-9 1 0.00089 0
Other components below reportable levels Proprietary 60 0.05349 0
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00178 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.01783 0
MX 2-3013 Scale Inhibitor Multi-Chem Scale Inhibitor Ammonium chloride 12125-02-9 30 0.0054 0
Water 7732-18-5 10 0.0018 0
Organic phosphonate Proprietary 60 0.0108 0
B-8626 Multi-Chem Biocide Ethyl hydroxide 64-17-5 5 0.00187 0
Glutaraldehyde 111-30-8 30 0.01121 0
Water 7732-18-5 51 0.01906 0
Didecyldimethylammonium chloride 7173-51-5 10 0.00374 0
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 4 0.00149 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-04-01 H2O 0 186144 Gal 157400 STINGRAY PRESSURE PUMPING LLC STAGE 1/43

50 SHOTS STAGES 2-42 SEE IMAGES

2016-04-29 H2O 10 203952 Gal 199200 STINGRAY PRESSURE PUMPING LLC STAGE 43/43

50 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 3097601 0 190
2017 GULFPORT ENERGY CORPORATION 2949627 0 364
2018 GULFPORT ENERGY CORPORATION 1296098 0 362
2019 GULFPORT ENERGY CORPORATION 295211 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 27024 190
2017 GULFPORT ENERGY CORPORATION Brine 15350 364
2018 GULFPORT ENERGY CORPORATION Brine 8784 362
2019 GULFPORT ENERGY CORPORATION Brine 2225 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-114337182 2016-1-12 0:00: DD No Violations 1.00
-1398864513 2016-1-7 0:00:0 DD No Violations 1.00
-2085612784 2016-1-11 0:00: DD No Violations 2.00
-410828277 2016-1-4 0:00:0 DD No Violations
-420107262 2016-1-19 0:00: DD No Violations 1.50
-712684957 2017-10-19 0:00 PW No Violations 1.00
-775637036 2020-1-27 0:00: PW No Violations 0.50
-842849389 2016-1-20 0:00: DD No Violations 1.00
0114337182 2016-01-12 Drill / Deepen / Reopen No Violations
0135401291 2018-07-31 Preliminary Restoration No Violations Preliminary restoration status check inspection found the area affected by the well pad construction has erosion control in place and vegetation established, the well pad surface and lease road are of stone construction and are in good repair. The entry point of the well pad is gated and locked with proper well site identification posted at the entry point of the lease road. There is an earthen berm established around the well pad and the company is controlling any collected surface water from rain events. There are a total of 5 wells on the pad that are in production at this time. The company has emergency shut down master control buttons and fire extinguishers place at all critical points on the well pad. The well head assembly consists of a lower B section and upper A section along with a production tree assembly. There are riser pipes with valves and manual pressure gauges attached to the A & B section that is allowing the company to monitor annular pressure. The pressure on the A section which monitors the pressure between the 13.375 diameter surface casing and 9.625 diameter intermediate casing string is currently 125 pounds per square inch (psi) and the pressure on the B section which is the pressure between the 5.5 diameter production casing and the 9.625 diameter intermediate casing is 750 pounds pressure. The 5.5 diameter production casing internal working pressure is 1,500 psi and the production flowline pressure is 1,000 psi. There is an emergency shut down master control device on the production flowline downstream from the production tree manual control valves. There is a total of 5 gas processing units on the well pad one for each well. On the back right hand corner of the well pad is the production fluid storage tank farm consisting of (4) steel construction 400 barrel tanks situated inside a polymer lined steel containment dike area. There is also a EQT midstream station next to the well pad entry point.
0410828277 2016-01-04 Drill / Deepen / Reopen No Violations On this day H&P Rig # 628 was in the second intermediate section of the well bore with a 12.25 drill bit. They were at a measured depth of 6645. They lacked approx. 2400 to reach their total depth. Once total depth is reached they will run and cement their 9.625 casing string.
0420107262 2016-01-19 Drill / Deepen / Reopen No Violations
0712684957 2017-10-19 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400-barrel production fluid holding tanks. Per signage, it appears that Rice Energy is conducting midstream operations on this site. Production records for this well are current to 2017 within RBDMS.
0842849389 2016-01-20 Drill / Deepen / Reopen No Violations
135401291 2018-7-31 0:00: PL No Violations 0.20
1398864513 2016-01-07 Drill / Deepen / Reopen No Violations

-

1609624828 2016-01-06 Drill / Deepen / Reopen No Violations On this day H&P Rig # 628 was approaching total depth of the 12.25 section of this well bore. The 9.625 casing is anticipated to be ran and cemented tomorrow.
1836004021 2016-01-19 Drill / Deepen / Reopen No Violations On my inspection today with MRI Andrew Corder, we found the H&P Rig 628 had reached total measured depth of 18,052 feet and was in the process of setting in place their 5.5 inch production casing. A walk-around inspection of the well pad indicated good placement and maintenance of secondary containment.
2085612784 2016-01-11 Drill / Deepen / Reopen No Violations
271698646 2020-10-20 0:00 PW No Violations 0.20
539213946 2020-1-22 0:00: PW No Violations 0.50
862265290 2020-1-22 0:00: PW No Violations 0.30

For data sources see[10]

References