X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20997

Well Details

Well ID: 34-013-20997
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001327
Farm/Lease Name: CONWAY 210119
License Status: Producing
License Date: 2015-10-23
Spud Date: 2015-10-27
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2015-12-24
Well Total Depth: 17540.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -80.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-23 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/23/2015, Expired Date:10/22/2017 12:00:00 PM, Drilling unit acres:566.943, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2015-12-24
Correction to Well 2016-06-03 CHANGE IN ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE
Completion Report Received 2016-10-26
Construction Permit Expires 2017-10-22
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-19 10066 17417 0
10066 17417 0
10066 17417 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/15/2016 04/29/2016 9713 7,897,970.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Coconut oil acid diethanolamine 68603-42-9 5 0.00007000 0
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007000 0
Olefin Proprietary 5 0.00007000 0
Acetic acid 64-19-7 65 0.00089 0
2-Propyn-1-ol 107-19-7 5 0.00007000 0
Fatty acids, tall oil 61790-12-3 5 0.00007000 0
2-Ethylhexanol 104-76-7 10 0.00014 0
Methanol 67-56-1 35 0.00048 0
B-8626 Multi-Chem Biocide Glutaraldehyde 111-30-8 30 0.01115 0
Water 7732-18-5 51 0.01896 0
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 4 0.00149 0
Didecyldimethylammonium chloride 7173-51-5 10 0.00372 0
Ethyl hydroxide 64-17-5 5 0.00186 0
100 mesh Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 0.59868 0
FRA-409 Lubrizol Friction Reducer Other components below reportable levels Proprietary 60 0.05044 0
Ammonium Chloride 12125-02-9 1 0.00084 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.01681 0
Alkanolamide 93-83-4 2 0.00168 0
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00168 0
Copolymer of 2-propenamide Proprietary 30 0.02522 0
Plexsurf 215E Chemplex SOLVAY Demulsifier Methanol 67-56-1 30 0.00029 0
Alkyl(C9-11) alcohol,ethoxylated 68439-46-3 5 0.00005000 0
Alcohol, C12-13, ethoxylated 66455-14-9 1 0.00001000 0
Water 7732-18-5 64 0.00062 0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 64 0.14205 0
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0799 0
MX 2-3013 Scale Inhibitor Multi-Chem Scale Inhibitor Ammonium chloride 12125-02-9 30 0.00534 0
Organic phosphonate Proprietary 60 0.01068 0
Water 7732-18-5 10 0.00178 0
Fresh water Gulfport Energy Carrier/Based Fluid Water 7732-18-5 100 88.622 0
40/70 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 10.5663 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-04-29 H2O 0 199290 Gal 200820 STINGRAY PRESSURE PUMPING LLC STAGE 41/41

50 SHOTS

2016-04-15 H2O 0 192444 Gal 206320 STINGRAY PRESSURE PUMPING LLC STAGE 1/41

50 SHOTS STAGES 2-40 SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 2981332 0 190
2017 GULFPORT ENERGY CORPORATION 2178380 0 364
2018 GULFPORT ENERGY CORPORATION 890416 0 357
2019 GULFPORT ENERGY CORPORATION 212286 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 24118 190
2017 GULFPORT ENERGY CORPORATION Brine 10584 364
2018 GULFPORT ENERGY CORPORATION Brine 5314 357
2019 GULFPORT ENERGY CORPORATION Brine 1394 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1006566614 2017-10-19 0:00 PW No Violations 1.00
-2122113283 2020-1-22 0:00: PW No Violations 0.50
-244201399 2020-10-20 0:00 PW No Violations
1006566614 2017-10-19 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400-barrel production fluid holding tanks. Per signage, it appears that Rice Energy is conducting midstream operations on this site. Production records for this well are current to 2017 within RBDMS.
1084887600 2018-07-31 Preliminary Restoration No Violations Preliminary restoration status check inspection found the area affected by the well pad construction has erosion control in place and vegetation established, the well pad surface and lease road are of stone construction and are in good repair. The entry point of the well pad is gated and locked with proper well site identification posted at the entry point of the lease road. There is an earthen berm established around the well pad and the company is controlling any collected surface water from rain events. There are a total of 5 wells on the pad that are in production at this time. The company has emergency shut down master control buttons and fire extinguishers place at all critical points on the well pad. The well head assembly consists of a lower B section and upper A section along with a production tree assembly. There are riser pipes with valves and manual pressure gauges attached to the A & B section that is allowing the company to monitor annular pressure. The pressure on the A section which monitors the pressure between the 13.375 diameter surface casing and 9.625 diameter intermediate casing string is currently 350 pounds per square inch (psi) and the pressure on the B section which is the pressure between the 5.5 diameter production casing and the 9.625 diameter intermediate casing is 400 pounds pressure. The 5.5 diameter production casing internal working pressure is 1000 psi and the production flowline pressure is 1,100 psi. There is an mechanical lift master control device on the production flowline downstream from the production tree manual control valves and a artificial lift system on the production tree. There is a total of 5 gas processing units on the well pad one for each well. On the back right hand corner of the well pad is the production fluid storage tank farm consisting of (4) steel construction 400 barrel tanks situated inside a polymer lined steel containment dike area. There is also a EQT midstream station next to the well pad entry po
1592558681 2015-12-08 Drill / Deepen / Reopen No Violations H&P rig 628 is currently drilling the 12.25 open hole section. Once this section reaches a total depths the 9.625 casing will be ran and cemented.
1674973827 2020-1-22 0:00: SC No Violations 0.50
1841088581 2020-1-27 0:00: PW No Violations 0.50

For data sources see[10]

References