If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20971 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.94,"lon":-81.11,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Wayne Township | |
Operator Name: GULFPORT APPALACHIA LLC | |
Well Pad ID: US-OH-001317 | |
Farm/Lease Name: WARRICK 210008 | |
License Status: Producing | |
License Date: 2015-09-23 | |
Spud Date: 2015-10-09 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2015-10-25 | |
Well Total Depth: 17746.00 ft | |
Configuration: Horizontal | |
Latitude: 39.940000 | |
Longitude: -81.110000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-09-23 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:9/23/2015, Expired Date:9/22/2017 12:00:00 PM, Drilling unit acres:481.926, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2015-10-25 | |
Correction to Well | 2016-06-03 | CHANGE IN TARGET/TAKEPOINT PER AS-DRILLED PLAT-ALE |
Completion Report Received | 2016-12-16 | |
Construction Permit Expires | 2017-09-22 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-20 | 9400 | 17594 | 0 |
9400 | 17594 | 0 | |
9400 | 17594 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 06/25/2016 | 07/15/2016 | 9004 | 9,165,790.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Gulfport Energy Corporation | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.0295 | 86,246,800.0 |
NEFE-180 | Chemplex | Corrosion Inhibitor/Iron Control | Alcohols, C14-15, ethoxylated | 68951-67-7 | 5 | 0.00004933 | 48.33 | |
Acetic acid | 64-19-7 | 65 | 0.000641277 | 628.291 | ||||
Fatty acids, tall oil | 61790-12-3 | 5 | 0.00004933 | 48.33 | ||||
Coconut oil acid diethanolamine | 68603-42-9 | 5 | 0.00004933 | 48.33 | ||||
2-Propyn-1-ol | 107-19-7 | 5 | 0.00004933 | 48.33 | ||||
Olefin | Proprietary | 5 | 0.00004933 | 48.33 | ||||
Methanol | 67-56-1 | 35 | 0.000345303 | 338.31 | ||||
2-Ethylhexanol | 104-76-7 | 10 | 0.00009866 | 96.66 | ||||
Sand (100 Mesh Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 1.07497 | 1,053,200.0 | |
Sand (40/70 Proppant) | Taylor Frac | Proppant | Silica Substrate | 14808-60-7 | 100 | 10.6157 | 10,400,700.0 | |
X-CHEM B-84 | X-Chem, LLC | Biocide | Glutaraldehyde | 111-30-8 | 27 | 0.00908164 | 8897.73 | |
Water | 7732-18-5 | 55.5 | 0.0186678 | 18289.8 | ||||
Ethanol | 64-17-5 | 4 | 0.00134543 | 1318.18 | ||||
Didecyl dimethyl ammonium chloride | 7173-51-5 | 8 | 0.00269086 | 2636.37 | ||||
n-Alkyl dimethyl benzyl ammonium chloride | 68424-85-1 | 5.5 | 0.00184996 | 1812.5 | ||||
X-CHEM SC-82 | X-Chem, LLC | Scale Inhibitor | Mathanol | 67-56-1 | 1 | 0.000142675 | 139.785 | |
Hydrochloric Acid | 7647-01-0 | 3 | 0.000428024 | 419.356 | ||||
Water | 7732-18-5 | 66 | 0.00941653 | 9225.84 | ||||
Sodium polyphosphonate | Proprietary | 30 | 0.00428024 | 4193.56 | ||||
Hydrochloric Acid (28%) | Oxy | Acidizing | Water | 7732-18-5 | 64 | 0.101532 | 99475.6 | |
Hydrochloric Acid (Hydrogen Chloride) | 7732-18-5 | 36 | 0.0571116 | 55955 | ||||
FRA-409 | Lubrizol | Friction Reducer | Alcohols, C12-16, Ethoxylated | 68551-12-2 | 2 | 0.0014475 | 1418.19 | |
Alkanolamide | 93-83-4 | 2 | 0.0014475 | 1418.19 | ||||
Ammonium Chloride | 12125-02-9 | 1 | 0.000723752 | 709.096 | ||||
Copolymer of 2-propenamide | Proprietary | 30 | 0.0217126 | 21272.9 | ||||
Distillates (Petroleum), Hydrotreated Light | 64742-47-8 | 20 | 0.014475 | 14181.9 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-06-25 | H2O | 15 | 254646 Gal | 262099 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/46
50 SHOTS STAGES 2-45 SEE IMAGES |
2016-07-15 | H2O | 15 | 168630 Gal | 204822 | STINGRAY PRESSURE PUMPING LLC | STAGE 46/46
50 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | 2073772 | 0 | 133 |
2017 | GULFPORT ENERGY CORPORATION | 2963985 | 4 | 359 |
2018 | GULFPORT ENERGY CORPORATION | 1382787 | 0 | 363 |
2019 | GULFPORT ENERGY CORPORATION | 248137 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | GULFPORT ENERGY CORPORATION | Brine | 15491 | 133 |
2017 | GULFPORT ENERGY CORPORATION | Brine | 20125 | 359 |
2018 | GULFPORT ENERGY CORPORATION | Brine | 10827 | 363 |
2019 | GULFPORT ENERGY CORPORATION | Brine | 2246 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1799596398 | 2018-8-1 0:00:0 | PW | No Violations | |
-1800236690 | 2020-2-14 0:00: | PW | No Violations | 0.20 |
-1836867048 | 2016-2-2 0:00:0 | PL | No Violations | 1.00 |
-1880377260 | 2015-11-10 0:00 | DD | No Violations | 2.00 |
-376172093 | 2015-10-9 0:00: | CS | No Violations | 7.00 |
-472296789 | 2018-6-14 0:00: | PW | No Violations | 0.50 |
-628671784 | 2016-10-5 0:00: | PW | No Violations | 1.00 |
-705538437 | 2015-11-2 0:00: | DD | No Violations | 1.00 |
0376172093 | 2015-10-09 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing cementing operations. Nomac Rig 83 drilled 393 of 24 hole. The rig then ran 393 of 18.625 J-55 casing with eight centralizers, a float shoe and a float collar. Stingray cemented the casing in place by circulating 126 barrels of class H cement with 2% CaCl and .25 pounds per gallon poly flake into the annular space. I witnessed twenty barrels of cement circulate to surface. |
0472296789 | 2018-06-14 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing that was open flowing. Annular pressure monitoring was in place, the intermediate casing gauge read 0 pounds per square inch, the surface casing gauge read 225 pounds per square inch. Production equipment included a Sand Separator, Gas Processing unit and 4- 400 barrel purge tanks, and a 50 barrel produced water tank shared with 34013209720000, 34013209730000, 34013209790000. Identification tags were present, and production was up to date. No violations were found at the time of my inspection. |
0628671784 | 2016-10-05 | Production Wells | No Violations | Completion efforts on this pad are finished. Production crews are on this site assembling the production equipment. Once production equipment is finalized the wells are anticipated to begin producing. |
0705538437 | 2015-11-02 | Drill / Deepen / Reopen | No Violations | My inspection today finds Nomac Rig 83 is drilling a 12.25 borehole at a depth of 7710. Fire extinguishers are staged around the location. |
1799596398 | 2018-08-01 | Production Wells | No Violations | Status check inspection found the well pad surface and lease road of stone construction, the lease road does have identification posted and a gate present. As you enter the well pad there is a Mark West midstream station on the left side. Situated in the center of the well pad is 4 producing wells all equipped with emergency shut down devices on the production tree outlet side past the 2 primary master valves, the production flow line pressure is 500 pounds per square inch (psi). The 5.5 production casing internal pressure is 1,000 psi. The well head A &B sections is equipped with valves and riser pipes with gauges present to monitor annular pressure. The A section riser pipe which gauges the pressure between the 13.375 and 9.625 diameter casing strings showed 180 pounds pressure. The B section which is the pressure between the 9.625 and 5.5 diameter casing strings has zero pressure showing on the gauge. The wells are selling into gas processing units with a total of 4 units present on location. At the front left hand corner of the well pad is the production facility consisting of 4 steel construction 400 barrel production tanks situated inside a polymer lined steel containment dike area. Fire extinguishers and emergency shut down control points are situated on the pad at all critical areas. Proper well identification is posted at each well along with hazard identification on each production tank. The well pad earthen berm is in good repair and the perimeter area of the well pad has vegetation established. |
1836867048 | 2016-02-02 | Preliminary Restoration | No Violations | On this day the production staff was laying pipeline up to the existing well. The site appeared to be in satisfactory condition. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed. |
1880377260 | 2015-11-10 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling contractor, Nomac Rig 83, is drilling an 8.5 borehole at a depth of 12,854. ECM trucks are removing rain water from location. I tested water in a puddle on location and at a drainage sump with a Quantab, both tests indicated total chlorides are under fifty parts per million. |
For data sources see[10]