34-013-20996

Well Details

Well ID: 34-013-20996
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001327
Farm/Lease Name: CONWAY 210119
License Status: Producing
License Date: 2015-10-23
Spud Date: 2015-10-26
Spud Drilling Contractor: H&P DRILLING
Final Drill Date: 2015-12-01
Well Total Depth: 10320.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -80.940000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-10-23 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:10/23/2015, Expired Date:10/22/2017 12:00:00 PM, Drilling unit acres:566.943, Proposed Well Type:OG, Proposed Well Class:EOUT
Reached Total Depth 2015-12-01
Correction to Well 2016-06-03 CHANGE IN ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE
Completion Report Received 2016-10-27
Construction Permit Expires 2017-10-22
Record Last Modified 2018-01-25

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-12-19 10160 17590 0
10160 17590 0
10160 17590 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 04/15/2016 04/29/2016 9700 8,057,410.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 40/80 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 0.02699 0
B-8626 Multi-Chem Biocide Glutaraldehyde 111-30-8 30 0.0036 0
Didecyldimethylammonium chloride 7173-51-5 10 0.0045 0
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 4 0.04588 0
Water 7732-18-5 51 0.00535 0
Ethyl hydroxide 64-17-5 5 0.0107 0
Fresh water Gulfport Energy Carrier/Based Fluid Water 7732-18-5 100 88.5741 0
MX 2-3013 Scale Inhibitor Multi-Chem Scale Inhibitor Ammonium chloride 12125-02-9 30 0.00032 0
Water 7732-18-5 10 0.00005000 0
Organic phosphonate Proprietary 60 0.00178 0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control 2-Propyn-1-ol 107-19-7 5 0.00007000 0
Fatty acids, tall oil 61790-12-3 5 0.00007000 0
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00007000 0
Methanol 67-56-1 35 0.00007000 0
Acetic acid 64-19-7 65 0.00015 0
Coconut oil acid diethanolamine 68603-42-9 5 0.00007000 0
Olefin Proprietary 5 0.00007000 0
2-Ethylhexanol 104-76-7 10 0.00007000 0
Plexsurf 215E Chemplex SOLVAY Demulsifier Water 7732-18-5 64 0.00051 0
Alkyl(C9-11) alcohol,ethoxylated 68439-46-3 5 0.00069 0
Methanol 67-56-1 30 0.00001000 0
Alcohol, C12-13, ethoxylated 66455-14-9 1 0.00095 0
FRA-409 Lubrizol Friction Reducer Alkanolamide 93-83-4 2 0.00176 0
Distillates (Petroleum), Hydrotreated Light 64742-47-8 20 0.01756 0
Ammonium Chloride 12125-02-9 1 0.00088 0
Other components below reportable levels Proprietary 60 0.05268 0
Copolymer of 2-propenamide Proprietary 30 0.02634 0
Alcohols, C12-16, Ethoxylated 68551-12-2 2 0.00176 0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 64 0.15073 0
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.08478 0
40/70 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 10.5801 0
30/50 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 0.009 0
100 mesh Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 0.59762 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-04-15 H2O 15 4321 Bbl 201060 STINGRAY PRESSURE PUMPING LLC STAGE 1/42

SHOTS STAGES 2-41 SEE IMAGES

2016-04-29 H2O 10 5177 Bbl 200460 STINGRAY PRESSURE PUMPING LLC STGE 41/41

50 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 2989680 0 190
2017 GULFPORT ENERGY CORPORATION 2048043 0 351
2018 GULFPORT ENERGY CORPORATION 746989 0 348
2019 GULFPORT ENERGY CORPORATION 196786 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 47943 190
2017 GULFPORT ENERGY CORPORATION Brine 13855 351
2018 GULFPORT ENERGY CORPORATION Brine 3480 348
2019 GULFPORT ENERGY CORPORATION Brine 254 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1420782484 2020-1-22 0:00: PW No Violations 0.50
-1725334745 2015-11-9 0:00: CS No Violations 8.00
-379199045 2015-12-1 0:00: DD No Violations 2.00
-969125263 2018-7-31 0:00: PL No Violations 0.20
0233720429 2017-10-19 Production Wells No Violations
0379199045 2015-12-01 Drill / Deepen / Reopen No Violations On this day H&P rig 628 had reached total depth of the lateral section and had tripped out of the hole. Wyoming Casing crew was on site running the 5.5 production casing string.
0474788717 2017-09-20 Production Wells No Violations I responded to a spill reported on this site by Gulfport Energy representative, Brad Burwell. There was a mechanical failure at the gas separation unit and there was an estimated 100 gallons of production fluid dispersed onto the pad surface. The operator had dispatch the cleanup and remediation crews and they were in route. The operator plans to flush the area with fresh water and utilize vacuum trucks to remove the production water. They will screen the area until the water reaches an acceptable level. The outflow drains were shut and will be monitored prior to releasing water accumulated from rain events to ensure that the water is acceptable to be released from the outflow drains.
0969125263 2018-07-31 Preliminary Restoration No Violations Preliminary restoration status check inspection found the area affected by the well pad construction has erosion control in place and vegetation established, the well pad surface and lease road are of stone construction and are in good repair. The entry point of the well pad is gated and locked with proper well site identification posted at the entry point of the lease road. There is an earthen berm established around the well pad and the company is controlling any collected surface water from rain events. There are a total of 5 wells on the pad that are in production at this time. The company has emergency shut down master control buttons and fire extinguishers place at all critical points on the well pad. The well head assembly consists of a lower B section and upper A section along with a production tree assembly. There are riser pipes with valves and manual pressure gauges attached to the A & B section that is allowing the company to monitor annular pressure. The pressure on the A section which monitors the pressure between the 13.375 diameter surface casing and 9.625 diameter intermediate casing string is currently 400 pounds per square inch (psi) and the pressure on the B section which is the pressure between the 5.5 diameter production casing and the 9.625 diameter intermediate casing is 200 pounds pressure. The 5.5 diameter production casing internal working pressure is 1000 psi and the production flowline pressure is 1,100 psi. There is an mechanical lift master control device on the production flowline downstream from the production tree manual control valves and a artificial lift system on the production tree. There is a total of 5 gas processing units on the well pad one for each well. On the back right hand corner of the well pad is the production fluid storage tank farm consisting of (4) steel construction 400 barrel tanks situated inside a polymer lined steel containment dike area. There is also a EQT midstream station next to the well pad entry po
1214717544 2020-10-20 0:00 PW No Violations 0.20
1450367041 2015-12-16 Preliminary Restoration No Violations Vegetation has been established at this well site. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed.
1583165986 2020-1-27 0:00: PW No Violations 0.50
1725334745 2015-11-09 Casing String Witnessed No Violations On this day H&P 628 had reached a total depth of 508. The 18.625 casing was ran and cemented into a 24 open hole. Stingray Cementing was on site to cement the casing with 760 sacks of Class A cement with cement returns to surface established. See cement ticket for details.
233720429 2017-10-19 0:00 PW No Violations 1.00
474788717 2017-9-20 0:00: PW No Violations 1.00
855831304 2020-1-22 0:00: PW No Violations 0.50

For data sources see[10]

References