X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20887

Well Details

Well ID: 34-013-20887
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Warren Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001170
Farm/Lease Name: CATTLE 210198
License Status: Producing
License Date: 2014-11-10
Spud Date: 2015-06-13
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2015-09-15
Well Total Depth: 18150.00 ft
Configuration: Horizontal
Latitude: 40.030000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-11-10 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:11/10/2014, Expired Date:11/9/2016 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-09-15
Correction to Well 2016-03-25 change in target/takepoint per asdrilled plat ALE
Completion Report Received 2016-10-26
Construction Permit Expires 2016-11-09
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 05/12/2016 05/31/2016 8766 12,357,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 100 mesh Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 1.07017 0
Scale Clear 112S Lubrizol Scale Inhibitor Water 7732-18-5 85 0.00759 0
Polyacrylate Copolymer 7732-18-5 15 0.00134 0
Hydrochloric Acid FSTI Acidizing Water 7732-18-5 64 0.09404 0
Hydrochloric Acid (Hydrogen Chloride) 7732-18-5 36 0.0529 0
NEFE-180 Chemplex Corrosion Inhibitor/Iron Control Olefin Proprietary 5 0.00005000 0
2-Propyn-1-ol 107-19-7 5 0.00005000 0
Coconut oil acid diethanolamine 68603-42-9 5 0.00005000 0
Fatty acids, tall oil 61790-12-3 5 0.00005000 0
Alcohols, C14-15, ethoxylated 68951-67-7 5 0.00005000 0
Methanol 67-56-1 35 0.00032 0
2-Ethylhexanol 104-76-7 10 0.00009000 0
Acetic acid 64-19-7 65 0.0006 0
FRA-405 Lubrizol Friction Reducer Distillates, Petroleum, Hydrotreated Light 64742-47-8 30 0.03013 0
Water 7732-18-5 70 0.07031 0
Fresh water Gulfport Energy Carrier/Based Fluid Water 7732-18-5 100 89.1698 0
40/70 White Taylor Frac Proppant Ceramic materials and wares, chemicals 14808-60-7 100 9.66321 0
B-2512 Aquaserv Biocide Glutaraldehyde 111-30-8 30 0.00686 0
Ethanol 64-17-5 5 0.00114 0
Water 7732-18-5 51 0.01165 0
Quaternary ammonium compounds,

benzyl-C12-16-alkyldimethyl, chlorides

68424-85-1 4 0.00091 0
Didecyldimethylammonium chloride 7173-51-5 10 0.00229 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-05-12 H2O 15 6213 Bbl 272800 STINGRAY PRESSURE PUMPING LLC STAGE 45/45

50 SHOTS

2016-05-12 H2O 0 6842 Bbl 275380 STINGRAY PRESSURE PUMPING LLC STAGE 1/45

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 2640999 2417 186
2017 GULFPORT ENERGY CORPORATION 3255436 324 364
2018 GULFPORT ENERGY CORPORATION 1661556 2 364
2019 GULFPORT ENERGY CORPORATION 305308 0 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 12237 186
2017 GULFPORT ENERGY CORPORATION Brine 6211 364
2018 GULFPORT ENERGY CORPORATION Brine 3106 364
2019 GULFPORT ENERGY CORPORATION Brine 608 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1144788567 2018-5-10 0:00: PW No Violations 0.50
-2002150076 2018-1-11 0:00: PW No Violations 0.50
-458835338 2015-9-15 0:00: DD No Violations 1.00
-878917218 2020-3-13 0:00: PW No Violations 0.20
0352040498 2015-12-15 Preliminary Restoration No Violations Vegetation has been established at this well site. Erosion and sediment controls are in place and functioning properly. Preliminary Restoration for this site has passed.
0458835338 2015-09-15 Drill / Deepen / Reopen No Violations Nomac Rig # 82 has reached total depth and are beginning to run the 5.5 production casing. Cementing of this string shall take place once the casing is landed.
0461577600 2017-07-14 Production Wells No Violations The well is currently equipped properly to be considered capable of production. The well appears to be free flowing currently with no artificial lift technology in place. The well is piped over to a gas processing unit and then routed to sale and to the tank battery. The tank battery contains four 400 barrel production fluid storage tanks and a 50 barrel fluid storage tank. The production records in RBDMS are current to 2017. I was accompanied by Supervisor Brent Bear during this inspection.
1144788567 2018-05-10 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing that was open flowing with valves in the open position. Annular pressure monitoring was in place for the 9.625 inch diameter casing gauge read 1225 pounds per square inch, the 13.375 inch diameter casing gauge read 0 pounds per square inch. Production equipment included a separator, Gas Processing unit, line heater, and 4- 400 barrel purge tanks shared with 3401320886, 3401320888. Pressure release lines had been installed on annular casings. Identification tags were present and production was up to date.
1536594214 2018-09-10 Production Wells No Violations Status check inspection found 3 wells total producing on location. The lease road and well pad surface are of stone surface construction and are in good repair. There is a 3rd party midstream operation along the lease road at the right front corner of the well pad. The production equipment consists of 3 gas processing units and a tank farm that is made up of 4 steel construction 400 barrel production tanks along with a 50 barrel steel tank all located inside a polymer lined steel containment dike area. There is signage posted at the entry point of the lease road and at each well head, hazard warning labels are posted on the tank battery. There is a gate across the lease road that is kept locked when no one is present on site. The well head is equipped with a lower B and upper A section with 2 diameter riser pipes present on the outlet ports on each section that are equipped with valves and gauges. The A section gauge that monitors the pressure between the 13.375 and 9.625 diameter casing strings reads zero pressure and the B section gauge which monitors the pressure between the 5.5 and 9.625 diameter strings reads 1,200 pounds pressure. The 5.5 diameter production casing well head section gauge reads 750 pounds pressure while the tubing head and flow line reads 150 pounds pressure.
1794080579 2020-11-2 0:00: PW No Violations 0.20
2002150076 2018-01-11 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. There are gas processing units on this site. The production area currently contains four 500-barrel production fluid holding tanks. The production records for this well within the RBDMS system are current up to 2017.
352040498 2015-12-15 0:00 PL No Violations 1.00
461577600 2017-7-14 0:00: PW No Violations 0.50

For data sources see[9]

References