Well ID: 34-013-20942 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.86,"lon":-80.87,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: York Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001259 | |
Farm/Lease Name: SPITFIRE | |
License Status: Producing | |
License Date: 2015-11-06 | |
Spud Date: 2016-04-09 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2016-05-18 | |
Well Total Depth: 20715.00 ft | |
Configuration: Horizontal | |
Latitude: 39.860000 | |
Longitude: -80.870000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2015-05-08 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:5/8/2015, Expired Date:5/7/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2015-11-06 | Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/6/2015, Expired Date:11/5/2017 12:00:00 PM, Drilling unit acres:482.2792, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2016-05-18 | |
Correction to Well | 2016-10-21 | CHANGE IN ACREAGE/TARGET/TAKEPOINT PER AS-DRILLED PLAT RCVD 09/30/2016-ALE |
Correction to Well | 2017-01-06 | CHANGE IN TAKEPOINT PER AS-COMPLETED PLAT-ALE |
Completion Report Received | 2017-01-30 | |
Construction Permit Expires | 2017-11-05 | |
Record Last Modified | 2018-09-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-12-28 | 10553 | 15833 | 768 |
10553 | 15833 | 768 | |
10553 | 15833 | 768 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2016-10-23 | H2O | 15 | 9787 Gal | 424200 | STINGRAY PRESSURE PUMPING LLC | STAGE 32/32
24 SHOTS |
2016-10-13 | H2O | 15 | 9185 Bbl | 396020 | STINGRAY PRESSURE PUMPING LLC | STAGE 1/32
24 SHOTS STAGE 2-31 SEE IMAGES |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | RICE DRILLING D LLC | 0 | 0 | 0 |
2017 | RICE DRILLING D LLC | 2748926 | 0 | 342 |
2018 | RICE DRILLING D LLC | 2611231 | 0 | 359 |
2019 | RICE DRILLING D LLC | 322079 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2016 | RICE DRILLING D LLC | Brine | 7759 | 0 |
2017 | RICE DRILLING D LLC | Brine | 72870 | 342 |
2018 | RICE DRILLING D LLC | Brine | 79055 | 359 |
2019 | RICE DRILLING D LLC | Brine | 11823 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1121997271 | 2020-6-23 0:00: | PL | No Violations | 0.40 |
-1443772201 | 2018-4-24 0:00: | PW | No Violations | 0.50 |
-1687100059 | 2018-3-28 0:00: | PW | No Violations | 0.50 |
-310214287 | 2017-10-12 0:00 | PW | No Violations | 1.00 |
-858652930 | 2018-11-16 0:00 | PL | No Violations | 0.50 |
0286382516 | 2018-03-29 | Production Wells | No Violations | Follow-up inspection on the location to see if the annular pressure gauges were installed. There was still no pressure gauge on annulus between the inside of the 13.375-inch diameter casing and the outside 9.625-inch diameter casing. |
0310214287 | 2017-10-12 | Production Wells | No Violations | This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains three 400-barrel production fluid holding tanks. Production records for this well are current to 2017 within RBDMS. |
0444328369 | 2018-03-28 | Production Wells | No Violations | On site inspection accompanied by ODNR Inspector Andrew Corder. The intention of the inspection is to verify annular pressures. On this day it was observed that the 13.375 well head section had a 2 diameter riser pipe protruding above ground level inside the tin horn cellar, no pressure gauge was present and the valve was in the closed position. The 9.625 diameter well head section also had a 2 diameter riser pipe with a valve in the open position and a pressure gauge present reading 2,780 (psi) pounds per square inch. The company was contacted and a Caleb Sterling was dispatched to location and confirmed which riser pipes were attached to what well head section since the well head lower (B) and complete (A) section is buried in stone inside the tin horn cellar. Mr. Sterling with Rice Energy now (EQT) was directed to install a gauge on the 13.375 well head section riser pipe and verify pressures. Mr. Sterling was also directed to address the pressure on the 2,780 psi on the 9.625 well head section. Mr. Sterling indicated a contract pumper had attempted to release the pressure on the 9.625 well head section on the previous weekend of March 24th- 25th -2018 and they were only successful in blowing the 9.625 well head section pressure down to 1,500 (psi). The area building pressure is the area between the 5.5 diameter casing annuli and the 9.625 casing internal side. Other wells in the direct area owned by the company were also discussed and it was discovered that there is high annular pressure on other wells that the company has been trying to address by blowing the wells down at the well head. It was suggested to Mr. Sterling that the company hire a professional flow back company to safely release the high pressure and begin a monitoring and discovery program to identify and potential well construction defects. |
0846831646 | 2016-05-09 | Drill / Deepen / Reopen | No Violations | My inspection today finds the drilling rig has reached a total depth of 9,541 and is cleaning the hole in preparation for running the 9.625 casing. |
0858652930 | 2018-11-16 | Preliminary Restoration | No Violations | Preliminary Restoration status check inspection found the well pad and lease road of stone construction and in good repair. The well pad does have an earthen berm erected around it. Vegetation appears to be sufficient and no earthen slips or erosion are visible on the day of my inspection however the restoration will have to be followed up on when there is not snow on the ground. There is (2) producing wells on the pad and since my last inspection annular pressure monitoring has been installed on the well head A&B sections with valves and gauges present, the valves are closed and the gauges are frozen over with ice to the point the manual gauges are not readable. There is electronic gauges present also. The riser pipes are tied into flow lines. Attached to the production tree is emergency shut down devices. Production equipment present is (2) gas processing units along with a production facility consisting of (3) steel construction 400 barrel fluid capacity tanks situated inside polymer lined steel containment dike area. Also present on the North side of the well pad is a contact tower and line heater. Proper well identification is posted at the well heads and entry point of the location. |
0892015210 | 2016-04-30 | Casing String Witnessed | No Violations | I am onsite to witness the surface casing installation and cementing operations. Patterson Drilling drilled 407 of 24 hole. The drilling rig then installed 397 of 94 pound per foot 20 casing. The final seven feet of pipe was washed to bottom in order to clear the hole of debris. Baker Hughes cemented the casing in place by circulating 125 barrels of class A cement into the annulus of the casing. Sixteen barrels of cement circulated to surface. The wiper plug failed to release from the head until late, resulting in the wiper plug not landing. The casing integrity test will be performed, before drilling the cement plug, in accordance with 1501:9-1-08(D)(3)(b). |
1443772201 | 2018-04-24 | Production Wells | No Violations | The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains three 400-barrel production fluid holding tanks. Annular pressures read on the gauges provided appeared to be 1000 pounds in between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 2506 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. The production records within RBDMS are currently updated to 2017. |
1687100059 | 2018-03-28 | Production Wells | No Violations | The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains three 400-barrel production fluid holding tanks. Annular pressures read on the gauges provided appeared to be 2780 pounds on the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. Caleb Sterling, a well tender for EQT, was on site and was notified that there should be a pressure rating gauge on the 9.625-inch diameter casing string annulus. He stated they would make sure they added this gauge for proper monitoring. Caleb was also informed that the company should properly release the pressure on the backside of the 5.5-inch diameter casing string. The production records within RBDMS are currently updated to 2017. |
2046884386 | 2016-02-10 | Surface Facility Construction | No Violations | On this day the operator was clearing trees on the pad for the construction phase of the well site. Once the pad construction portion is complete the will begin the drilling phase of the well site. |
286382516 | 2018-3-29 0:00: | PW | No Violations | 0.50 |
444328369 | 2018-3-28 0:00: | PW | No Violations | 1.00 |
846831646 | 2016-5-9 0:00:0 | DD | No Violations | |
892015210 | 2016-4-30 0:00: | CS | No Violations | 8.00 |
For data sources see[9]